SoCal OASIS™ Park
With a focus on sustainability, innovation and social inclusion, the SoCal OASIS™ Park is a center for research in climate change, air quality and mobility aimed at preparing the next generation of the Clean Tech workforce for Riverside and the Inland Empire. Located along University Avenue between downtown and the UC Riverside campus, the SoCal OASIS™ Park is a catalyst project along Riverside’s ‘Innovation Corridor’ while also acting as a gateway to the UC Riverside campus. The project is a collaboration between UC Riverside’s Bourns College of Engineering Center for Environmental Research and Technology (CE-CERT), Office of Innovation and Entrepreneurship, and the University Extension to provide a space where university research intersects with local entrepreneurs and future clean tech workers.
With a total site area of approximately 4 acres, the project will provide approximately 39,000 Sq. Ft of research and office space and will include clean tech labs along with a maker space for prototyping new technologies. The project includes several community-oriented spaces, such as office space for local entrepreneurs, a large active-hybrid meeting and learning space, display space to share research being conducted and ample outdoor areas for shared community use. The SoCal OASIS™ Park intends to create a welcoming, transparent and accessible space for all members of the community. The project fronts University Avenue with a landscaped plaza and draws people into the site through a multimodal pedestrian and bicycle corridor that connects University Avenue to Everton Place. Along this landscaped path, there are multiple opportunities for gathering at a variety of scales, including a large, shaded courtyard.
The project will support the six pillars identified in the Opportunities for Advancement, Social Inclusion and Sustainability (OASIS) initiative:
- Clean Energy & Fuels
- Clean Transportation & Infrastructure
- Natural Resource Management
- Agriculture Technology & Food Security
- Community Health & Disparities
- Human Development
The project also involves the demolition of the existing University Extension building.
Project Scope:
The building will provide approximately 39,000 Sq. Ft, along with exterior circulation and gathering areas. The program includes the following spaces:
- Research Laboratories
- Makers Space
- Active-Hybrid Learning Classroom
- Meeting Rooms
- Event Space
- Incubator Facilities
- Office Space
- Open-Office Workstations
- Shared Building Resources (Lobby, Multipurpose room(s) etc.)
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #97
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (11/9/2026)
Current Week – November 9, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Parking Lot 51 Entrance Everton Closed
Low-level and mid-level construction noise
Building Site
Parking Lot Entrance Prep median sidewalk
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start) – 11.10 - W Light Bases, 11.13 S Curb
Concrete trucks
Mid-level construction noise
Building Site
Tree Setting
Forklift
Low-level and mid-level construction noise
Building Site
Site Hardscape East / West
Misc. Equipment
Low-level and mid-level construction noise
Building Site
Acoya Wood East Trellis
Scissor Lift
Low-level and mid-level construction noise
Building
UCR Lock Shop 11.14
Low-level and mid-level construction noise
Building
Exterior Arch Punch
Low-level and mid-level construction noise
Building
Star Link Antenna
Low-level and mid-level construction noise
Building
PV Final Connections
Low-level and mid-level construction noise
Building
Interior UCR Punchlist Corrections
Low-level construction noise
Building
Lobby Nine Wood Wall
Low-level and mid-level construction noise
Building
Window Shades
Low-level and mid-level construction noise
Building
Punchlist Corrections
Low-level and mid-level construction noise
Building
Cx-FPT
Scissor Lift
Low-level construction noise
Week of November 16, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Parking Lot 51 Entrance Everton Closed
Low-level and Mid-level construction noise
Building Site
Light Pole Base Curbs Everton Parking Lot
Low-level and Mid-level construction noise
Building Site
Concrete Placement (5AM Start) – 11.17, 11.18 & 11.20 – West Courtyard & Median Sidewalks
Concrete trucks
Mid-level construction noise
Building Site
Metal Panels Mech Screen Remediation
Boom Lift
Low-level and Mid-level construction noise
Building Site
Tree Setting
Forklift
Low-level and Mid-level construction noise
Building Site
Landscape
Skip Loader
Low-level and Mid-level construction noise
Building Site
Hardscape East / West
Misc. Equipment
Low-level and Mid-level construction noise
Building Site
Site Lighting
Scissor Lift
Low-level and Mid-level construction noise
Building Site
Grading East Pre-Paving
Paving 11-20 East
Low-level and Mid-level construction noise
Building
Fire Alarm Testing
Low-level construction noise
Building
UCR Punch Sign-Offs
Low-level construction noise
Week of November 23, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Parking Lot 51 Entrance Everton Closed
Low-level and Mid-level construction noise
Building Site
Concrete Placement (5AM Start) – 11.2, 11.24 & 11.25
Concrete Trucks
Low-level and Mid-level construction noise
Building Site
Grading West Pre-Paving
Paving 12-4 West
Low-level and Mid-level construction noise
Building Site
Site Lights
Forklift
Low-level and Mid-level construction noise
Building Site
Landscape
Low-level and Mid-level construction noise
Building
Interior UCR Punchlist Sign-Offs
Low-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
UCR South Parking Lot Entrance Closed (Everton) – (10/26 – 11/20)
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #96
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (11/2/2026)
Current Week – November 2, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Parking Lot 51 Entrance Everton Closed
Low-level and mid-level construction noise
Building Site
Parking Lot Entrance form median curbs
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start) – 11.2 - W V Gutter, 11.6 Median
Concrete trucks
Mid-level construction noise
Building Site
Tree Setting
Forklift
Low-level and mid-level construction noise
Building Site
Site Hardscape East / West
Misc. Equipment
Low-level and mid-level construction noise
Building Site
Fascia / Parapet Caps
Scissor Lift
Low-level construction noise
Building Site
Irrigation
Mini Ex
Low-level and mid-level construction noise
Building Site
Acoya Wood
Scissor Lift
Low-level and mid-level construction noise
Building Site
Glazing Replacement
Boom Lift & Forklift
Low-level and mid-level construction noise
Building
Star Link Antenna
Low-level and mid-level construction noise
Building
Fire Alarm Testing
Low-level and mid-level construction noise
Building
Interior UCR Punchlist Corrections
Low-level construction noise
Building
Fire Alarm Testing
Low-level and mid-level construction noise
Building
Cx-FPT / Fire Alarm Testing
Scissor Lift
Low-level construction noise
Week of November 9, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Parking Lot 51 Entrance Everton Closed
Low-level and Mid-level construction noise
Building Site
Light Pole Base Curbs Everton Parking Lot
Low-level and Mid-level construction noise
Building Site
Grade South Old Trailer Area
Loader
Building Site
Concrete Placement (5AM Start) – 11.11 – West 11.13 – Everton
Concrete trucks
Mid-level construction noise
Building Site
Metal Panels Mech Screen Remediation
Boom Lift
Low-level and Mid-level construction noise
Building Site
Tree Setting
Forklift
Low-level and Mid-level construction noise
Building Site
Landscape
Skip Loader
Low-level and Mid-level construction noise
Building Site
Hardscape East / West
Misc. Equipment
Low-level and Mid-level construction noise
Building Site
Site Lighting
Scissor Lift
Low-level and Mid-level construction noise
Building Exterior
Arch Exterior / Roof Punch Walk
Low-level construction noise
Building
Lobby Nine Wood
Low-level construction noise
Building
Bumper Rail
Low-level construction noise
Building
UCR Punch Corrections
Low-level construction noise
Building
Cx - FPT
Low-level construction noise
Week of November 16, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Parking Lot 51 Entrance Everton Closed
Low-level and Mid-level construction noise
Building Site
Concrete Placement (5AM Start) – 11.2, 11.10 & 11.12 (Courtyard & Everton)
Concrete Trucks
Low-level and Mid-level construction noise
Building Site
Grading East Pre-Paving
Paving 11-20 East
Low-level and Mid-level construction noise
Building Site
Site Lights
Forklift
Low-level and Mid-level construction noise
Building Site
Landscape
Low-level and Mid-level construction noise
Building
Interior UCR Punchlist – Sign Offs
Low-level construction noise
Building
Cx - FPT
Low-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
UCR South Parking Lot Entrance Closed (Everton) – (10/26 – 11/20)
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #95
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (10/26/2026)
Current Week – October 26, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
CLOSE DOWN EVERTON PARKING LOT ENTRANCE
Fence
Low-level and mid-level construction noise
Building Site
Demo Parking Lot Entrance
Back-hoe
Mid-level construction noise
Building Site
Excavate Parking Lot Entrance Underground
Back-hoe
Low-level and mid-level construction noise
Building Site
Trailer Removal
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start) – 10.28 - W V Gutter, 10.30 Ser Curb
Concrete trucks
Mid-level construction noise
Building Site
Tree Setting East
Forklift
Low-level and mid-level construction noise
Building Site
West Light Bore Shot
Bare Equipment
Low-level and mid-level construction noise
Building Site
Site Hardscape East / West
Misc. Equipment
Low-level and mid-level construction noise
Building Site
Fascia / Parapet Caps
Scissor Lift
Low-level construction noise
Building Site
Irrigation
Mini Ex
Low-level and mid-level construction noise
Building Site
Exterior Cameras
Scissor Lift
Low-level and mid-level construction noise
Building Site
Acoya Wood
Scissor Lift
Low-level and mid-level construction noise
Building Site
Glazing Replacement
Boom Lift & Forklift
Low-level and mid-level construction noise
Building
Interior UCR Punchlist Corrections
Low-level construction noise
Building
Fire Alarm Testing
Low-level and mid-level construction noise
Building
Cx-PFT / Fire Alarm Testing
Scissor Lift
Low-level construction noise
Week of November 2, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Parking Lot 51 Entrance Everton Closed
Low-level and Mid-level construction noise
Building Site
Light Pole Base Curbs Everton Parking Lot
Low-level and Mid-level construction noise
Building Site
Grade South Old Trailer Area
Loader
Building Site
Concrete Placement (5AM Start) – 11.3 – East LO’s, 11.6 – South Curb
Concrete trucks
Mid-level construction noise
Building Site
Metal Panels Mech Screen Remediation
Boom Lift
Low-level and Mid-level construction noise
Building Site
Tree Setting West
Forklift
Low-level and Mid-level construction noise
Building Site
Landscape
Skip Loader
Low-level and Mid-level construction noise
Building Site
Hardscape East / West
Misc. Equipment
Low-level and Mid-level construction noise
Building Site
Site Lighting
Scissor Lift
Low-level and Mid-level construction noise
Building Site
Glazing Replacement
Boom Lift & Forklift
Low-level and Mid-level construction noise
Building Exterior
Arch Exterior / Roof Punch Walk
Low-level construction noise
Building
UCR Punch Sign-Offs
Scissor Lift
Low-level construction noise
Building
Cx - FPT
Low-level construction noise
Week of November 9, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Parking Lot 51 Entrance Everton Closed
Low-level and Mid-level construction noise
Building Site
Concrete Placement (5AM Start) – 11.2, 11.10 & 11.12 (Courtyard & Everton)
Concrete Trucks
Low-level and Mid-level construction noise
Building Site
Grading East pre Paving
Low-level and Mid-level construction noise
Building Site
Site Lights
Forklift
Low-level and Mid-level construction noise
Building Site
Landscape
Low-level and Mid-level construction noise
Building Site
Glazing Replacement Detailing
Boom Lift & Forklift
Low-level and Mid-level construction noise
Building
Interior UCR Punchlist – Sign Offs
Low-level construction noise
Building
Cx - FPT
Low-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
UCR South Parking Lot Entrance Closed (Everton) – (10/26 – 11/20)
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #94
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (10/19/2026)
Current Week – October 19, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – 10.20
Concrete trucks
Mid-level construction noise
Building Site
PV Underground / E-Shut-Off
Mini Ex
Low-level and mid-level construction noise
Building Site
Tree Setting
Forklift
Low-level and mid-level construction noise
Building Site
Light Pole Excavation
Back-hoe
Low-level and mid-level construction noise
Building Site
Site Hardscape East / West
Misc. Equipment
Low-level and mid-level construction noise
Building Site
Bio-Basin
Skip Loader
Low-level construction noise
Building Site
Fascia / Parapet Caps
Scissor Lift
Low-level construction noise
Building Site
Underground Site Electrical
Mini Ex
Low-level construction noise
Building Site
Irrigation
Mini Ex
Low-level and mid-level construction noise
Building Site
Exterior Lights / Devices
Scissor Lift
Low-level and mid-level construction noise
Building Site
Acoya Wood
Scissor Lift
Low-level and mid-level construction noise
Building Site
Glazing Replacement
Boom Lift & Forklift
Low-level and mid-level construction noise
Building
Interior UCR Punchlist Corrections
Low-level construction noise
Building
Fire Alarm Testing
Low-level and mid-level construction noise
Building
UCR Head-In Equipment / WAPS
Scissor Lift
Low-level construction noise
Building
Interior Finishes – North / South
Scissor Lifts
Low-level construction noise
Building
Cx-PFT / Fire Alarm Testing
Scissor Lift
Low-level construction noise
Week of October 26, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Parking Lot 51 Entrance Everton Closed
Low-level and Mid-level construction noise
Building Site
Demo – Parking Lot 51 Entrance Everton
Low-level and Mid-level construction noise
Building Site
Construction Trailer Removal
Low-level and Mid-level construction noise
Building Site
Concrete Placement (5AM Start) – 10.26, 10.28 & 10.30
Concrete trucks
Mid-level construction noise
Building Site
Metal Panels Mech Screen Remediation
Low-level and Mid-level construction noise
Building Site
Tree Setting
Forklift
Low-level and Mid-level construction noise
Building Site
Bio Basin
Skip Loader
Low-level and Mid-level construction noise
Building Site
Hardscape East / West
Misc. Equipment
Low-level and Mid-level construction noise
Building Site
Exterior Lights / Trim
Scissor Lift
Low-level and Mid-level construction noise
Building Site
Glazing Replacement
Boom Lift & Forklift
Low-level and Mid-level construction noise
Building
UCR Punch Corrections
Scissor Lift
Low-level construction noise
Building
Cx - FPT
Low-level construction noise
Week of November 2, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – 11.2, 11.4 & 11.6
Concrete Trucks
Mid-level construction noise
Building Site
Parking Lot 51 Entrance Everton Closed
Low-level and Mid-level construction noise
Building Site
Parking Lot 51 Entrance Everton - UG
Low-level and Mid-level construction noise
Building Site
Grading South Lot
Low-level and Mid-level construction noise
Building Site
Tree Setting & Landscape
Forklift
Low-level and Mid-level construction noise
Building Site
Hardscape
Low-level and Mid-level construction noise
Building Site
Glazing Replacement
Boom Lift & Forklift
Low-level and Mid-level construction noise
Building
Interior UCR Punchlist - Corrections
Low-level construction noise
Building
Cx - FPT
Low-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
UCR South Parking Lot Entrance Closed (Everton) – (10/26 – 11/20)
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #93
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (10/12/2026)
Current Week – October 12, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – 10.14 & 10.16
Concrete trucks
Mid-level construction noise
Building Site
PV Underground / E-Shut-Off
Mini Ex
Low-level and mid-level construction noise
Building Site
Tree Setting
Forklift
Low-level and mid-level construction noise
Building Site
Light Pole Excavation
Back-hoe
Low-level and mid-level construction noise
Building Site
Site Hardscape East / West
Misc. Equipment
Low-level and mid-level construction noise
Building Site
Bio-Basin
Skip Loader
Low-level construction noise
Building Site
Fascia / Parapet Caps
Scissor Lift
Low-level construction noise
Building Site
Underground Site Electrical
Mini Ex
Low-level construction noise
Building Site
Irrigation
Mini Ex
Low-level and mid-level construction noise
Building Site
Exterior Lights / Devices
Scissor Lift
Low-level and mid-level construction noise
Building Site
Acoya Wood
Scissor Lift
Low-level and mid-level construction noise
Building Site
Glazing Replacement
Boom Lift & Forklift
Low-level and mid-level construction noise
Building
Interior UCR Punchlist
Low-level construction noise
Building
Fire Alarm Testing
Low-level and mid-level construction noise
Building
UCR Head-In Equipment / WAPS
Scissor Lift
Low-level construction noise
Building
Interior Finishes – North / South
Scissor Lifts
Low-level construction noise
Building
Cx-PFT / Fire Alarm Testing
Scissor Lift
Low-level construction noise
Week of October 19, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – 10.19, 10.21 & 10.23
Concrete trucks
Mid-level construction noise
Building Site
Metal Panels Mech Screen Remediation
Low-level and Mid-level construction noise
Building Site
Tree Setting
Forklift
Low-level and Mid-level construction noise
Building Site
Bio Basin
Skip Loader
Low-level and Mid-level construction noise
Building Site
Hardscape East / West
Misc. Equipment
Low-level and Mid-level construction noise
Building Site
Exterior Lights / Trim
Scissor Lift
Low-level and Mid-level construction noise
Building Site
Glazing Replacement
Boom Lift & Forklift
Low-level and Mid-level construction noise
Building
UCR Punch Corrections
Scissor Lift
Low-level construction noise
Building
Interior UCR Punchlist - Corrections
Low-level construction noise
Building
Cx - PFT
Low-level construction noise
Week of October 26, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – 10.26, 10.28 & 10.30
Concrete Trucks
Mid-level construction noise
Building Site
Parking Lot 51 Entrance Everton Closed
Low-level and Mid-level construction noise
Building Site
Demo – Parking Lot 51 Entrance Everton
Low-level and Mid-level construction noise
Building Site
Construction Trailer Removal
Low-level and Mid-level construction noise
Building Site
Tree Setting & Landscape
Forklift
Low-level and Mid-level construction noise
Building Site
Hardscape
Low-level and Mid-level construction noise
Building Site
Glazing Replacement
Boom Lift & Forklift
Low-level and Mid-level construction noise
Building
Interior UCR Punchlist - Corrections
Low-level construction noise
Building
Cx - FPT
Low-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
UCR South Parking Lot Entrance Closed (Everton) – (10/26 – 11/20)
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #92
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (10/5/2026)
