Breadcrumb

School of Medicine Education Building 2

Design Build Procurement Status

Please be advisded that the bid advertisement for the prequalification of the Design Builder has been posted on the PD&C site at the following link:

https://pdc.ucr.edu/business-opportunities/contractors#school_of_medicine_education_building_ii_prequalification_bid_advertisement_project_no_954045

 

 

Please be advised that the Prequalification package is now available at the following link:

https://pdc.ucr.edu/document/954045-som-education-bldg-ii-design-builder-prequlification-package

PDC Contacts

Project Manager: Mihai Gavan - 951-827-6959

Planner: Melissa Garrety - 951- 827-7376

Project Description

The University of California Riverside proposes to construct the School of Medicine (SOM)Educational Building 2, a new facility of approximately 65,000 assignable square feet that will directly support the academic and programmatic mission of the UCR School of Medicine by providing adequate space for existing needs, as well as allowing for future expansion of the class size (up to 125 students per class).

The proposed building is anticipated to provide up to 65,000 assignable square feet (asf) within approximately 100,000 gross square feet. During the development of the project performance requirements, the campus will maximize the assignable and gross square feet provided in the facility. The space program will incorporate the following types of spaces, to complement SOM's existing program:

  • instruction and instruction support spaces such as classrooms, specialized teaching spaces, and lecture halls;
  • student support and study facilities including study/lounge spaces necessary to comply with accreditation standards; and,
  • academic and administrative offices and support spaces

SOM Education Bldg 2

  • Project Details
  • Construction
  • News

Current Activity

  • Develop programming elements and Basis of Deisgn (BOD) document for the new building together with the School of Medicine workgroup and programming consultant-AECOM
  • Conduct Site Investingation

Next Steps

  • Prequalification of Design Build Teams
  • Design Build procurement and award
  • Regents approval
  • Design Development
  • Construction

Construction Notices

N/A

Project Location

Project Anticipated Timeline