Current Week – October 5, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – 10.5, 10.7 & 10.9
Concrete trucks
Mid-level construction noise
Building Site
Roof Remediation – Paint, Framing & Plaster
Low-level and mid-level construction noise
Building Site
Light Pole Excavation
Back-hoe
Low-level and mid-level construction noise
Building Site
Site Hardscape East / West
Misc. Equipment
Low-level and mid-level construction noise
Building Site
Bio-Basin Liner South
Low-level construction noise
Building Site
Fascia / Parapet Caps
Scissor Lift
Low-level construction noise
Building Site
Underground Site Electrical
Mini Ex
Low-level construction noise
Building Site
Irrigation
Mini Ex
Low-level and mid-level construction noise
Building Site
Exterior Lights / Devices
Scissor Lift
Low-level and mid-level construction noise
Building Site
Acoya Wood
Scissor Lift
Low-level and mid-level construction noise
Building
Interior Architectural Punchlist Corrections
Low-level construction noise
Building
Interior Finishes – North / South
Scissor Lifts
Low-level construction noise
Building
TAB Report / Fire Alarm Testing
Scissor Lift
Low-level construction noise
Week of October 12, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – 10.12, 10.14 & 10.16
Concrete trucks
Mid-level construction noise
Building Site
Framing Mech Screen Remediation
Low-level and Mid-level construction noise
Building Site
Plaster Remediation
Low-level and Mid-level construction noise
Building Site
Bio Basin Liner - South
Low-level and Mid-level construction noise
Building Site
Hardscape East / West
Misc. Equipment
Low-level and Mid-level construction noise
Building Site
PV Underground / E-Shut-Off
Mini Ex
Low-level and Mid-level construction noise
Building Site
Fascia / Coping Cap
Scissor Lift
Low-level and Mid-level construction noise
Building Site
Exterior Lights / Trim
Scissor Lift
Low-level and Mid-level construction noise
Building
UCR IT Head-In Install
Low-level construction noise
Building
Interior UCR Punch List
Low-level construction noise
Building
Cx - PFT / Fire Alarm Testing
Low-level construction noise
Week of October 19, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – 10.19, 10.21 & 10.23
Concrete Trucks
Mid-level construction noise
Building Site
Bio Basin Infill
Low-level and Mid-level construction noise
Building Site
Hardscape
Low-level and Mid-level construction noise
Building Site
Fascia/ Coping Cap
Scissor Lift
Low-level and Mid-level construction noise
Building
Interior UCR Punchlist - Corrections
Low-level construction noise
Building
Cx PFT / Fire Alarm Testing
Scissor Lift
Low-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
UCR South Parking Lot Entrance Closure (Everton) – (10/26 – 11/20)
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #91
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (9/28/2026)
Current Week – September 28, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – TBD
Concrete trucks
Mid-level construction noise
Building Site
Roof Remediation – Roofing & Paint
Low-level and mid-level construction noise
Building Site
Light Pole Excavation
Back-hoe
Low-level and mid-level construction noise
Building Site
Site Hardscape East / West
Misc. Equipment
Low-level and mid-level construction noise
Building Site
Bio-Basin Liner South
Low-level construction noise
Building Site
Roofing Parapet Caps
Scissor Lift
Low-level construction noise
Building Site
Underground Site Electrical
Mini Ex
Low-level construction noise
Building Site
Exterior Fascia
Scissor Lift
Low-level and mid-level construction noise
Building Site
Exterior Lights / Devices
Scissor Lift
Low-level and mid-level construction noise
Building Site
Acoya Wood
Scissor Lift
Low-level and mid-level construction noise
Building
Architectural Punchlist
Low-level construction noise
Building
Interior Finishes – North / South
Scissor Lifts
Low-level construction noise
Building
TAB
Scissor Lift
Low-level construction noise
Week of October 5, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – TBD
Concrete trucks
Mid-level construction noise
Building Site
Framing Mech Screen Remediation
Low-level and Mid-level construction noise
Building Site
Plaster Remediation
Low-level and Mid-level construction noise
Building Site
Bio Basin Liner - South
Low-level and Mid-level construction noise
Building Site
Hardscape East / West
Misc. Equipment
Low-level and Mid-level construction noise
Building Site
PV Underground / E-Shut-Off
Scissor Lift
Low-level and Mid-level construction noise
Building Site
Fascia / Coping Cap
Scissor Lift
Low-level and Mid-level construction noise
Building Site
Exterior Lights / Trim
Scissor Lift
Low-level and Mid-level construction noise
Building
IT Head-In Install
Low-level construction noise
Building
Architectural Punch List - Corrections
Low-level construction noise
Building
TAB Report
Low-level construction noise
Week of October 12, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – TBD
Concrete Trucks
Mid-level construction noise
Building Site
Bio Basin Liner
Low-level and Mid-level construction noise
Building Site
Hardscape
Low-level and Mid-level construction noise
Building Site
Fascia
Scissor Lift
Low-level and Mid-level construction noise
Building
UCR Punchlist
Low-level construction noise
Building
Cx / Fire Alarm Testing
Scissor Lift
Low-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
N/A - TBD
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #90
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (9/21/2026)
Current Week – September 21, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – TBD
Concrete trucks
Mid-level construction noise
Building Site
Crane for AHU#3
Crane
Mid-level construction noise
Building Site
Roofing Remediation
Low-level and mid-level construction noise
Building Site
East Light Pole Excavation
Back-hoe
Low-level and mid-level construction noise
Building Site
Site Hardscape East / West
Misc. Equipment
Low-level and mid-level construction noise
Building Site
Bio-Basin Liner
Low-level construction noise
Building Site
Roofing Parapet Caps
Scissor Lift
Low-level construction noise
Building Site
PV Panel Elec Underground for E-Shut-Off
Mini Ex
Low-level construction noise
Building Site
Exterior Fascia
Scissor Lift
Low-level and mid-level construction noise
Building Site
Exterior Lights / Devices
Scissor Lift
Low-level and mid-level construction noise
Building
Work To Complete
Low-level construction noise
Low-level construction noise
Building
Acoya Wood
Scissor Lifts
Low-level construction noise
Building
Interior Finishes – North / South
Scissor Lifts
Low-level construction noise
Building
TAB
Scissor Lift
Low-level construction noise
Week of September 28, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – TBD
Concrete trucks
Mid-level construction noise
Building Site
Roofing Remediation
Low-level and Mid-level construction noise
Building Site
Framing Mech Screen Remediation
Low-level and Mid-level construction noise
Building Site
Plaster Remediation
Low-level and Mid-level construction noise
Building Site
Bio Basin Liner
Low-level and Mid-level construction noise
Building Site
Hardscape East / West
Misc. Equipment
Low-level and Mid-level construction noise
Building Site
PV Underground / E-Shut-Off
Scissor Lift
Low-level and Mid-level construction noise
Building Site
Fascia
Scissor Lift
Low-level and Mid-level construction noise
Building Site
Exterior Lights / Trim
Scissor Lift
Low-level and Mid-level construction noise
Building
IT Head-In Install
Low-level construction noise
Building
Architectural Punch List
Low-level construction noise
Building
TAB
Scissor Lift
Low-level construction noise
Week of October 5, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – TBD
Concrete Trucks
Mid-level construction noise
Building Site
Bio Basin Liner
Low-level and Mid-level construction noise
Building Site
Hardscape West
Low-level and Mid-level construction noise
Building Site
Fascia
Scissor Lift
Low-level and Mid-level construction noise
Building Site
Exterior Lights / Trim
Scissor Lift
Low-level and Mid-level construction noise
Building
Architectural Punch List Corrections
Low-level construction noise
Building
Cx / Fire Alarm
Scissor Lift
Low-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
N/A - TBD
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #89
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (9/14/2026)
Current Week – September 14, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – East / West / South Curb/Gutter – 9.15 & 9.17
Concrete trucks
Mid-level construction noise
Building Site
South Grading
Heavy Equipment
Low-level and mid-level construction noise
Building Site
Site Hardscape East / West
Misc. Equipment
Low-level and mid-level construction noise
Building Site
Bio-Basin Liner
Low-level construction noise
Building Site
Roofing Parapet Caps
Scissor Lift
Low-level construction noise
Building Site
PV Panels
Scissor Lift
Low-level construction noise
Building Site
Exterior Fascia
Scissor Lift
Low-level and mid-level construction noise
Building Site
Exterior Lights / Devices
Scissor Lift
Low-level and mid-level construction noise
Building
Fabric Wall Panels
Low-level construction noise
Low-level construction noise
Building
Acoya Wood
Scissor Lifts
Low-level construction noise
Building
Interior Finishes – North / South
Scissor Lifts
Low-level construction noise
Building
TAB
Scissor Lift
Low-level construction noise
Week of September 21, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – TBD
Concrete trucks
Mid-level construction noise
Building Site
Bio Basin Liner
Low-level and Mid-level construction noise
Building Site
Hardscape East / West
Misc. Equipment
Low-level and Mid-level construction noise
Building Site
PV Underground / E-Shut-Off
Scissor Lift
Low-level and Mid-level construction noise
Building Site
Fascia
Scissor Lift
Low-level and Mid-level construction noise
Building Site
Exterior Lights / Trim
Scissor Lift
Low-level and Mid-level construction noise
Building
Acoya Wood
Low-level construction noise
Building
Fabric Wall Panels
Low-level construction noise
Building
Interior Finishes – North & South – Trim & Specialties
Low-level construction noise
Building
TAB
Scissor Lift
Low-level construction noise
Week of September 28, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – TBD
Concrete Trucks
Mid-level construction noise
Building Site
Bio Basin Liner
Low-level and Mid-level construction noise
Building Site
PV Electrical
Low-level and Mid-level construction noise
Building Site
Hardscape West
Low-level and Mid-level construction noise
Building Site
Fascia
Scissor Lift
Low-level and Mid-level construction noise
Building Site
Exterior Lights / Trim
Scissor Lift
Low-level and Mid-level construction noise
Building
Interior Misc. Finishes – North & South
Low-level construction noise
Building
TAB
Scissor Lift
Low-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
N/A - TBD
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #88
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (9/7/2026)
Current Week – September 7, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – East / West Curb/Gutter – 9.11
Concrete trucks
Mid-level construction noise
Building Site
West / South Grading
Heavy Equipment
Low-level and mid-level construction noise
Building Site
Site Hardscape East / West
Low-level and mid-level construction noise
Building Site
Roofing Parapet Caps
Low-level construction noise
Building Site
PV Panels
Scissor Lift
Low-level construction noise
Building Site
Exterior Fascia
Scissor Lift
Low-level and mid-level construction noise
Building
Fabric Wall Panels
Low-level construction noise
Low-level construction noise
Building
Acoya Wood
Scissor Lifts
Low-level construction noise
Building
Wood Ceilings
Scissor Lifts
Low-level construction noise
Building
Interior Finishes – North / South
Scissor Lifts
Low-level construction noise
Building
Trim - All
Low-level construction noise
Building
Energize Lights
Low-level construction noise
Building
2nd Pass Clean Prior to TAB
Scissor Lift
Low-level construction noise
Week of September 14, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – TBD
Concrete trucks
Mid-level construction noise
Building Site
Bio Basin Liner
Low-level and Mid-level construction noise
Building Site
Hardscape East
Low-level and Mid-level construction noise
Building Site
PV Panels
Scissor Lift
Low-level and Mid-level construction noise
Building Site
Fascia
Scissor Lift
Low-level and Mid-level construction noise
Building Site
Exterior Lights / Trim
Scissor Lift
Low-level and Mid-level construction noise
Building
Acoya Wood
Low-level construction noise
Building
Fabric Wall Panels
Low-level construction noise
Building
Interior Finishes – North & South – Trim & Specialties
Low-level construction noise
Building
TAB
Scissor Lift
Low-level construction noise
Week of September 21, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – TBD
Concrete Trucks
Mid-level construction noise
Building Site
Bio Basin Liner
Low-level and Mid-level construction noise
Building Site
PV Electrical
Low-level and Mid-level construction noise
Building Site
Hardscape West
Low-level and Mid-level construction noise
Building Site
Fascia
Scissor Lift
Low-level and Mid-level construction noise
Building Site
Exterior Lights / Trim
Scissor Lift
Low-level and Mid-level construction noise
Building
Interior Misc. Finishes – North & South
Low-level construction noise
Building
TAB
Low-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
N/A - TBD
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #87
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (8/31/2026)
Current Week – August 31, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – East Curb/Gutter – 9.1 & 9.3
Concrete trucks
Mid-level construction noise
Building Site
Low Bay PVC Roofing
Low-level and mid-level construction noise
Building Site
West Grading
Heavy Equipment
Low-level and mid-level construction noise
Building Site
Prep Parking Entrance for Opening
Low-level construction noise
Building Site
Site Hardscape East
Low-level and mid-level construction noise
Building Site
Paint PV Trim
Scissor Lift
Low-level construction noise
Building Site
PV Panels
Scissor Lift
Low-level construction noise
Building Site
Exterior Fascia
Scissor Lift
Low-level and mid-level construction noise
Building
Building Specialties
Low-level construction noise
Building
Fabric Wall Panels
Low-level construction noise
Low-level construction noise
Building
Acoya Wood
Scissor Lifts
Low-level construction noise
Building
Lobby Wood Ceilings
Scissor Lifts
Low-level construction noise
Building
Interior Finishes – North / South
Scissor Lifts
Low-level construction noise
Building
Trim - All
Low-level construction noise
Building
Energize Lights
Low-level construction noise
Building
2nd Pass Clean Prior to TAB
Scissor Lift
Low-level construction noise
Week of September 7, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – TBD
Concrete trucks
Mid-level construction noise
Building Site
Parking Lot Entrance - OPEN
Building Site
West / South Grading
Heavy Equipment
Low-level and Mid-level construction noise
Building Site
Hardscape East
Low-level and Mid-level construction noise
Building Site
PV Panels
Scissor Lift
Low-level and Mid-level construction noise
Building Site
Fascia
Scissor Lift
Low-level and Mid-level construction noise
Building
Lobby Wood Ceilings
Scissor Lifts
Low-level construction noise
Building
Acoya Wood
Low-level construction noise
Building
Fabric Wall Panels
Low-level construction noise
Building
Interior Finishes – North & South – Trim & Specialties
Low-level construction noise
Building
2nd Pass Clean Prior to TAB
Scissor Lift
Low-level construction noise
Week of September 14, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – Non-Scheduled
Concrete Trucks
Mid-level construction noise
Building Site
Bio Basin Liner
Low-level and Mid-level construction noise
Building Site
PV Electrical
Low-level and Mid-level construction noise
Building Site
Hardscape West
Low-level and Mid-level construction noise
Building Site
Fascia
Scissor Lift
Low-level and Mid-level construction noise
Building Site
Exterior Lights / Trim
Scissor Lift
Low-level and Mid-level construction noise
Building
Interior Misc. Finishes – North & South
Low-level construction noise
Building
TAB
Low-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 50 & 51 – Entrance Closer
North Entrance at University Ave.
6/17 – 9/4
Lot 50 & 51 Entrance will be located on Everton Pl.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #86
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (8/24/2026)
Current Week – August 24, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (7AM Start) – Service Yard Retaining Wall – 8.25
Concrete trucks
Mid-level construction noise
Building Site
Low Bay PVC Roofing
Low-level and mid-level construction noise
Building Site
East Grading
Heavy Equipment
Low-level and mid-level construction noise
Building Site
North Base & Paving
Heavy Equipment
Low-level and mid-level construction noise
Building
Site Hardscape East
Building
Building Specialties
Low-level construction noise
Building
Casework
Low-level construction noise
Building
Interior Doors
Low-level construction noise
Building
Interior Glazing
Low-level construction noise
Building
Lobby Acoya Wood
Scissor Lifts
Low-level construction noise
Building
Lobby Wood Ceilings
Scissor Lifts
Low-level construction noise
Building
Interior Finishes – North / South
Scissor Lifts
Low-level construction noise
Building Site
PV Panels
Scissor Lifts
Low-level and mid-level construction noise
Building Site
Exterior – Metal Panels & Fascia
Boom Lift
Low-level and mid-level construction noise
Week of August 31, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – TBD
Concrete trucks
Mid-level construction noise
Building Site
Low Bay PVC Roofing
Low-level and Mid-level construction noise
Building Site
PV Panels
Boom Lift
Low-level construction noise
Building Site
Grading East
Heavy Equipment
Low-level and Mid-level construction noise
Building
Lobby Wood Ceilings
Scissor Lifts
Low-level construction noise
Building
Restroom Finishes
Low-level construction noise
Building
Interior Finishes – North & South – Trim & Specialties
Low-level construction noise
Building
Casework
Low-level construction noise
Building
Interior Glazing
Low-level construction noise
Building Site
Exterior – Fascia
Boom Lift
Low-level and mid-level construction noise
Building Site
Service Yard Retaining Walls Strip
Forklift
Low-level and Mid-level construction noise
Building Site
OPEN Parking Entrance 9.4
Low-level and Mid-level construction noise
Building Site
Site Concrete – North / East
Backhoe
Low-level and Mid-level construction noise
Week of September 7, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Grading West
Skip Loader
Low-level and Mid-level construction noise
Building Site
Site Hardscapes - West
Building Site
Concrete Placement (5AM Start) – Non-Scheduled
Concrete Trucks
Mid-level construction noise
Building
Low Bay PVC Roofing
Low-level and Mid-level construction noise
Building
Lobby Wood Ceilings
Scissor Lift
Low-level construction noise
Building
Interior Finishes – North & South
Low-level construction noise
Building
Interior Finishes – Trim, Specialties
Low-level construction noise
Building
Casework
Low-level construction noise
Building
Interior Glazing
Low-level construction noise
Building Site
Exterior – Fascia
Boom Lifts
Low-level and Mid-level construction noise
Building
PREP for TAB
Low-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 50 & 51 – Entrance Closer
North Entrance at University Ave.
6/17 – 9/4
Lot 50 & 51 Entrance will be located on Everton Pl.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #85
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (8/17/2026)
Current Week – August 17, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (7AM Start) – North Curb & Gutter 8/19
Concrete trucks
Mid-level construction noise
Building Site
Low Bay PVC Roofing
Low-level and mid-level construction noise
Building Site
North / East Grading
Heavy Equipment
Low-level and mid-level construction noise
Building
Site Hardscape
Building
Building Fixtures
Low-level construction noise
Building
Casework
Low-level construction noise
Building
Interior Doors
Low-level construction noise
Building
Interior Glazing
Low-level construction noise
Building
Lobby Acoya Wood
Scissor Lifts
Low-level construction noise
Building
Grid Devices
Scissor Lifts
Low-level construction noise
Building
Interior Finishes – North / South
Scissor Lifts
Low-level construction noise
Building
Roof Start Up – Chiller
Acclimation
Low-level construction noise
Building
AHU #3 Start Up – 8.17
Low-level construction noise
Building Site
Exterior – Metal Panels & Fascia
Boom Lift
Low-level and mid-level construction noise
Building Site
Site Utilities – Lot 50 Parking
Manholes
Low-level and Mid-level construction noise
Week of August 24, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – TBD
Concrete trucks
Mid-level construction noise
Building Site
Low Bay PVC Roofing
Low-level and Mid-level construction noise
Building Site
PV Panels
Boom Lift
Low-level construction noise
Building Site
Grading North / West
Heavy Equipment
Low-level and Mid-level construction noise
Building
Lobby Wood Ceilings
Scissor Lifts
Low-level construction noise
Building
Restroom Finishes
Low-level construction noise
Building
Interior Finishes – North & South – Trim & Specialties
Low-level construction noise
Building
Casework
Low-level construction noise
Building
Interior Glazing
Low-level construction noise
Building
Roof Start Up – Acclimation
Low-level construction noise
Building Site
Exterior – Fascia
Boom Lift
Low-level and mid-level construction noise
Building Site
Service Yard Retaining Walls
Forklift
Low-level and Mid-level construction noise
Building Site
North Base & Paving
Skip Loader / Paving Machine
Low-level and Mid-level construction noise
Building Site
Site Concrete – North / East
Backhoe
Low-level and Mid-level construction noise
Week of August 31, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Grading West
Skip Loader
Low-level and Mid-level construction noise
Building Site
Site Hardscapes - East
Building Site
Concrete Placement (5AM Start) – Non-Scheduled
Concrete Trucks
Mid-level construction noise
Building
Low Bay PVC Roofing
Low-level and Mid-level construction noise
Building
Lobby Wood Ceilings
Scissor Lift
Low-level construction noise
Building
Interior Finishes – North & South
Low-level construction noise
Building
Interior Finishes – Trim, Specialties
Low-level construction noise
Building
Casework
Low-level construction noise
Building
Interior Glazing
Low-level construction noise
Building Site
Exterior – Fascia
Boom Lifts
Low-level and Mid-level construction noise
Building Site
North Parking Lot Entrance – Prep for Opening
Low-level construction noise
Building Site
Service Yard – Retaining Wall
Low-level and Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 50 & 51 – Entrance Closer
North Entrance at University Ave.
6/17 – 9/4
Lot 50 & 51 Entrance will be located on Everton Pl.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #84
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (8/10/2026)
Current Week – August 10, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (7AM Start) – N/A
Concrete trucks
Mid-level construction noise
Building Site
Low Bay PVC Roofing
Low-level and mid-level construction noise
Building Site
North / East Grading
Heavy Equipment
Low-level and mid-level construction noise
Building
Restroom Fixtures
Low-level construction noise
Building
Interior Door Frames
Low-level construction noise
Building
Lobby Acoya Wood
Scissor Lifts
Low-level construction noise
Building
Grid Devices
Scissor Lifts
Low-level construction noise
Building
Interior Finishes – North / South
Scissor Lifts
Low-level construction noise
Building
Roof Start Up – Chiller
Acclimation
Low-level construction noise
Building Site
Exterior – South
Metal Panels
Boom Lift
Low-level and mid-level construction noise
Building Site
Site Utilities – Lot 50 Parking
Manholes
Backhoe
Low-level and Mid-level construction noise
Week of August 17, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – TBD
Concrete trucks
Mid-level construction noise
Building Site
Low Bay PVC Roofing
Low-level and Mid-level construction noise
Building Site
PV Panels
Boom Lift
Low-level construction noise
Building Site
Grading North / East
Heavy Equipment
Low-level and Mid-level construction noise
Building
Lobby Wood Ceilings
Scissor Lifts
Low-level construction noise
Building
Restroom Finishes
Low-level construction noise
Building
Interior Finishes – North & South
Low-level construction noise
Building
Casework
Low-level construction noise
Building
Interior Glazing
Low-level construction noise
Building
Roof Start Up – Acclimation
Low-level construction noise
Building Site
Exterior – Fascia
Boom Lift
Low-level and mid-level construction noise
Building Site
Service Yard Retaining Walls
Forklift
Low-level and Mid-level construction noise
Building Site
Site Concrete – North / East
Backhoe
Low-level and Mid-level construction noise
Week of August 24, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Site Hardscapes
Backhoe
Low-level and Mid-level construction noise
Building Site
Concrete Placement (5AM Start) – Non-Scheduled
Concrete Trucks
Mid-level construction noise
Building Site
PV Panels
Boom Lift
Low-level and Mid-level construction noise
Building
Low Bay PVC Roofing
Low-level and Mid-level construction noise
Building
Lobby Wood Ceilings
Scissor Lift
Low-level construction noise
Building
Interior Finishes – North & South
Low-level construction noise
Building
Interior Finishes - Trim
Low-level construction noise
Building
Casework
Low-level construction noise
Building
Interior Glazing
Low-level construction noise
Building Site
Exterior – Fascia
Boom Lifts
Low-level and Mid-level construction noise
Building Site
Service Yard Retaining Wall
Forklift
Low-level construction noise
Building Site
North / East Hardscape
Backhoe
Low-level and Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 50 & 51 – Entrance Closer
North Entrance at University Ave.
6/17 – 9/4
Lot 50 & 51 Entrance will be located on Everton Pl.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
50604 UCR SoCal OASIS™ Park – Construction Progress Update #83
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (8/3/2026)
Current Week – August 3, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (7AM Start) – N/A
Concrete trucks
Mid-level construction noise
Building Site
Low Bay PVC Roofing
Low-level and mid-level construction noise
Building Site
North / East Grading
Heavy Equipment
Low-level and mid-level construction noise
Building
Restroom Fixtures
Low-level construction noise
Building
Interior Door Frames
Low-level construction noise
Building
Lobby Acoya Wood
Scissor Lifts
Low-level construction noise
Building
Grid Devices
Scissor Lifts
Low-level construction noise
Building
Interior Finishes – North / South
Scissor Lifts
Low-level construction noise
Building
Roof Start Up – Chiller
Acclimation
Low-level construction noise
Building Site
Exterior – South
Metal Panels
Boom Lift
Low-level and mid-level construction noise
Building Site
Roof Plaster
Forklift
Low-level and mid-level construction noise
Building Site
Site Utilities – Lot 50 Parking
Re-route & Storm Drain
Backhoe
Low-level and Mid-level construction noise
Week of August 10, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – TBD
Concrete trucks
Mid-level construction noise
Building Site
Low Bay PVC Roofing
Low-level and Mid-level construction noise
Building Site
PV Panels
Boom Lift
Low-level construction noise
Building Site
Grading North / East
Heavy Equipment
Low-level and Mid-level construction noise
Building
Lobby Wood Ceilings
Scissor Lifts
Low-level construction noise
Building
Restroom Finishes
Low-level construction noise
Building
Interior Finishes – North & South
Low-level construction noise
Building
Casework
Low-level construction noise
Building
Interior Glazing
Low-level construction noise
Building
Roof Start Up – Acclimation
Low-level construction noise
Building Site
Exterior – Fascia
Boom Lift
Low-level and mid-level construction noise
Building Site
Service Yard Retaining Walls
Forklift
Low-level and Mid-level construction noise
Building Site
Site Concrete – North / East
Backhoe
Low-level and Mid-level construction noise
Week of August 17, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Site Hardscapes
Backhoe
Low-level and Mid-level construction noise
Building Site
Concrete Placement (5AM Start) – Non-Scheduled
Concrete Trucks
Mid-level construction noise
Building Site
PV Panels
Boom Lift
Low-level and Mid-level construction noise
Building
Low Bay PVC Roofing
Low-level and Mid-level construction noise
Building
Lobby Wood Ceilings
Scissor Lift
Low-level construction noise
Building
Interior Finishes – North & South
Low-level construction noise
Building
Interior Finishes - Trim
Low-level construction noise
Building
Casework
Low-level construction noise
Building
Interior Glazing
Low-level construction noise
Building Site
Exterior – Fascia
Boom Lifts
Low-level and Mid-level construction noise
Building Site
Service Yard Retaining Wall
Forklift
Low-level construction noise
Building Site
North / East Hardscape
Backhoe
Low-level and Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 50 & 51 – Entrance Closer
North Entrance at University Ave.
6/17 – 9/4
Lot 50 & 51 Entrance will be located on Everton Pl.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #82
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (7/27/2026)
Current Week – July 27, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (7AM Start) – N/A
Concrete trucks
Mid-level construction noise
Building Site
Low Bay PVC Roofing
Low-level and mid-level construction noise
Building Site
North / East Grading
Heavy Equipment
Low-level and mid-level construction noise
Building
Restroom Tile
Low-level construction noise
Building
Interior Door Frames
Low-level construction noise
Building
Lobby Acoya Wood
Scissor Lifts
Low-level construction noise
Building
Grid Devices
Scissor Lifts
Low-level construction noise
Building
Interior Finishes – North / South
Scissor Lifts
Low-level construction noise
Building
Initial Cleaning
Scissor Lifts
Low-level construction noise
Building
Roof Start Up – AHU’s
Low-level construction noise
Building Site
Exterior – South
Metal Panels
Boom Lift
Low-level and mid-level construction noise
Building Site
Roof Plaster
Forklift
Low-level and mid-level construction noise
Building Site
Site Utilities – Lot 50 Parking
Re-route & Storm Drain
Backhoe
Low-level and Mid-level construction noise
Week of August 3, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – TBD
Concrete trucks
Mid-level construction noise
Building Site
Low Bay PVC Roofing
Low-level and Mid-level construction noise
Building Site
PV Panels
Boom Lift
Low-level construction noise
Building Site
Grading North / East
Heavy Equipment
Low-level and Mid-level construction noise
Building
Restroom Finishes
Low-level construction noise
Building
Interior Finishes – North & South
Low-level construction noise
Building
Interior Glazing
Low-level construction noise
Building
Roof Plaster
Low-level construction noise
Building
Roof Start Up - Chillers
Low-level construction noise
Building Site
Exterior – Fascia
Boom Lift
Low-level and mid-level construction noise
Building Site
Service Yard Retaining Walls
Forklift
Low-level and Mid-level construction noise
Building Site
Site Utilities – North Storm Drain
Backhoe
Low-level and Mid-level construction noise
Week of August 10, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – Non-Scheduled
Concrete Trucks
Mid-level construction noise
Building
Low Bay PVC Roofing
Low-level and Mid-level construction noise
Building
Restroom Finishes
Low-level construction noise
Building
Interior Finishes – North & South
Low-level construction noise
Building
Interior Finishes - Trim
Low-level construction noise
Building
Interior Wood Acclimation
Low-level construction noise
Building Site
PV Panel Install
Boom Lift
Low-level and Mid-level construction noise
Building Site
Exterior – Fascia
Boom Lifts
Low-level and Mid-level construction noise
Building Site
Service Yard Retaining Wall
Forklift
Low-level construction noise
Building Site
North / East Hardscape
Backhoe
Low-level and Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 50 & 51 – Entrance Closer
North Entrance at University Ave.
6/17 – 2 Months
Lot 50 & 51 Entrance will be located on Everton Pl.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #81
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (7/20/2026)
Current Week – July 20, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (7AM Start) – N/A
Concrete trucks
Mid-level construction noise
Building Site
RPU – Irrigation Stub Out - TBD
Low-level and mid-level construction noise
Building Site
Paint Testing for PV Structure
Scissor Lifts
Low-level and mid-level construction noise
Building Site
PV Purlins
Boom Lift
Low-level and mid-level construction noise
Building Site
North / East Grading
Heavy Equipment
Low-level and mid-level construction noise
Building
Restroom Tile
Low-level construction noise
Building
Interior Door Frames
Low-level construction noise
Building
Lobby Acoya Wood
Scissor Lifts
Low-level construction noise
Building
Grid Devices
Scissor Lifts
Low-level construction noise
Building
Interior Finishes – North / South
Scissor Lifts
Low-level construction noise
Building
Roof – Pump Start Up / Flush
Low-level construction noise
Building Site
Exterior – South
Metal Panels
Boom Lift
Low-level and mid-level construction noise
Building Site
Roof Plaster
Forklift
Low-level and mid-level construction noise
Building Site
Site Utilities – Lot 50 Parking
Re-route & Storm Drain
Backhoe
Low-level and Mid-level construction noise
Week of July 27, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – TBD
Concrete trucks
Mid-level construction noise
Building Site
PV Purlins / Panels
Boom Lift
Low-level construction noise
Building Site
Grading North / East
Heavy Equipment
Low-level and Mid-level construction noise
Building
Restroom Tile
Low-level construction noise
Building
Interior Finishes – North & South
Low-level construction noise
Building
Ceilings – North & South
ACT Devices
Scissor Lifts
Low-level construction noise
Building
Roof Plaster
Low-level construction noise
Building
Roof Mech Pipe Insulation
Low-level construction noise
Building
Roof Start Up AHU’s
Low-level construction noise
Building Site
Exterior – South
Metal Panels Roof Screen
Boom Lift
Low-level and mid-level construction noise
Building Site
Service Yard Retaining Walls
Forklift
Low-level and Mid-level construction noise
Building Site
Site Utilities – North Storm Drain
Backhoe
Low-level and Mid-level construction noise
Week of August 3, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – Non-Scheduled
Concrete Trucks
Mid-level construction noise
Building
Roof Plaster
Low-level and Mid-level construction noise
Building
Chiller Start Up
Low-level construction noise
Building
Restroom Specialties
Low-level construction noise
Building
Interior Finishes – North & South
Low-level construction noise
Building
Interior Finishes - Trim
Low-level construction noise
Building
Interior Wood Acclimation
Low-level construction noise
Building Site
PV Panel Install
Boom Lift
Low-level and Mid-level construction noise
Building Site
Exterior – South
Metal Panels / Fascia
Boom Lifts
Low-level and Mid-level construction noise
Building Site
Service Yard Retaining Wall
Forklift
Low-level construction noise
Building Site
North / East Hardscape
Backhoe
Low-level and Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 50 & 51 – Entrance Closer
North Entrance at University Ave.
6/17 – 2 Months
Lot 50 & 51 Entrance will be located on Everton Pl.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #80
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (7/13/2026)
Current Week – July 13, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (7AM Start) – N/A
Concrete trucks
Mid-level construction noise
Building Site
RPU – Irrigation Stub Out - TBD
Low-level and mid-level construction noise
Building Site
Paint Testing for PV Structure
Scissor Lifts
Low-level and mid-level construction noise
Building Site
Glazing Window Testing
Scissor Lifts
Low-level and mid-level construction noise
Building Site
North / East Grading
Heavy Equipment
Low-level and mid-level construction noise
Building
Restroom Waterproofing Testing / Tile
Low-level construction noise
Building
Exterior Glazing Doors
Scissor Lifts
Low-level construction noise
Building
Lobby Acoya Wood
Scissor Lifts
Low-level construction noise
Building
Grid Devices
Scissor Lifts
Low-level construction noise
Building
Interior Finishes – North / South
Scissor Lifts
Low-level construction noise
Building
Roof – Equipment Electrical Tie-Ins
Low-level construction noise
Building Site
Exterior – South
Metal Panels
Boom Lift
Low-level and mid-level construction noise
Building Site
Roof Plaster
Forklift
Low-level and mid-level construction noise
Building Site
Site Utilities – Lot 50 Parking
Re-route & Storm Drain - TBD
Backhoe
Low-level and Mid-level construction noise
Week of July 20, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – TBD
Concrete trucks
Mid-level construction noise
Building Site
PV Substructure
Boom Lift
Low-level construction noise
Building Site
Grading North / East
Heavy Equipment
Low-level and Mid-level construction noise
Building
Restroom Tile
Low-level construction noise
Building
Interior Finishes – North & South
Low-level construction noise
Building
Ceilings – North & South
ACT Devices
Scissor Lifts
Low-level construction noise
Building
Roof Plaster
Low-level construction noise
Building
Roof Mech Pipe Insulation
Low-level construction noise
Building
Roof Start Up / Flush Pumps
Low-level construction noise
Building Site
PV – Sub-Structure/ Panel Install
Boom Lift
Low-level and Mid-level construction noise
Building Site
Exterior – South
Metal Panels Roof Screen
Boom Lift
Low-level and mid-level construction noise
Building Site
Service Yard Retaining Walls
Forklift
Low-level and Mid-level construction noise
Building Site
Site Utilities – North Storm Drain
Backhoe
Low-level and Mid-level construction noise
Week of July 27, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – Non-Scheduled
Concrete Trucks
Mid-level construction noise
Building
Roof Plaster
Low-level and Mid-level construction noise
Building
AHU Start Up
Low-level construction noise
Building
Restroom Specialties
Low-level construction noise
Building
Interior Finishes – North & South
Low-level construction noise
Building
Interior Finishes - Trim
Low-level construction noise
Building Site
PV Panel Install
Boom Lift
Low-level and Mid-level construction noise
Building Site
Exterior – South
Metal Panels / Fascia
Boom Lifts
Low-level and Mid-level construction noise
Building Site
Service Yard Retaining Wall
Forklift
Low-level construction noise
Building Site
Site Work – North Entrance
Forklift
Low-level and Mid-level construction noise
Building Site
Site Utilities – North Storm Drain
Backhoe
Low-level and Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 50 & 51 – Entrance Closer
North Entrance at University Ave.
6/17 – 2 Months
Lot 50 & 51 Entrance will be located on Everton Pl.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #79
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (7/6/2026)
Current Week – July 6, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (7AM Start) – N/A
Concrete trucks
Mid-level construction noise
Building Site
RPU – Irrigation Stub Out - TBD
Low-level and mid-level construction noise
Building Site
PV Steel Erection / Paint & PV Substructure
Scissor Lifts
Low-level and mid-level construction noise
Building Site
North Site –
Domestic Water Backflow Re-Flush & Re-Chlorination Test
Backhoe
Low-level and mid-level construction noise
Building Site
North / East Grading
Heavy Equipment
Low-level and mid-level construction noise
Building
Restroom Waterproofing
Low-level construction noise
Building
Concrete Polishing Lobby
Grinding Equipment
Low-level construction noise
Building
Lobby Acoya Wood
Scissor Lifts
Low-level construction noise
Building
Grid Devices
Scissor Lifts
Low-level construction noise
Building
Interior Finishes – North / South
Scissor Lifts
Low-level construction noise
Building
Roof – Equipment Electrical Tie-Ins
Low-level construction noise
Building Site
Exterior – South
Metal Panels
Boom Lift
Low-level and mid-level construction noise
Building Site
Exterior Garage Doors
Forklift
Low-level and mid-level construction noise
Building Site
Site Utilities – Lot 50 Parking
Re-route & Storm Drain
Backhoe
Low-level and Mid-level construction noise
Week of July 13, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – TBD
Concrete trucks
Mid-level construction noise
Building Site
Window Water Testing
Low-level construction noise
Building
Restroom WP / Tile
Low-level construction noise
Building
Interior Finishes - Concrete Polishing
Grinding / Polishing Equipment
Low-level construction noise
Building
Interior Finishes – North
ACT Devices
Scissor Lifts
Low-level construction noise
Building
Restroom Tile
Low-level construction noise
Building
Roof Plaster
Low-level construction noise
Building Site
Grading Site North / East
Heavy Equipment
Low-level and Mid-level construction noise
Building Site
PV – Sub-Structure/ Panel Install
Boom Lift
Low-level and Mid-level construction noise
Building Site
Exterior – South
Metal Panels Roof Screen
Boom Lift
Low-level and mid-level construction noise
Building Site
Service Yard Retaining Walls
Forklift
Low-level and Mid-level construction noise
Building Site
Site Utilities – North Storm Drain
Backhoe
Low-level and Mid-level construction noise
Week of July 20, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – Non-Scheduled
Concrete Trucks
Mid-level construction noise
Building
Pumps Start Up / Flush
Low-level construction noise
Building
Restroom Specialties
Low-level construction noise
Building
Interior Buildout – Grid - MEP Devices
Scissor Lifts
Low-level construction noise
Building
Roof Plaster
Low-level construction noise
Building Site
PV Panel Install
Boom Lift
Low-level and Mid-level construction noise
Building Site
Exterior – South
Metal Panels
Boom Lifts
Low-level and Mid-level construction noise
Building Site
Service Yard Retaining Wall
Forklift
Low-level construction noise
Building Site
Site Utilities – North Storm Drain
Backhoe
Low-level and Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 50 & 51 – Entrance Closer
North Entrance at University Ave.
6/17 – 2 Months
Lot 50 & 51 Entrance will be located on Everton Pl.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #78
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (6/29/2026)
Current Week – June 29, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (7AM Start) – 6.29 Retaining Wall Foundation
Concrete trucks
Mid-level construction noise
Building Site
RPU – Meter Set
Low-level construction noise
Building Site
PV Steel Erection / Paint
Scissor Lifts
Low-level and mid-level construction noise
Building Site
North Site –
Domestic Water Backflow Re-Flush & Re-Chlorination Test
Backhoe
Low-level and mid-level construction noise
Building
Concrete Polishing Lobby
Grinding Equipment
Low-level construction noise
Building
Lobby Acoya Wood
Scissor Lifts
Low-level construction noise
Building
Grid Devices
Scissor Lifts
Low-level construction noise
Building
Interior Finishes – South
Paint
Scissor Lifts
Low-level construction noise
Building Site
Exterior – South
Metal Panels
Boom Lift
Low-level and mid-level construction noise
Building Site
Exterior Garage Doors
Forklift
Low-level and mid-level construction noise
Building Site
Site Utilities – Lot 50 Parking
Re-route & Storm Drain
Backhoe
Low-level and Mid-level construction noise
Week of July 6, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – TBD
Concrete trucks
Mid-level construction noise
Building
Concrete Polishing
Grinding / Polishing Equipment
Low-level construction noise
Building
Restroom WP / Tile
Low-level construction noise
Building
Interior Finishes - Concrete Polishing
Grinding / Polishing Equipment
Low-level construction noise
Building
Interior Finishes – North
ACT Devices
Scissor Lifts
Low-level construction noise
Building
Restroom Waterproofing / Tile
Low-level construction noise
Building
Roof Plaster
Low-level construction noise
Building Site
Grading Site North / East
Heavy Equipment
Low-level and Mid-level construction noise
Building Site
PV – Sub-Structure/ Panel Install
Boom Lift
Low-level and Mid-level construction noise
Building Site
Exterior – South
Metal Panels Roof Screen
Boom Lift
Low-level and mid-level construction noise
Building Site
Electrical – RPU Perm Power
Low-level construction noise
Building Site
Service Yard Retaining Walls
Forklift
Low-level and Mid-level construction noise
Building Site
Site Utilities – North Storm Drain
Backhoe
Low-level and Mid-level construction noise
Week of July 13, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – Non-Scheduled
Concrete Trucks
Mid-level construction noise
Building
Restroom WP / Tile
Low-level construction noise
Building
Interior Buildout – Grid - MEP Devices
Scissor Lifts
Low-level construction noise
Building
Restroom Tile
Low-level construction noise
Building
Roof Plaster
Low-level construction noise
Building Site
PV Panel Install
Boom Lift
Low-level and Mid-level construction noise
Building Site
Exterior – Window Testing
Boom Lifts
Low-level and Mid-level construction noise
Building Site
Exterior – South
Metal Panels
Boom Lifts
Low-level and Mid-level construction noise
Building Site
Electrical – Power to Pumps
Low-level and Mid-level construction noise
Building Site
Service Yard Retaining Wall
Forklift
Low-level construction noise
Building Site
Site Utilities – North Storm Drain
Backhoe
Low-level and Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 50 & 51 – Entrance Closer
North Entrance at University Ave.
6/17 – 2 Months
Lot 50 & 51 Entrance will be located on Everton Pl.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #77
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (6/22/2026)
Current Week – June 22, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (7AM Start) – TBD
Concrete trucks
Mid-level construction noise
Building Site
RPU – Set Transformer / Pull Cable
Forklift
Low-level and mid-level construction noise
Building Site
PV Steel Erection
Forklift
Low-level and mid-level construction noise
Building
Concrete Polishing
Grinding Equipment
Low-level construction noise
Building
Interior Finishes – North
Lights
Scissor Lifts
Low-level construction noise
Building
ACT Grid
Scissor Lifts
Low-level construction noise
Building
Interior Finishes – South
Paint
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North
Wood Panels / Metal Panels / Glazing
Boom Lift
Low-level and mid-level construction noise
Building Site
Exterior – South
Metal Panels Framing - Roof Screen
Boom Lift
Low-level and mid-level construction noise
Building Site
Exterior Garage Doors
Forklift
Low-level and mid-level construction noise
Building Site
Roofing – Curb Terminations
Forklift
Low-level and mid-level construction noise
Building Site
MEP Roof Connections
Forklift
Low-level and mid-level construction noise
Building Site
North Site –
Domestic Water Backflow Re-Flush & Re-Chlorination Test
Backhoe
Low-level and mid-level construction noise
Building Site
Service Yard
Retaining Wall Reinforcement
Forklift
Low-level and mid-level construction noise
Building Site
Site Utilities – Lot 50 Parking
Re-route & Storm Drain
Backhoe
Low-level and Mid-level construction noise
Week of June 29, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – TBD
Concrete trucks
Mid-level construction noise
Building
Concrete Polishing
Grinding / Polishing Equipment
Low-level construction noise
Building
Lights
Scissor Lifts
Low-level construction noise
Building
Interior Finishes - Concrete Polishing
Grinding / Polishing Equipment
Low-level construction noise
Building
Interior Finishes – North
ACT Device Tiles
Scissor Lifts
Low-level construction noise
Building
Interior Finishes – South
ACT Grid
Scissor Lifts
Low-level construction noise
Building
Restroom Waterproofing / Tile
Low-level construction noise
Building Site
PV – Sub-Structure Install
Boom Lift
Low-level and Mid-level construction noise
Building Site
Exterior – North
Metal Panels / Glazing
Boom Lift
Low-level and Mid-level construction noise
Building Site
Exterior – South
Metal Panels Roof Screen
Boom Lift
Low-level and mid-level construction noise
Building Site
Roof Equipment MEP
Forklift
Low-level and Mid-level construction noise
Building Site
Electrical – RPU Perm Power
Low-level construction noise
Building Site
Service Yard Retaining Walls
Forklift
Low-level and Mid-level construction noise
Building Site
Site Utilities – North Storm Drain
Backhoe
Low-level and Mid-level construction noise
Week of July 6, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – Non-Scheduled
Concrete Trucks
Mid-level construction noise
Building
Interior Finishes North – Grid, MEP Devices, Bathroom Tile
Polishing Equipment
Low-level construction noise
Building
Interior Buildout South – Grid, MEP Devices
Scissor Lifts
Low-level construction noise
Building
Restroom Tile
Low-level construction noise
Building Site
PV Panel Install
Boom Lift
Low-level and Mid-level construction noise
Building Site
Exterior – North
Metal Panel System, Glazing
Boom Lifts
Low-level and Mid-level construction noise
Building Site
Exterior – South
Metal Panels, Glazing
Boom Lifts
Low-level and Mid-level construction noise
Building Site
Roof Plaster
Low-level and Mid-level construction noise
Building Site
Electrical – Power
Forklift
Low-level and Mid-level construction noise
Building Site
Service Yard Retaining Wall
Forklift
Low-level construction noise
Building Site
Site Utilities – North Storm Drain
Backhoe
Low-level and Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 50 & 51 – Entrance Closer
North Entrance at University Ave.
6/17 – 2 Months
Lot 50 & 51 Entrance will be located on Everton Pl.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #76
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (6/15/2026)
Current Week – June 15, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (7AM Start) – Retaining Wall Foundation
Concrete trucks
Mid-level construction noise
Building Site
Exterior Painting – PV Structure
Forklift
Low-level construction noise
Building Site
PV Steel Erection
Forklift
Low-level and mid-level construction noise
Building
Concrete Polishing
Grinding Equipment
Low-level construction noise
Building
Interior Finishes – North
Lights
Scissor Lifts
Low-level construction noise
Building
ACT Grid
Scissor Lifts
Low-level construction noise
Building
Interior Finishes – South
Paint
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North
Wood Panels / Metal Panels / Glazing
Boom Lift
Low-level and mid-level construction noise
Building Site
Exterior – South
Metal Panels Framing - Roof Screen
Boom Lift
Low-level and mid-level construction noise
Building Site
Exterior Garage Doors
Forklift
Low-level and mid-level construction noise
Building Site
Roofing – Curb Terminations
Forklift
Low-level and mid-level construction noise
Building Site
MEP Roof
Forklift
Low-level and mid-level construction noise
Building Site
North Site –
Domestic Water Backflow Chlorination Testing Results
Backhoe
Low-level and mid-level construction noise
Building Site
RPU Scheduling Power
Forklift
Low-level construction noise
Building Site
SHUT DOWN – Lot 50 Parking
(ENTRANCE CLOSURE) – 6/17
Forklift
Low-level and Mid-level construction noise
Building Site
Site Utilities – Lot 50 Parking
Re-route & Storm Drain
Backhoe
Low-level and Mid-level construction noise
Week of June 22, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building
Concrete Polishing
Grinding / Polishing Equipment
Low-level construction noise
Building
Lights
Scissor Lifts
Low-level construction noise
Building
Interior Finishes - Concrete Polishing
Grinding / Polishing Equipment
Low-level construction noise
Building
Interior Finishes – North
ACT Grid
Scissor Lifts
Low-level construction noise
Building
Interior Finishes – South
ACT Grid
Scissor Lifts
Low-level construction noise
Building Site
PV – Sub-Structure Install
Boom Lift
Low-level and Mid-level construction noise
Building Site
Exterior – North
Metal Panels / Glazing
Boom Lift
Low-level and Mid-level construction noise
Building Site
Exterior – South
Metal Panels Roof Screen
Boom Lift
Low-level and mid-level construction noise
Building Site
Roof Equipment MEP
Forklift
Low-level and Mid-level construction noise
Building Site
Electrical – RPU Perm Power Scheduling
Low-level construction noise
Building Site
Service Yard Retaining Walls
Forklift
Low-level and Mid-level construction noise
Building Site
Site Utilities – Lot 50 Parking
(ENTRANCE CLOSURE) – Demo
Backhoe
Low-level and Mid-level construction noise
Week of June 29, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – Non-Scheduled
Concrete Trucks
Mid-level construction noise
Building
Interior Finishes North – Grid, MEP Devices, Bathroom Tile
Polishing Equipment
Low-level construction noise
Building
Interior Buildout South – Grid, MEP Devices
Scissor Lifts
Low-level construction noise
Building Site
PV Panel Install
Boom Lift
Low-level and Mid-level construction noise
Building Site
Exterior – North
Metal Panel System, Glazing
Boom Lifts
Low-level and Mid-level construction noise
Building Site
Exterior – South
Metal Panels, Glazing
Boom Lifts
Low-level and Mid-level construction noise
Building Site
Roof Plaster
Low-level and Mid-level construction noise
Building Site
Electrical – RPU Wire Pull / Set Transformer
Forklift
Low-level and Mid-level construction noise
Building Site
Service Yard Retaining Wall
Forklift
Low-level construction noise
Building Site
Site Utilities – Lot 50 Parking
(ENTRANCE CLOSURE)
Site Work
Backhoe
Low-level and Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 50 & 51 – Entrance Closer
North Entrance at University Ave.
6/17 – 2 Months
Lot 50 & 51 Entrance will be located on Everton Pl.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #75
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (6/8/2026)
Current Week – June 8, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (7AM Start) – Retaining Wall Foundation
Concrete trucks
Mid-level construction noise
Building Site
Exterior Painting – PV Structure
Low-level construction noise
Building Site
Concrete Floor Prep
Grinding Equipment
Low-level construction noise
Building Site
Interior Rough Buildout – North
Restroom Lights
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout – South
Paint
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North
Wood Panels / Metal Panels / Glazing
Boom Lift
Low-level and mid-level construction noise
Building Site
Exterior – South
Metal Panels Framing - Roof Screen
Boom Lift
Low-level and mid-level construction noise
Building Site
Roofing – Curb Low Bay
Forklift
Low-level and mid-level construction noise
Building Site
MEP Roof
Forklift
Low-level and mid-level construction noise
Building Site
North Site –
Domestic Water Backflow Flush / Chlorination
Backhoe
Low-level and mid-level construction noise
Building Site
Electrical / IDF – Terminate
RPU Inspection
Forklift
Low-level construction noise
Building Site
Site Utilities – Lot 50 Parking
(ENTRANCE CLOSURE) – 6/17
Backhoe
Low-level and Mid-level construction noise
Week of June 15, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Concrete Floor Prep – Clean Up
Grinding / Polishing Equipment
Low-level construction noise
Building Site
PV Structure Erection
Forklift
Low-level and Mid-level construction noise
Building Site
Interior Rough Buildout – North
ACT Grid
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout – South
ACT Grid
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North
Metal Panels / Glazing
Boom Lift
Low-level and Mid-level construction noise
Building Site
Exterior – South
Metal Panels Roof Screen
Boom Lift
Low-level and mid-level construction noise
Building Site
Roof Equipment MEP
Forklift
Low-level and Mid-level construction noise
Building Site
Electrical – RPU Perm Power Scheduling
Low-level construction noise
Building Site
Service Yard Retaining Walls
Forklift
Low-level and Mid-level construction noise
Building Site
Site Utilities – Lot 50 Parking
(ENTRANCE CLOSURE) – 6/17
Backhoe
Low-level and Mid-level construction noise
Week of June 22, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – Non-Scheduled
Concrete Trucks
Mid-level construction noise
Building Site
Interior Finishes North – Grid, MEP Devices, Bathroom Tile
Polishing Equipment
Low-level construction noise
Building Site
Interior Buildout South – Grid, MEP Devices
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North
Metal Panel System, Glazing
Boom Lifts
Low-level and Mid-level construction noise
Building Site
North Site – PV Structure Erect
Crane
Low-level and Mid-level construction noise
Building Site
Exterior – South
Metal Panels
Boom Lifts
Low-level and Mid-level construction noise
Building Site
Roof Equipment MEP
Forklift
Low-level and Mid-level construction noise
Building Site
Electrical / IDF Buildout / Wire Pull
Scissor Lifts
Low-level construction noise
Building Site
Concrete - Sealing
Boom Lift
Low-level construction noise
Building Site
Service Yard Retaining Wall
Forklift
Low-level construction noise
Building Site
Site Utilities – Lot 50 Parking
(ENTRANCE CLOSURE) – 6/17
Re-route Unidentified Line
Backhoe
Low-level and Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 50 & 51 – Entrance Closer
North Entrance at University Ave.
6/17 – 2 Months
Lot 50 & 51 Entrance will be located on Everton Pl.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #74
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (6/1/2026)
Current Week – June 1, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (7AM Start) – Retaining Wall Foundation
Concrete trucks
Mid-level construction noise
Building Site
Exterior Painting – Steel & PV Structure
Low-level construction noise
Building Site
Concrete Floor Prep
Grinding Equipment
Low-level construction noise
Building Site
Interior Rough Buildout – North
Paint / Grid
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout – South
Tape & Finish / Paint
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North
Glazing Mullions / Wood Panels / Metal Panels / Glazing
Boom Lift
Low-level and mid-level construction noise
Building Site
Exterior – South
Metal Panels Roof Screen
Boom Lift
Low-level and mid-level construction noise
Building Site
Roofing – South
High Bay PVC Roofing
Forklift
Low-level and mid-level construction noise
Building Site
MEP Roof
Forklift
Low-level and mid-level construction noise
Building Site
North Site – Fire Backflow Flush
Domestic Water Backflow Install
Backhoe
Low-level and mid-level construction noise
Building Site
Service Yard – Retaining Wall
Low-level and mid-level construction noise
Building Site
Electrical / IDF – Terminate
RPU Inspection
Forklift
Low-level construction noise
Building Site
Site Utilities – Lot 50 Parking
(ENTRANCE CLOSURE) – 6/17
Backhoe
Low-level and Mid-level construction noise
Week of June 8, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Concrete Floor Prep – Clean Up
Grinding / Polishing Equipment
Low-level construction noise
Building Site
Interior Rough Buildout – North
Paint / Grid
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout – South
Paint / Grid
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North
Metal Panels / Glazing
PV Structure Paint
Boom Lift
Low-level and Mid-level construction noise
Building Site
Exterior – South
Metal Panels Roof Screen
Boom Lift
Low-level and mid-level construction noise
Building Site
Roof Equipment MEP
Forklift
Low-level and Mid-level construction noise
Building Site
Electrical – RPU Perm Power Scheduling
Low-level construction noise
Building Site
Service Yard Retaining Walls
Forklift
Low-level and Mid-level construction noise
Building Site
Domestic Water Flush / Chlorinate
Low-level construction noise
Building Site
Site Utilities – Lot 50 Parking
(ENTRANCE CLOSURE) – 6/17
Backhoe
Low-level and Mid-level construction noise
Week of June 15, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – Non-Scheduled
Concrete Trucks
Mid-level construction noise
Building Site
Interior Finishes North – Concrete Polish
Polishing Equipment
Low-level construction noise
Building Site
Interior Buildout South – Grid, MEP Drops
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North
Metal Panel System, Glazing
Boom Lifts
Low-level and Mid-level construction noise
Building Site
North Site – PV Structure Erect
Crane
Low-level and Mid-level construction noise
Building Site
Exterior – South
Metal Panels
Boom Lifts
Low-level and Mid-level construction noise
Building Site
Roof Equipment MEP
Forklift
Low-level and Mid-level construction noise
Building Site
Electrical / IDF Buildout / Wire Pull
Scissor Lifts
Low-level construction noise
Building Site
Concrete - Sealing
Boom Lift
Low-level construction noise
Building Site
Service Yard Retaining Wall
Forklift
Low-level construction noise
Building Site
Site Utilities – Lot 50 Parking
(ENTRANCE CLOSURE) – 6/17
Re-route Unidentified Line
Backhoe
Low-level and Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 50 & 51 – Entrance Closer
North Entrance at University Ave.
6/17 – 2 Months
Lot 50 & 51 Entrance will be located on Everton Pl.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #73
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (5/26/2026)
Current Week – May 26, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (7AM Start) – Service Yard Trash Pad – 5/29
Concrete trucks
Mid-level construction noise
Building Site
Grading – Service Yard & Backfill PV Foundations
Backhoe
Mid-level construction noise
Building Site
Concrete Walls – Clean Up
Boom Lift
Low-level construction noise
Building Site
Interior Rough Buildout – North
Tape & Finish / Paint / Grid
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout – South
Drywall / Tape & Finish / Paint
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North / South
Flashing / Z-Girts / Glazing Mullions / Metal Panels & Wood
Boom Lift
Low-level and mid-level construction noise
Building Site
Roofing – South
High Bay PVC Roofing
Forklift
Low-level and mid-level construction noise
Building Site
MEP Roof
Forklift
Low-level and mid-level construction noise
Building Site
North Site – Fire Backflow
Backhoe
Low-level and mid-level construction noise
Building Site
Electrical / IDF – Buildout
Low-level construction noise
Building Site
Site Utilities – Lot 50 Parking
(ENTRANCE CLOSURE) – 6/17
Backhoe
Low-level and Mid-level construction noise
Week of June 1, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Concrete Walls – Clean Up
Boom Lift
Low-level construction noise
Building Site
Interior Rough Buildout – North
Tape & Finish / Paint / Grid
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout – South
Tape & Finish / Paint
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North / South
Flashing,/ Metal Panels / Glazing
Boom Lift
Low-level and Mid-level construction noise
Building Site
Roof Equipment MEP
Forklift
Low-level and Mid-level construction noise
Building Site
Electrical – RPU Perm Power Inspection
Low-level construction noise
Building Site
Service Yard Retaining Walls
Forklift
Low-level and Mid-level construction noise
Building Site
Concrete - Sealing
Boom Lift
Low-level construction noise
Building Site
Site Utilities – Lot 50 Parking
(ENTRANCE CLOSURE) – 6/17
Backhoe
Low-level and Mid-level construction noise
Week of June 9, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – Non-Scheduled
Concrete Trucks
Mid-level construction noise
Building Site
Interior Finishes North – Grid, MEP Drops
Scissor Lifts
Low-level construction noise
Building Site
Interior Buildout South – Grid, MEP Drops
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North/South
Metal Panel System, Glazing
Boom Lifts
Low-level and Mid-level construction noise
Building Site
Roof MEP
Forklift
Low-level and Mid-level construction noise
Building Site
Electrical / IDF Buildout / Wire Pull
Scissor Lifts
Low-level construction noise
Building Site
Concrete - Sealing
Boom Lift
Low-level construction noise
Building Site
Service Yard Retaining Wall / Curbs
Forklift
Low-level construction noise
Building Site
Site Utilities – Lot 50 Parking
(ENTRANCE CLOSURE) – 6/17
Backhoe
Low-level and Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 50 & 51 – Entrance Closer
North Entrance at University Ave.
6/17 – 2 Months
Lot 50 & 51 Entrance will be located on Everton Pl.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #72
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (5/18/2026)
Current Week – May 18, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (7AM Start) – PV Foundations - 5/20 @ 5 am
Concrete trucks
Mid-level construction noise
Building Site
Concrete Walls – Clean Up
Boom Lift
Low-level construction noise
Building Site
Interior Rough Buildout – North
Drywall / Tape & Finish / Paint
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout – South
Drywall / Tape & Finish / Paint
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North / South
Flashing / Z-Girts / Glazing Mullions / Metal Panels & Wood
Boom Lift
Low-level and mid-level construction noise
Building Site
Roofing – South
High Bay PVC Roofing
Forklift
Low-level and mid-level construction noise
Building Site
MEP Roof
Forklift
Low-level and mid-level construction noise
Building Site
North Site – Fire Backflow
Backhoe
Low-level and mid-level construction noise
Building Site
Electrical / IDF – Buildout / Wire Pull
Low-level construction noise
Building Site
Site Utilities – Lot 50 Parking
(ENTRANCE CLOSURE) - TBD
Backhoe
Low-level and Mid-level construction noise
Week of May 25, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Concrete Walls – Clean Up
Boom Lift
Low-level construction noise
Building Site
Interior Rough Buildout – North
Tape & Finish / Paint / Grid
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout – South
Tape & Finish / Paint
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North / South
Flashing,/ Metal Panels / Glazing Mullions / Wood Panels
Boom Lift
Low-level and Mid-level construction noise
Building Site
Roof Equipment MEP
Forklift
Low-level and Mid-level construction noise
Building Site
Electrical / IDF – Buildout / Wire Pull
Low-level construction noise
Building Site
Service Yard Retaining Wall / Curbs
Forklift
Low-level and Mid-level construction noise
Building Site
Concrete - Sealing
Boom Lift
Low-level construction noise
Building Site
Site Utilities – Lot 50 Parking
(ENTRANCE CLOSURE) - TBD
Backhoe
Low-level and Mid-level construction noise
Week of June 1, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – Non-Scheduled
Concrete Trucks
Mid-level construction noise
Building Site
Interior Finishes North - Grid
Scissor Lifts
Low-level construction noise
Building Site
Interior Buildout – South
Paint Finishes
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North/South
Metal Panel System, Glazing, Wood Panels
Boom Lifts
Low-level and Mid-level construction noise
Building Site
Roof MEP
Forklift
Low-level and Mid-level construction noise
Building Site
Electrical / IDF Buildout / Wire Pull
Scissor Lifts
Low-level construction noise
Building Site
Concrete - Sealing
Boom Lift
Low-level construction noise
Building Site
Service Yard Retaining Wall / Curbs
Forklift
Low-level construction noise
Building Site
Site Utilities – Lot 50 Parking
(ENTRANCE CLOSURE) - TBD
Backhoe
Low-level and Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 50 & 51 – Entrance Closer
North Entrance at University Ave.
TBD – 1 Week
Lot 50 & 51 Entrance will be located on Everton Pl.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #71
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (5/11/2026)
Current Week – May 11, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (7AM Start) – N/A
Concrete trucks
Mid-level construction noise
Building Site
Concrete Walls – Clean Up
Boom Lift
Low-level construction noise
Building Site
Interior Rough Buildout – North
Drywall / Tape & Finish / Paint
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout – South
Drywall / Tape & Finish / Paint
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North / South
Flashing / Z-Girts / Glazing Mullions / Metal Panels & Wood
Boom Lift
Low-level and mid-level construction noise
Building Site
Roofing – South
High Bay PVC Roofing
Forklift
Low-level and mid-level construction noise
Building Site
MEP Roof
Forklift
Low-level and mid-level construction noise
Building Site
North Site – Modualar Wetland
Fire Backflow
Backhoe
Low-level and mid-level construction noise
Building Site
Electrical / IDF – Buildout / Wire Pull
Low-level construction noise
Building Site
Site Utilities – Lot 50 Parking
(ENTRANCE CLOSURE) - TBD
Backhoe
Low-level and Mid-level construction noise
Week of May 18, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Concrete Walls – Clean Up
Boom Lift
Low-level construction noise
Building Site
Interior Rough Buildout – North
Tape & Finish / Paint
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout – South
Tape & Finish / Paint
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North / South
Flashing,/ Metal Panels / Glazing Mullions / Wood Panels
Boom Lift
Low-level and Mid-level construction noise
Building Site
Roofing – South High Bay
Forklift
Low-level and mid-level construction noise
Building Site
Roof Equipment MEP
Forklift
Low-level and Mid-level construction noise
Building Site
Electrical / IDF – Buildout / Wire Pull
Low-level construction noise
Building Site
Service Yard Retaining Wall / Curbs
Forklift
Low-level and Mid-level construction noise
Building Site
Concrete - Sealing
Boom Lift
Low-level construction noise
Building Site
Site Utilities – Lot 50 Parking
(ENTRANCE CLOSURE) - TBD
Backhoe
Low-level and Mid-level construction noise
Week of May 25, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – Non-Scheduled
Concrete Trucks
Mid-level construction noise
Building Site
Interior Buildout – North
Paint / Finishes
Scissor Lifts
Low-level construction noise
Building Site
Interior Buildout – South
Paint Finishes
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North/South
Metal Panel System, Glazing, Wood Panels
Boom Lifts
Low-level and Mid-level construction noise
Building Site
Roof MEP
Forklift
Low-level and Mid-level construction noise
Building Site
Electrical / IDF Buildout / Wire Pull
Scissor Lifts
Low-level construction noise
Building Site
Concrete - Sealing
Boom Lift
Low-level construction noise
Building Site
Service Yard Retaining Wall / Curbs
Forklift
Low-level construction noise
Building Site
Site Utilities – Lot 50 Parking
(ENTRANCE CLOSURE) - TBD
Backhoe
Low-level and Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 50 & 51 – Entrance Closer
North Entrance at University Ave.
TBD – 1 Week
Lot 50 & 51 Entrance will be located on Everton Pl.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #70
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (5/4/2026)
Current Week – May 4, 2026 (SAFETY WEEK)
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (7AM Start) – N/A
Concrete trucks
Mid-level construction noise
Building Site
Concrete Walls – Clean Up
Boom Lift
Low-level construction noise
Building Site
Interior Rough Buildout – North
Drywall
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout – South
In-Wall Inspections
Low-level construction noise
Building Site
Exterior – North / South
Flashing / Z-Girts / Glazing Mullions
Boom Lift
Low-level and mid-level construction noise
Building Site
Roofing – South
High Bay PVC Roofing
Forklift
Low-level and mid-level construction noise
Building Site
MEP Setting Roof Top Equipment – 5/6
Crane
Low-level and mid-level construction noise
Building Site
North Site – Modualar Wetland
Re-route Unknown Utility
Backhoe
Low-level and mid-level construction noise
Building Site
Electrical / IDF - Buildout
Low-level construction noise
Building Site
Site Utilities – Lot 50 Parking
(ENTRANCE CLOSURE) - TBD
Backhoe
Low-level and Mid-level construction noise
Week of May 11, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Concrete Walls – Clean Up
Boom Lift
Low-level construction noise
Building Site
Interior Rough Buildout – North
Drywall / Tape & Finish
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout – South
Drywall
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North / South
Flashing,/ Metal Panels / Glazing Mullions
Boom Lift
Low-level and Mid-level construction noise
Building Site
Roofing – South
Forklift
Low-level and mid-level construction noise
Building Site
Roof Equipment MEP
Forklift
Low-level and Mid-level construction noise
Building Site
Electrical / IDF - Buildout
Building Site
Concrete - Sealing
Boom Lift
Low-level construction noise
Building Site
Site Utilities – Lot 50 Parking
(ENTRANCE CLOSURE) - TBD
Backhoe
Low-level and Mid-level construction noise
Week of May 18, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – Non-Scheduled
Concrete Trucks
Mid-level construction noise
Building Site
Interior Rough Buildout – North
Tape & Finish
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout – South
Tape & Finish
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North/South
Metal Panel System, Glazing Mullion
Boom Lifts
Low-level and Mid-level construction noise
Building Site
Roof MEP
Forklift
Low-level and Mid-level construction noise
Building Site
Electrical / IDF Buildout
Scissor Lifts
Low-level construction noise
Building Site
Concrete - Sealing
Boom Lift
Low-level construction noise
Building Site
Service Yard Retaining Wall / Curbs
Forklift
Low-level construction noise
Building Site
Site Utilities – Lot 50 Parking
(ENTRANCE CLOSURE) - TBD
Backhoe
Low-level and Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 50 & 51 – Entrance Closer
North Entrance at University Ave.
TBD – 1 Week
Lot 50 & 51 Entrance will be located on Everton Pl.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #69
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (4/27/2026)
Current Week – April 27, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (7AM Start) – Roof ISP Pad In-Fill
Concrete trucks
Mid-level construction noise
Building Site
Concrete Walls – Clean Up
Boom Lift
Low-level construction noise
Building Site
Interior Rough Buildout – North
In-wall Completion
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout – South
K-13 Spray / MEP OH
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North / South
Flashing / Z-Girts / Glazing Mullions
Boom Lift
Low-level and mid-level construction noise
Building Site
Roofing – South
Forklift
Low-level and mid-level construction noise
Building Site
Roof Equipment Stands / MEP
Forklift
Low-level and mid-level construction noise
Building Site
North Site – Modualar Wetland
Backhoe
Low-level and mid-level construction noise
Building Site
Electrical / IDF - Buildout
Low-level construction noise
Building Site
Site Utilities – Lot 50 Parking
(ENTRANCE CLOSURE) - TBD
Backhoe
Low-level and Mid-level construction noise
Week of May 4, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Concrete Walls – Clean Up
Boom Lift
Low-level construction noise
Building Site
Interior Rough Buildout – North
Prep for Wall Closure & Drywall
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout - South
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North / South
Flashing,/ Z-Girts / Glazing Mullions
Boom Lift
Low-level and Mid-level construction noise
Building Site
Roofing – South
Forklift
Low-level and mid-level construction noise
Building Site
Roof Equipment – Setting
5/6
Crane
Low-level and Mid-level construction noise
Building Site
Electrical / IDF - Buildout
Building Site
Exterior Concrete - Sealing
Boom Lift
Low-level construction noise
Building Site
Site Utilities – Lot 50 Parking
(ENTRANCE CLOSURE) - TBD
Backhoe
Low-level and Mid-level construction noise
Week of May 11, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – Non-Scheduled
Concrete Trucks
Mid-level construction noise
Building Site
Interior Rough Buildout – North
Drywall
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout – South
Wall Closure Inspections
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North/South
Metal Panel System, Glazing Mullion
Boom Lifts
Low-level and Mid-level construction noise
Building Site
Roof MEP
Forklift
Low-level and Mid-level construction noise
Building Site
Electrical / IDF Buildout
Scissor Lifts
Low-level construction noise
Building Site
Exterior Concrete - Sealing
Boom Lift
Low-level construction noise
Building Site
Service Yard Curbs
Forklift
Low-level construction noise
Building Site
Site Utilities – Lot 50 Parking
(ENTRANCE CLOSURE) - TBD
Backhoe
Low-level and Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 50 & 51 – Entrance Closer
North Entrance at University Ave.
TBD – 1 Week
Lot 50 & 51 Entrance will be located on Everton Pl.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #68
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (4/20/2026)
Current Week – April 20, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (7AM Start) – Roof ISP Pad In-Fill
Concrete trucks
Mid-level construction noise
Building Site
Concrete Walls – Clean Up
Boom Lift
Low-level construction noise
Building Site
Interior Rough Buildout – North
In-wall Completion
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout – South
K-13 Spray / MEP OH
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North / South
Air Barrier North / Z-Girts / Flashing
Boom Lift
Low-level and mid-level construction noise
Building Site
Roofing – North & South
Forklift
Low-level and mid-level construction noise
Building Site
Roof Equipment Stands / MEP
Forklift
Low-level and mid-level construction noise
Building Site
East Site – Storm Drain – MH’s
Backhoe
Low-level and mid-level construction noise
Building Site
Electrical / IDF - Buildout
Low-level construction noise
Building Site
Site Utilities – Lot 50 Parking
(ENTRANCE CLOSURE) - TBD
Backhoe
Low-level and Mid-level construction noise
Week of April 27, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Concrete Walls – Clean Up
Boom Lift
Low-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout - South
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North / South
Air Barrier,/ Z-Girts / Flashing
Boom Lift
Low-level and Mid-level construction noise
Building Site
Roofing – North & South
Forklift
Low-level and mid-level construction noise
Building Site
Roof Equipment - Setting
Crane
Low-level and Mid-level construction noise
Building Site
Electrical / IDF - Buildout
Building Site
Exterior Concrete - Sealing
Boom Lift
Low-level construction noise
Building Site
Site Utilities – Lot 50 Parking
(ENTRANCE CLOSURE) - TBD
Backhoe
Low-level and Mid-level construction noise
Week of April 27, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – Non-Scheduled
Concrete Trucks
Mid-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout - South
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North/South
Metal Panel System, Glazing Mullion
Boom Lifts
Low-level and Mid-level construction noise
Building Site
Roof MEP
Forklift
Low-level and Mid-level construction noise
Building Site
Electrical / IDF Buildout
Scissor Lifts
Low-level construction noise
Building Site
Exterior Concrete - Sealing
Boom Lift
Low-level construction noise
Building Site
Exterior Concrete Sealing
Boom Lift
Low-level construction noise
Building Site
Site Utilities – Lot 50 Parking
(ENTRANCE CLOSURE) - TBD
Backhoe
Low-level and Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 50 & 51 – Entrance Closer
North Entrance at University Ave.
TBD – 1 Week
Lot 50 & 51 Entrance will be located on Everton Pl.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #67
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (4/13/2026)
Current Week – April 13, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Concrete Floor Sealing
Low-level construction noise
Building Site
Interior Rough Buildout – North
In-wall Completion
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout – South
K-13 Spray / MEP OH
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North / South
Air Barrier North
Boom Lift
Low-level and mid-level construction noise
Building Site
Roofing – North & South – Torched applied Membrane South
Forklift
Low-level and mid-level construction noise
Building Site
Roof Equipment Stands
Low-level and mid-level construction noise
Building Site
East Site – Storm Drain Line
South – Sewer Service Yard
Backhoe
Low-level and mid-level construction noise
Building Site
Setting Electrical Gear
Forklift
Low-level construction noise
Building Site
Site Utilities – Lot 50 Parking
(ENTRANCE CLOSURE) - TBD
Week of April 20, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Concrete Floor Sealing
Low-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout - South
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North / South
Air Barrier & Metal Panel System
Boom Lift
Low-level and Mid-level construction noise
Building Site
Roofing – North & South – Torched applied Membrane South
Forklift
Low-level and mid-level construction noise
Building Site
Roof Pad Prep for Mech Equipment
Forklift
Low-level and Mid-level construction noise
Building Site
Site Utilities – Sewer South
Backhoe
Low-level construction noise
Week of April 27, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – Non-Scheduled
Concrete Trucks
Mid-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North/South
Metal Panel System, Glazing Mullion
Boom Lifts
Low-level and Mid-level construction noise
Building Site
Roof Mechanical Equipment Setting – 4/27
Crane
Low-level and Mid-level construction noise
Building Site
Electrical / IDF Equipment Anchoring Equipment
Scissor Lifts
Low-level construction noise
Building Site
Exterior Concrete Sealing
Boom Lift
Low-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 50 & 51 – Entrance Closer
North Entrance at University Ave.
TBD – 1 Week
Lot 50 & 51 Entrance will be located on Everton Pl.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #66
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (4/6/2026)
Current Week – April 6, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Shear Wall Cleaning
Boom Lift
Low-level construction noise
Building Site
Interior Rough Buildout – North
In-wall Completion
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout – South
MEP OH
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North / South
Air Barrier North
Boom Lift
Low-level and mid-level construction noise
Building Site
Roofing – North & South – Torched applied Membrane South
Forklift
Low-level and mid-level construction noise
Building Site
Roof Equipment Stands
Low-level and mid-level construction noise
Building Site
East Site – Storm Drain Line
Backhoe
Low-level and mid-level construction noise
Building Site
Site Utilities – Lot 50 Parking
(ENTRANCE CLOSURE) - TBD
Week of April 13, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Shear Wall Cleaning
Boom Lift
Low-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout - South
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North / South
Air Barrier & Metal Panel System
Boom Lift
Low-level and Mid-level construction noise
Building Site
Roofing – North & South – Torched applied Membrane South
Forklift
Low-level and mid-level construction noise
Building Site
Setting Electrical Equipment
Forklift
Low-level and Mid-level construction noise
Building Site
Site Utilities – Sewer South
Backhoe
Low-level construction noise
Week of April 20, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – Non-Scheduled
Concrete Trucks
Mid-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North/South
Metal Panel System, Glazing Mullion
Boom Lifts
Low-level and Mid-level construction noise
Building Site
Roofing – North & South – PVC
Prep Rooftop Equipment
Forklift
Low-level and Mid-level construction noise
Building Site
Electrical / IDF Equipment
Scissor Lifts
Low-level construction noise
Building Site
Site Utilities – Sewer South
Backhoe
Low-level and Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 50 & 51 – Entrance Closer
North Entrance at University Ave.
TBD – 1 Week
Lot 50 & 51 Entrance will be located on Everton Pl.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #65
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (3/30/2026)
Current Week – March 30, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Shear Wall Cleaning
Boom Lift
Low-level construction noise
Building Site
Interior Rough Buildout – North
Duct Work
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout – South
Top-Down Drywall
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North / South
Air Barrier Starting North
Boom Lift
Low-level and mid-level construction noise
Building Site
Roofing – North & South – Torched applied Membrane South
Forklift
Low-level and mid-level construction noise
Building Site
East Site – Storm Drain Line
Backhoe
Low-level and mid-level construction noise
Building Site
Site Utilities – East Site
(ENTRANCE OPEN)
Week of April 6, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Shear Wall Cleaning
Boom Lift
Low-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout - South
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North / South
Air Barrier
Boom Lift
Low-level and Mid-level construction noise
Building Site
Roofing – North & South – Torched applied Membrane South
Forklift
Low-level and mid-level construction noise
Building Site
Site Utilities – Storm Drain
Backhoe
Low-level construction noise
Week of April 13, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – Non-Scheduled
Concrete Trucks
Mid-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North/South
Air Barrier / Flasing
Boom Lifts
Low-level and Mid-level construction noise
Building Site
Roofing – North & South – Torched applied Membrane
Forklift
Low-level and Mid-level construction noise
Building Site
Site Utilities – Sewer South
Backhoe
Low-level and Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 50 & 51 – Entrance Closer
North Entrance at University Ave.
TBD – 1 Week
Lot 50 & 51 Entrance will be located on Everton Pl.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #64
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (3/23/2026)
Current Week – March 23, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Wood Blocking
Scissor Lifts, Forklift
Low-level and mid-level construction noise
Building Site
Shear Wall Cleaning
Boom Lift
Low-level construction noise
Building Site
Interior Rough Buildout – North
Duct Work
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout – South
Top-Down Drywall
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North / South
Boom Lift
Low-level and mid-level construction noise
Building Site
Roofing – North & South – Torched applied Membrane South
Forklift
Low-level and mid-level construction noise
Building Site
Place Sidewalk University Ave. – 3/24
Traffic Control
Low-level construction noise
Building Site
Site Utilities – East Site
(ENTRANCE CLOSER) – Spring Break
Backhoe
Air Vacuum Truck
Low-level construction noise
Week of March 30, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Shear Wall Cleaning
Boom Lift
Low-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout - South
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North / South
Boom Lift
Low-level and Mid-level construction noise
Building Site
Roofing – North & South – Torched applied Membrane South
Forklift
Low-level and mid-level construction noise
Building Site
Site Utilities – Storm Drain East Site
Backhoe
Low-level construction noise
Week of April 6, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – Non-Scheduled
Concrete Trucks
Mid-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout - South
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North/South
Boom Lifts
Low-level and Mid-level construction noise
Building Site
Roofing – North & South – Torched applied Membrane
Forklift
Low-level and Mid-level construction noise
Building Site
Site Utilities – East Site Storm Drain & Sewer South
Backhoe
Low-level and Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 50 & 51 – Entrance Closer
North Entrance at University Ave.
3.23.26 – 3.27.26
Lot 50 & 51 Entrance will be located on Everton Pl.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
Thank you,
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #63
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (3/16/2026)
Current Week – March 16, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Wood Blocking
Scissor Lifts, Forklift
Low-level and mid-level construction noise
Building Site
Shear Wall Cleaning
Boom Lift
Low-level construction noise
Building Site
Interior Rough Buildout – North
Duct Work
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout – South
Top-Down Drywall
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North / South
Boom Lift
Low-level and mid-level construction noise
Building Site
Roofing – North & South – Torched applied Membrane
Forklift
Low-level and mid-level construction noise
Building Site
Site Utilities – North Storm Drain Tie-in
Backhoe
Bore Machine
Low-level construction noise
Week of March 23, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Shear Wall Cleaning
Boom Lift
Low-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout - South
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North / South
Boom Lift
Low-level and Mid-level construction noise
Building Site
Roofing – North & South – Torched applied Membrane
Forklift
Low-level and mid-level construction noise
Building Site
Site Utilities – East Site
(ENTRANCE CLOSER) – Spring Break
Backhoe
Low-level construction noise
Week of March 30, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – Non-Scheduled
Concrete Trucks
Mid-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout - South
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North/South
Boom Lifts
Low-level and Mid-level construction noise
Building Site
Roofing – North & South – Torched applied Membrane
Forklift
Low-level and Mid-level construction noise
Building Site
Site Utilities – East Site Storm Drain
Backhoe
Low-level and Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 50 & 51 – Entrance Closer
North Entrance at University Ave.
3.23.26 – 3.27.26
Lot 50 & 51 Entrance will be located on Everton Pl.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #62
3/9/2026 - 950604 UCR SoCal OASIS™ Park – Construction Progress Update #62
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (3/9/2026)
Current Week – March 9, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Below Grade Waterproofing
Low-level construction noise
Building Site
Structural Steel Added Beams
Forklift, Scissor Lifts
Low-level and Mid-level construction noise
Building Site
Mass Timber Shear Walls Detailing
Scissor Lifts, Forklift
Low-level and mid-level construction noise
Building Site
Shear Wall Cleaning
Boom Lift
Low-level construction noise
Building Site
Interior Rough Buildout – North
Duct Work
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout – South
Top-Down Drywall
Scissor Lifts
Low-level construction noise
Building Site
Exterior - North
Boom Lift
Low-level and mid-level construction noise
Building Site
Roofing - North
Forklift
Low-level and mid-level construction noise
Building Site
Site Utilities – Fire Water & Storm Drain East
Backhoe
Bore Machine
Low-level construction noise
Entrance Closed
Week of March 16, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Below Grade Waterproofing
Low-level construction noise
Building Site
Shear Wall Cleaning
Boom Lift
Low-level construction noise
Building Site
Mass Timber Shear Wall Detailing
Scissor Lifts, Forklift
Low-level and mid-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout - South
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North/South
Boom Lift
Low-level and Mid-level construction noise
Building Site
Roofing - North
Forklift
Low-level and mid-level construction noise
Building Site
Site Utilities – East Storm Drain
Backhoe
Bore Machine
Low-level construction noise
Week of March 23, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – Non-Scheduled
Concrete Trucks
Mid-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout - South
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Building Site
Exterior – North/South
Boom Lifts
Low-level and Mid-level construction noise
Building Site
Roofing - North
Forklift
Low-level and Mid-level construction noise
Building Site
Site Utilities – East Site
(ENTRANCE CLOSER) – Spring Break
Backhoe
Low-level and Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 50 & 51 – Entrance Closer
North Entrance at University Ave.
3.23.26 – 3.27.26
Lot 50 & 51 Entrance will be located on Everton Pl.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #61
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (3/2/2026)
Current Week – March 2, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – South Low Bay Roof Pads – 3/6/26
Concrete trucks
Mid-level construction noise
Building Site
Below Grade Waterproofing
Low-level construction noise
Building Site
Structural Steel Added Beams
Forklift, Scissor Lifts
Low-level and Mid-level construction noise
Building Site
Mass Timber Shear Walls Detailing
Scissor Lifts, Forklift
Low-level and mid-level construction noise
Building Site
Shear Wall Cleaning
Boom Lift
Low-level construction noise
Building Site
Interior Rough Buildout – North
Duct Work Starting
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout - South
Scissor Lifts
Low-level construction noise
Building Site
Exterior - North
Boom Lift
Low-level and mid-level construction noise
Building Site
Roofing - North
Forklift
Low-level and mid-level construction noise
Building Site
Site Utilities – Start
(ENTRANCE CLOSED) 3/2-3/4
Backhoe
Bore Machine
Low-level construction noise
Entrance Closed
Week of March 9, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Below Grade Waterproofing
Low-level construction noise
Building Site
Shear Wall Cleaning
Boom Lift
Low-level construction noise
Building Site
Structural Steel Added Beams from Inside
Forklift
Low-level and mid-level construction noise
Building Site
Mass Timber Shear Wall Detailing
Scissor Lifts, Forklift
Low-level and mid-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout - South
Scissor Lifts
Low-level construction noise
Building Site
Exterior - North
Boom Lift
Low-level and Mid-level construction noise
Building Site
Roofing - North
Forklift
Low-level and mid-level construction noise
Building Site
Site Utilities – East Side of Project
Backhoe
Bore Machine
Low-level construction noise
Week of March 16, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – Non-Scheduled
Concrete Trucks
Mid-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout - South
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Building Site
Exterior - North
Boom Lifts
Low-level and Mid-level construction noise
Building Site
Roofing - North
Forklift
Low-level and Mid-level construction noise
Building Site
Site Utilities – East Site
Backhoe
Low-level and Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 50 & 51 – Entrance Closer
North Entrance at University Ave.
3.2.26 – 3.4.26 3.23.26 – 3.27.26
Lot 50 & 51 Entrance will be located on Everton Pl.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #60
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (2/23/2026)
Current Week – February 23, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Below Grade Waterproofing
Low-level construction noise
Building Site
Structural Steel Added Beams
Forklift, Scissor Lifts
Low-level and Mid-level construction noise
Building Site
Mass Timber Shear Walls Detailing
Scissor Lifts, Forklift
Low-level and mid-level construction noise
Building Site
Shear Wall Cleaning
Boom Lift
Low-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout - South
Scissor Lifts
Low-level construction noise
Building Site
Exterior - North
Boom Lift
Low-level and mid-level construction noise
Building Site
Roofing - North
Forklift
Low-level and mid-level construction noise
Building Site
Site Utilities – North Prep
Backhoe
Low-level construction noise
Week of March 2, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – Roof Pads – 3/6
Concrete trucks
Mid-level construction noise
Building Site
Below Grade Waterproofing
Low-level construction noise
Building Site
Shear Wall Cleaning
Boom Lift
Low-level construction noise
Building Site
Structural Steel Added Beams from Inside
Forklift
Low-level and mid-level construction noise
Building Site
Mass Timber Shear Wall Detailing
Scissor Lifts, Forklift
Low-level and mid-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout - South
Scissor Lifts
Low-level construction noise
Building Site
Exterior - North
Boom Lift
Low-level and Mid-level construction noise
Building Site
Roofing - North
Forklift
Low-level and mid-level construction noise
Building Site
Site Utilities – Lot 50 Entrance
(ENTRANCE CLOSED) 3/2-3/4
Backhoe
Low-level construction noise
Week of March 9, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – Non-Scheduled
Concrete Trucks
Mid-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout - South
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Building Site
Exterior - North
Boom Lifts
Low-level and Mid-level construction noise
Building Site
Roofing - North
Forklift
Low-level and Mid-level construction noise
Building Site
Site Utilities – East Site
Backhoe
Low-level and Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 50 & 51 – Entrance Closer
North Entrance at University Ave.
3.2.26 – 3.4.26 3.23.26 – 3.27.26
Lot 50 & 51 Entrance will be located on Everton Pl.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #59
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (2/16/2026)
Current Week – February 16, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – High Bay Deck Placement – 2/20/26
Concrete trucks
Mid-level construction noise
Building Site
Below Grade Waterproofing
Low-level construction noise
Building Site
Structural Steel Detailing
Forklift, Scissor Lifts
Low-level and Mid-level construction noise
Building Site
Mass Timber Shear Walls Detailing
Scissor Lifts, Forklift
Low-level and mid-level construction noise
Building Site
Metal Decking – Detailing
Welding Machines
Mid-level construction noise
Building Site
MEPF Deck Inserts
Low-level construction noise
Building Site
Roof Reinforcing – High Bay
Scissor Lifts
Low-level and mid-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Building Site
Exterior - North
Boom Lift
Low-level and mid-level construction noise
Building Site
Roofing – North – Rain Dependent
Forklift
Low-level and mid-level construction noise
Week of February 23, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Below Grade Waterproofing
Low-level construction noise
Building Site
Shear Wall Cleaning
Boom Lift
Low-level construction noise
Building Site
Structural Steel Added Beams from Inside
Forklift
Low-level and mid-level construction noise
Building Site
Mass Timber Shear Wall Detailing
Scissor Lifts, Forklift
Low-level and mid-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout - South
Scissor Lifts
Low-level construction noise
Building Site
Exterior - North
Boom Lift
Low-level and Mid-level construction noise
Building Site
Roofing - North
Forklift
Low-level and mid-level construction noise
Building Site
Site Utilities - North
Backhoe
Low-level construction noise
Week of March 2, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – Non-Scheduled
Concrete Trucks
Mid-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout - South
Scissor Lifts
Low-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Building Site
Exterior - North
Boom Lifts
Low-level and Mid-level construction noise
Building Site
Roofing - North
Forklift
Low-level and Mid-level construction noise
Building Site
Site Utilities – North Lot 50 Entrance (ENTRANCE CLOSED) 3/2-3/4
Backhoe
Low-level and Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 50 & 51 – Entrance Closer
North Entrance at University Ave.
3.2.26 – 3.4.26 3.23.26 – 3.27.26
Lot 50 & 51 Entrance will be located on Everton Pl.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #58
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (2/9/2026)
Current Week – February 9, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – High Bay Deck Placement – 3/10/26
Concrete trucks
Mid-level construction noise
Building Site
Below Grade Waterproofing
Low-level construction noise
Building Site
Structural Steel Detailing
Forklift, Scissor Lifts
Low-level and Mid-level construction noise
Building Site
Mass Timber Shear Walls Detailing
Scissor Lifts, Forklift
Low-level and mid-level construction noise
Building Site
Metal Decking – Detailing
Welding Machines
Mid-level construction noise
Building Site
MEPF Deck Inserts
Low-level construction noise
Building Site
Roof Reinforcing – High Bay
Scissor Lifts
Low-level and mid-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Building Site
Roofing - North
Low-level construction noise
Week of February 16, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – Low Bay Deck Placement – 3/17/26
Concrete trucks
Mid-level construction noise
Building Site
Below Grade Waterproofing
Low-level construction noise
Building Site
Shear Wall Cleaning
Boom Lift
Low-level construction noise
Building Site
Structural Steel Detailing
Forklift
Low-level and mid-level construction noise
Building Site
Mass Timber Shear Wall Detailing
Scissor Lifts, Forklift
Low-level and mid-level construction noise
Building Site
Metal Decking – Detail
Welding Machines
Mid-level construction noise
Building Site
Roof Reinforcing – Low Bay
Low-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Building Site
Exterior - North
Boom Lift
Low-level and mid-level construction noise
Building Site
Roofing - North
Low-level construction noise
Week of February 23, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – Non-Scheduled
Concrete Trucks
Mid-level construction noise
Building Site
Below Grade Waterproofing
Low-level construction noise
Building Site
Structural Steel Beams
Forklift
Low-level and mid-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Building Site
Exterior - North
Boom Lifts
Low-level and Mid-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 50 & 51 – Entrance Closer
North Entrance at University Ave.
3.2.26 – 3.4.26 3.23.26 – 3.27.26
Lot 50 & 51 Entrance will be on Everton Pl.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #57
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (2/2/2026)
Current Week – February 2, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5 AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Below Grade Waterproofing
Low-level construction noise
Building Site
Structural Steel Detailing
Forklift
Low-level and mid-level construction noise
Building Site
Mass Timber Shear Walls Detailing
Scissor Lifts, Forklift
Low-level and mid-level construction noise
Building Site
Metal Decking – Detailing
Welding Machines
Mid-level construction noise
Building Site
MEPF Deck Inserts
Low-level construction noise
Building Site
Roof Reinforcing
Scissor Lifts
Low-level and mid-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Week of February 9, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – High Bay Deck Placement – 3/10/26
Concrete trucks
Mid-level construction noise
Building Site
Below Grade Waterproofing
Low-level construction noise
Building Site
Shear Wall Cleaning
Boom Lift
Low-level construction noise
Building Site
Structural Steel Detailing
Forklift
Low-level and mid-level construction noise
Building Site
Mass Timber Shear Wall Detailing
Scissor Lifts, Forklift
Low-level and mid-level construction noise
Building Site
Metal Decking – Detail
Welding Machines
Mid-level construction noise
Building Site
MEPF Deck Inserts
Low-level construction noise
Building Site
Roof Reinforcing
Scissor Lifts
Low-level and mid-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Week of February 16, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – Low Bay Deck Placement – 3/17/26
Concrete Trucks
Mid-level construction noise
Building Site
Below Grade Waterproofing
Low-level construction noise
Building Site
Structural Steel Detailing
Forklift
Low-level and mid-level construction noise
Building Site
Metal Decking – Detail
Forklift
Low-level and mid-level construction noise
Building Site
Roof Reinforcing
Scissor Lifts
Low-level and mid-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 50 & 51 – Entrance Closer
North Entrance at University Ave.
3.2.26 – 3.4.26 3.23.26 – 3.27.26
Lot 50 & 51 Entrance will be on Everton Pl.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #56
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (1/26/2026)
Current Week – January 26, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5 AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Below Grade Concrete Cleaning
Low-level construction noise
Building Site
Structural Steel Detailing
Forklift
Low-level and mid-level construction noise
Building Site
Mass Timber Shear Walls Detailing
Scissor Lifts, Forklift
Low-level and mid-level construction noise
Building Site
Metal Decking – Detailing
Welding Machines
Mid-level construction noise
Building Site
MEPF Deck Inserts
Low-level construction noise
Building Site
Roof Reinforcing
Scissor Lifts
Low-level and mid-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Week of February 2, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Below Grade Waterproofing
Low-level construction noise
Building Site
Shear Wall Cleaning
Boom Lift
Low-level construction noise
Building Site
Structural Steel Detailing
Forklift
Low-level and mid-level construction noise
Building Site
Mass Timber Shear Wall Detailing
Scissor Lifts, Forklift
Low-level and mid-level construction noise
Building Site
Metal Decking – Detail
Welding Machines
Mid-level construction noise
Building Site
MEPF Deck Inserts
Low-level construction noise
Building Site
Roof Reinforcing
Scissor Lifts
Low-level and mid-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Week of February 9, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – High Bay Deck Placement – 2/10
Concrete Trucks
Mid-level construction noise
Building Site
Below Grade Waterproofing
Low-level construction noise
Building Site
Structural Steel Detailing
Forklift
Low-level and mid-level construction noise
Building Site
Metal Decking – Detail
Forklift
Low-level and mid-level construction noise
Building Site
Roof Reinforcing
Scissor Lifts
Low-level and mid-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #55
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (1/19/2026)
Current Week – January 19, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5 AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Below Grade Concrete Cleaning
Low-level construction noise
Building Site
Structural Steel Detailing
Forklift
Low-level and mid-level construction noise
Building Site
Mass Timber Shear Walls Detailing
Scissor Lifts, Forklift
Low-level and mid-level construction noise
Building Site
Metal Decking – Detailing
Welding Machines
Mid-level construction noise
Building Site
MEPF Deck Inserts
Low-level construction noise
Building Site
Roof Reinforcing
Scissor Lifts
Low-level and mid-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Week of December 26, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – High Bay Deck Placement – 1/30
Concrete trucks
Mid-level construction noise
Building Site
Below Grade Waterproofing
Low-level construction noise
Building Site
Shear Wall Cleaning
Boom Lift
Low-level construction noise
Building Site
Structural Steel Detailing
Forklift
Low-level and mid-level construction noise
Building Site
Mass Timber Shear Wall Detailing
Scissor Lifts, Forklift
Low-level and mid-level construction noise
Building Site
Metal Decking – Detail
Welding Machines
Mid-level construction noise
Building Site
MEPF Deck Inserts
Low-level construction noise
Building Site
Roof Reinforcing
Scissor Lifts
Low-level and mid-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Week of February 2, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – Low Bay Deck Placement – 2/6
Concrete Trucks
Mid-level construction noise
Building Site
Below Grade Waterproofing
Low-level construction noise
Building Site
Shear Wall Cleaning
Boom Lift
Low-level construction noise
Building Site
Metal Decking – Detail
Forklift
Low-level and mid-level construction noise
Building Site
Roof Reinforcing
Scissor Lifts
Low-level and mid-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #54
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (1/12/2026)
Current Week – January 12, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5 AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Shear Wall Cleaning
Boom Lift
Low-level construction noise
Building Site
Structural Steel Detailing
Forklift
Low-level and mid-level construction noise
Building Site
Mass Timber Shear Walls
Scissor Lifts, Forklift
Low-level and mid-level construction noise
Building Site
Metal Decking – Detailing
Welding Machines
Mid-level construction noise
Building Site
MEPF Deck Inserts
Low-level construction noise
Building Site
Roof Reinforcing
Scissor Lifts
Low-level and mid-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Week of December 19, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Shear Wall Cleaning
Boom Lift
Low-level construction noise
Building Site
Structural Steel Detailing
Forklift
Low-level and mid-level construction noise
Building Site
Mass Timber Shear Walls
Scissor Lifts, Forklift
Low-level and mid-level construction noise
Building Site
Metal Decking – Detail
Welding Machines
Mid-level construction noise
Building Site
MEPF Deck Inserts
Low-level construction noise
Building Site
Roof Reinforcing
Scissor Lifts
Low-level and mid-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Week of January 26, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – High Bay – 1.27 / Low Bay – 1/29
Concrete Trucks
Mid-level construction noise
Building Site
Shear Wall Cleaning
Boom Lift
Low-level construction noise
Building Site
Metal Decking – Detail
Forklift
Low-level and mid-level construction noise
Building Site
Roof Reinforcing
Scissor Lifts
Low-level and mid-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #53
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (1/5/2026)
Current Week – January 5, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5 AM Start) – Pad Placement 1.7.26
Concrete trucks
Mid-level construction noise
Building Site
Shear Wall Cleaning
Boom Lift
Low-level construction noise
Building Site
Structural Steel Detailing
Forklift
Low-level and mid-level construction noise
Building Site
Mass Timber Shear Walls
Scissor Lifts, Forklift
Low-level and mid-level construction noise
Building Site
Metal Decking – Detailing
Welding Machines
Mid-level construction noise
Building Site
MEPF Deck Inserts
Low-level construction noise
Building Site
Roof Reinforcing
Scissor Lifts
Low-level and mid-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Week of December 12, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – High Bay Roof Placement – 1.13
Concrete trucks
Mid-level construction noise
Building Site
Shear Wall Cleaning
Boom Lift
Low-level construction noise
Building Site
Structural Steel Detailing
Forklift
Low-level and mid-level construction noise
Building Site
Mass Timber Shear Walls
Scissor Lifts, Forklift
Low-level and mid-level construction noise
Building Site
Metal Decking – Detail
Welding Machines
Mid-level construction noise
Building Site
MEPF Deck Inserts
Low-level construction noise
Building Site
Roof Reinforcing
Scissor Lifts
Low-level and mid-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Week of January 19, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – Low Bay Roof Placement – 1.22
Concrete Trucks
Mid-level construction noise
Building Site
Shear Wall Cleaning
Boom Lift
Low-level construction noise
Building Site
Metal Decking – Detail
Forklift
Low-level and mid-level construction noise
Building Site
Roof Reinforcing
Scissor Lifts
Low-level and mid-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #52
lease be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (12/22/2025)
Current Week – December 22, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (11AM Start) – 12/19 Placement – Dyno Slab, Steel Beam Encl.
Concrete trucks
Mid-level construction noise
Building Site
Shear Wall Cleaning
Boom Lift
Low-level construction noise
Building Site
Structural Steel Delivery / Erection
Forklift
Low-level and mid-level construction noise
Building Site
Mass Timber Shear Walls
Scissor Lifts, Forklift
Low-level and mid-level construction noise
Building Site
Metal Decking – Spread & Tack
Welding Machines
Mid-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Week of December 29, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Shear Wall Cleaning
Boom Lift
Low-level construction noise
Building Site
Structural Steel Erection
Forklift
Low-level and mid-level construction noise
Building Site
Mass Timber Shear Walls
Scissor Lifts, Forklift
Low-level and mid-level construction noise
Building Site
Metal Decking – Detail
Welding Machines
Mid-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Week of January 5, 2026
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete Trucks
Mid-level construction noise
Building Site
Shear Wall Cleaning
Boom Lift
Low-level construction noise
Building Site
Metal Decking – Detail
Forklift
Low-level and mid-level construction noise
Building Site
MEP Deck Inserts - Lab
Low-level construction noise
Building Site
Interior Rough Buildout - North
Scissor Lifts
Low-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #51
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (12/15/2025)
Current Week – December 15, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Shear Wall Cleaning
Boom Lift
Low-level construction noise
Building Site
Structural Steel Delivery / Erection
Trucks, Forklift, 90T Crane
Low-level and mid-level construction noise
Building Site
Mass Timber Shear Walls
Scissor Lifts, Forklift
Low-level and mid-level construction noise
Building Site
Metal Decking – Spread & Tack
Mid-level construction noise
Week of December 22, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Shear Wall Cleaning
Boom Lift
Low-level construction noise
Building Site
Structural Steel Erection
Trucks, Forklift 90T Crane
Low-level and mid-level construction noise
Building Site
Mass Timber Shear Walls
Scissor Lifts, Forklift
Low-level and mid-level construction noise
Building Site
Metal Decking – Spread & Tack
Mid-level construction noise
Week of December 29, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete Trucks
Mid-level construction noise
Building Site
Shear Wall Cleaning
Boom Lift
Low-level construction noise
Building Site
Structural Steel Erection
90T Crane, Forklift
Low-level and mid-level construction noise
Building Site
Mass Timber Shear Walls
Scissor Lifts, Forklift
Low-level and mid-level construction noise
Building Site
Metal Decking – Spread & Tack
Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park - Construction Progress Update #50
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (12/8/2025)
Current Week – December 8, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
SOG Activities – Clean Up / Strip
Forklift
Low-level and mid-level construction noise
Building Site
Wall De-Fabricate – Break Down Panels
90T Crane, Forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Structural Steel Delivery / Erection
Trucks, Forklift, 90T Crane
Low-level and mid-level construction noise
Building Site
Mass Timber Erection
Trucks, Scissor Lifts
110T Crane
Mid-level construction noise
Week of December 15, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Wall Clean Activities
Boom Lift
Low-level
Building Site
Wall De-Fabrication
Forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Structural Steel Erection
Trucks, Forklift 90T Crane
Low-level and mid-level construction noise
Building Site
Mass Timber Erection
Scissor Lifts
110T Crane
Mid-level construction noise
Week of December 22, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Wall Clean Activities
Boom Lift
Low-level
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Structural Steel
90T Crane, Forklift
Mid-level construction noise
Building Site
Mass Timber Erection
Scissor Lifts
110T Crane
Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #49
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (12/1/2025)
Current Week – December 1, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
SOG Activities – Clean Up / Strip
Forklift
Low-level and mid-level construction noise
Building Site
CIP wall construction – Break Down Panels
90T Crane, Forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Structural Steel Delivery / Erection
Trucks, Forklift
Low-level and mid-level construction noise
Building Site
Mass Timber Erection
Trucks, Scissor Lifts
110T Crane
Mid-level construction noise
Week of December 8, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Wall Clean Activities
Boom Lift
Low-level
Building Site
Wall De-Fabrication
Forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Structural Steel Erection
Trucks, Forklift 90T Crane
Low-level and mid-level construction noise
Building Site
Mass Timber Erection
Scissor Lifts
110T Crane
Mid-level construction noise
Week of December 15, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Wall Clean Activities
Boom Lift
Low-level
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Structural Steel
90T Crane, Forklift
Mid-level construction noise
Building Site
Mass Timber Erection
Scissor Lifts
110T Crane
Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #48
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (11/24/2025)
Current Week – November 24, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
SOG Activities
Backhoe, Forklift
Low-level and mid-level construction noise
Building Site
CIP wall construction
90T Crane, Forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start)
Concrete trucks
Mid-level construction noise
Building Site
Structural Steel Delivery
Trucks, forklift
Low-level and mid-level construction noise
Building Site
Mass Timber Erection
Trucks, Scissor Lifts
110T Crane
Mid-level construction noise
Week of December 1, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Wall Clean Activities
Boom Lift
Low-level
Building Site
Wall De-Fabrication
Forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Structural Steel
Trucks, Forklift 90T Crane
Low-level and mid-level construction noise
Building Site
Mass Timber Erection
Scissor Lifts
110T Crane
Mid-level construction noise
Week of December 8, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Wall Clean Activities
Boom Lift
Low-level
Building Site
Concrete Placement (5AM Start) – None Scheduled
Concrete trucks
Mid-level construction noise
Building Site
Structural Steel
90T Crane, Forklift
Mid-level construction noise
Building Site
Mass Timber Erection
Scissor Lifts
110T Crane
Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park - Construction Progress Update #47
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (11/17/2025)
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
SOG Activities
Backhoe, forklift
Low-level and mid-level construction noise
Building Site
CIP wall construction
90T Crane, forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start)
Concrete trucks
Mid-level construction noise
Building Site
Misc. Steel
Trucks, forklift
Low-level and mid-level construction noise
Building Site
Mass Timber Delivery / Erection
Trucks, Scissor Lifts
110T Crane
Mid-level construction noise
Week of November 24, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
SOG Activities
Backhoe, forklift
Low-level and mid-level construction noise
Building Site
CIP wall construction
90T Crane, forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start)
Concrete trucks
Mid-level construction noise
Building Site
Misc. Steel
Trucks, forklift
Low-level and mid-level construction noise
Building Site
Mass Timber Erection
Scissor Lifts
110T Crane
Mid-level construction noise
Week of December 1, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Wall Clean Activities
Boom lift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start)
Concrete trucks
Mid-level construction noise
Building Site
Structural Steel
90T Crane, forklift Trucks
Mid-level construction noise
Building Site
Mass Timber Erection
Scissor Lifts
110T Crane
Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park - Construction Progress Update #46
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (11/10/2025)
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
SOG Activities
Backhoe, forklift
Low-level and mid-level construction noise
Building Site
CIP wall construction
90T Crane, forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start)
Concrete trucks
Mid-level construction noise
Building Site
Misc. Steel
Trucks
Low-level and mid-level construction noise
Building Site
Mass Timber Delivery / Erection
Trucks, Boom Lift
110T Crane
Mid-level construction noise
Week of November 17, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
SOG Activities
Backhoe, forklift
Low-level and mid-level construction noise
Building Site
CIP wall construction
90T Crane, forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start)
Concrete trucks
Mid-level construction noise
Building Site
Misc. Steel
Trucks
Low-level and mid-level construction noise
Building Site
Mass Timber Delivery / Erection
Trucks, Boom Lift
110T Crane
Mid-level construction noise
Week of November 24, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
SOG Activities
Backhoe, forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start)
Concrete trucks
Mid-level construction noise
Building Site
Structural Steel
90T Crane, forklift Trucks
Mid-level construction noise
Building Site
Mass Timber Delivery / Erection
Trucks, Boom Lift
110T Crane
Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #45
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (11/3/2025)
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
SOG Activities
Backhoe, forklift
Low-level and mid-level construction noise
Building Site
CIP wall construction
90T Crane, forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start)
Concrete trucks
Mid-level construction noise
Building Site
Misc. Steel
Loader, Trucks
Low-level and mid-level construction noise
Week of November 10, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
SOG Activities
Backhoe, forklift
Low-level and mid-level construction noise
Building Site
CIP wall construction
90T Crane, forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start)
Concrete trucks
Mid-level construction noise
Building Site
Mass Timber Delivery / Erection
Trucks, Boom Lift
110T Crane
Mid-level construction noise
Week of November 17, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
SOG Activities
Backhoe, forklift
Low-level and mid-level construction noise
Building Site
CIP wall construction
90T Crane, forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start)
Concrete trucks
Mid-level construction noise
Building Site
Mass Timber Delivery / Erection
Trucks, Boom Lift
110T Crane
Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park - Construction Progress Update #44
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (10/27/2025)
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
SOG Activities
Backhoe, forklift
Low-level and mid-level construction noise
Building Site
CIP wall construction
90T Crane, forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start)
Concrete trucks
Mid-level construction noise
Building Site
Dirt Stockpile Removal
Loader, Trucks
Mid-level construction noise
Week of November 3, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
SOG Activities
Backhoe, forklift
Low-level and mid-level construction noise
Building Site
CIP wall construction
90T Crane, forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start)
Concrete trucks
Mid-level construction noise
Building Site
Misc Steel
Boom Lift
Low-level and mid-level construction noise
Week of November 10, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
SOG Activities
Backhoe, forklift
Low-level and mid-level construction noise
Building Site
CIP wall construction
90T Crane, forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start)
Concrete trucks
Mid-level construction noise
Building Site
Mass Timber Delivery / Erection
Trucks, Boom Lift
110T Crane
Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #43
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (10/20/2025)
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
SOG Activities
Backhoe, forklift
Low-level and mid-level construction noise
Building Site
CIP wall construction
90T Crane, forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start)
Concrete trucks
Mid-level construction noise
Building Site
UG utility installation
Mini-Ex, dump truck
Low-level and mid-level construction noise
Week of October 27, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
SOG Activities
Backhoe, forklift
Low-level and mid-level construction noise
Building Site
CIP wall construction
90T Crane, forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start)
Concrete trucks
Mid-level construction noise
Building Site
Misc Steel
Boom Lift
Low-level and mid-level construction noise
Week of November 3, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
SOG Activities
Backhoe, forklift
Low-level and mid-level construction noise
Building Site
CIP wall construction
90T Crane, forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start)
Concrete trucks
Mid-level construction noise
Building Site
Misc. Steel
Boom Lift
Low-level and mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #42
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Look-Ahead (10/13/2025)
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
SOG Activities
Backhoe, forklift
Low-level and mid-level construction noise
Building Site
CIP wall construction
90T Crane, forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start)
Concrete trucks
Mid-level construction noise
Building Site
UG utility installation
Mini-Ex, dump truck
Low-level and mid-level construction noise
Week of October 20, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
SOG Activities
Backhoe, forklift
Low-level and mid-level construction noise
Building Site
CIP wall construction
90T Crane, forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start)
Concrete trucks
Mid-level construction noise
Building Site
UG utility installation
Mini-Ex, dump truck
Low-level and mid-level construction noise
Week of October 27, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
SOG Activities
Backhoe, forklift
Low-level and mid-level construction noise
Building Site
CIP wall construction
90T Crane, forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start)
Concrete trucks
Mid-level construction noise
Building Site
UG utility installation
Mini-Ex, dump truck
Low-level and mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #41
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 3 Week Look-Ahead (10/06/2025)
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
SOG Activities
Backhoe, forklift
Low-level and mid-level construction noise
Building Site
CIP wall construction
90T Crane, forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start)
Concrete trucks
Mid-level construction noise
Building Site
UG utility installation
Mini-Ex, dump truck
Low-level and mid-level construction noise
Week of October 13, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
SOG Activities
Backhoe, forklift
Low-level and mid-level construction noise
Building Site
CIP wall construction
90T Crane, forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start)
Concrete trucks
Mid-level construction noise
Building Site
UG utility installation
Mini-Ex, dump truck
Low-level and mid-level construction noise
Week of October 20, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
SOG Activities
Backhoe, forklift
Low-level and mid-level construction noise
Building Site
CIP wall construction
90T Crane, forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start)
Concrete trucks
Mid-level construction noise
Building Site
UG utility installation
Mini-Ex, dump truck
Low-level and mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #40
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 3 Week Look-Ahead (09/29/2025)
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
SOG Activities
Backhoe, forklift
Low-level and mid-level construction noise
Building Site
CIP wall construction
90T Crane, forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start)
Concrete trucks
Mid-level construction noise
Building Site
UG utility installation
Mini-Ex, dump truck
Low-level and mid-level construction noise
Week of October 6, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
SOG Activities
Backhoe, forklift
Low-level and mid-level construction noise
Building Site
CIP wall construction
90T Crane, forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start)
Concrete trucks
Mid-level construction noise
Building Site
UG utility installation
Mini-Ex, dump truck
Low-level and mid-level construction noise
Week of October 13, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
SOG Activities
Backhoe, forklift
Low-level and mid-level construction noise
Building Site
CIP wall construction
90T Crane, forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start)
Concrete trucks
Mid-level construction noise
Building Site
UG utility installation
Mini-Ex, dump truck
Low-level and mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #39
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 3 Week Look-Ahead (09/22/2025)
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
SOG Activities
Backhoe, forklift
Low-level and mid-level construction noise
Building Site
CIP wall construction
90T Crane, forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start)
Concrete trucks
Mid-level construction noise
Building Site
UG utility installation
Mini-Ex, dump truck
Low-level and mid-level construction noise
Week of September 29, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
SOG Activities
Backhoe, forklift
Low-level and mid-level construction noise
Building Site
CIP wall construction
90T Crane, forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start)
Concrete trucks
Mid-level construction noise
Building Site
UG utility installation
Mini-Ex, dump truck
Low-level and mid-level construction noise
Week of October 6, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
SOG Activities
Backhoe, forklift
Low-level and mid-level construction noise
Building Site
CIP wall construction
90T Crane, forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start)
Concrete trucks
Mid-level construction noise
Building Site
UG utility installation
Mini-Ex, dump truck
Low-level and mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #38
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 3 Week Look-Ahead (09/15/2025)
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
SOG MEP
Backhoe, forklift
Low-level and mid-level construction noise
Building Site
CIP wall construction
90T Crane, forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start)
Concrete trucks
Mid-level construction noise
Building Site
UG utility installation
Mini-Ex, dump truck
Low-level and mid-level construction noise
Week of September 22, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
SOG MEP
Backhoe, forklift
Low-level and mid-level construction noise
Building Site
CIP wall construction
90T Crane, forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start)
Concrete trucks
Mid-level construction noise
Building Site
UG utility installation
Mini-Ex, dump truck
Low-level and mid-level construction noise
Week of September 29, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
SOG MEP
Backhoe, forklift
Low-level and mid-level construction noise
Building Site
CIP wall construction
90T Crane, forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start)
Concrete trucks
Mid-level construction noise
Building Site
UG utility installation
Mini-Ex, dump truck
Low-level and mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #37
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 4 Week Visual Look-Ahead (09/8/2025)
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Footing construction
Backhoe, forklift
Low-level and mid-level construction noise
Building Site
CIP wall construction
90T Crane, forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start)
Concrete trucks
Mid-level construction noise
Building Site
UG Utility installation
Mini-Ex, dump truck
Low-level and mid-level construction noise
Week of September 15, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
SOG MEP UG
Backhoe
Low-level and mid-level construction noise
Building Site
CIP wall construction
90T Crane, forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start)
Concrete trucks
Mid-level construction noise
Building Site
UG Utility installation
Mini-Ex
Low-level and mid-level construction noise
Week of September 22, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
SOG MEP UG
Backhoe
Low-level and mid-level construction noise
Building Site
CIP wall construction
90T Crane, forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start)
Concrete trucks
Mid-level construction noise
Building Site
UG Utility installation
Mini-Ex
Low-level and mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #36
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 3 Week Look-Ahead (09/2/2025)
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Footing construction
Backhoe, forklift
Low-level and mid-level construction noise
Building Site
CIP wall construction
90T Crane, forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start)
Concrete trucks
Mid-level construction noise
Building Site
UG utility installation
Mini-Ex, dump truck
Low-level and mid-level construction noise
Week of September 8, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Foundation construction
Backhoe
Low-level and mid-level construction noise
Building Site
CIP wall construction
90T Crane, forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start)
Concrete trucks
Mid-level construction noise
Building Site
UG utility installation
Mini-Ex
Low-level and mid-level construction noise
Week of September 15, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Foundation construction
Backhoe
Low-level and mid-level construction noise
Building Site
CIP wall construction
90T Crane, forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (5AM Start)
Concrete trucks
Mid-level construction noise
Building Site
UG utility installation
Mini-Ex
Low-level and mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #36
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 3 Week Look-Ahead (08/25/2025)
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Construction trailer - HP & UCR move-in
Forklift
Low-level construction noise
Building Site
Footing construction
Backhoe, forklift
Low-level and mid-level construction noise
Building Site
Concrete Placement (8/28) - Start time= 5AM
Concrete trucks
Mid-level construction noise
Building Site
UG utility installation
Mini-Ex, dump truck
Low-level and mid-level construction noise
Week of September 2, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Foundation construction
Backhoe
Low-level and mid-level construction noise
Building Site
Concrete Placement (9/5) - Start time= 5AM
Concrete trucks
Mid-level construction noise
Building Site
Cast-in-Place wall construction
80 ton crane, forklift
Mid-level construction noise
Building Site
UG utility installation
Mini-Ex
Low-level and mid-level construction noise
Week of September 8, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Foundation construction
Backhoe, dump truck
Low-level and mid-level construction noise
Building Site
Cast-in-Place wall construction
80 ton crane, forklift
Mid-level construction noise
Building Site
Concrete Placement (9/11 & 9/12) - Start time= 5AM
Concrete trucks
Mid-level construction noise
Building Site
UG utility installation
Mini-Ex
Low-level and mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #35
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 3 Week Look-Ahead (08/18/2025)
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Construction trailer delivery & setup (including construction of deck/ramp/stairs)
Forklift
Low-level construction noise
Building Site
Footing construction
Backhoe, forklift
Low-level and mid-level construction noise
Building Site
UG utility installation
Mini-Ex, dump truck
Low-level and mid-level construction noise
Week of August 25, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Foundation construction
Backhoe
Low-level and mid-level construction noise
Building Site
Concrete Placement
Concrete trucks
Mid-level construction noise
Building Site
UG utility installation
Mini-Ex
Low-level and mid-level construction noise
Week of September 2, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Foundation construction
Backhoe, dump truck
Low-level and mid-level construction noise
Building Site
Cast-in-Place wall construction
80 ton crane, forklift
Mid-level construction noise
Building Site
UG utility installation
Mini-Ex
Low-level and mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #34
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 3 Week Look-Ahead (08/11/2025)
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Construction trailer delivery & setup (including construction of deck/ramp/stairs)
Forklift, semi-trucks
Low-level construction noise
Building Site
Footing construction
Backhoe, forklift
Low-level and mid-level construction noise
Building Site
UG utility installation
Mini-Ex, dump truck
Low-level and mid-level construction noise
Week of August 18, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Foundation construction
Backhoe
Low-level and mid-level construction noise
Building Site
Concrete Placement
Concrete trucks
Mid-level construction noise
Building Site
UG utility installation
Mini-Ex
Low-level and mid-level construction noise
Week of August 25, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Foundation construction
Backhoe, dump truck
Low-level and mid-level construction noise
Building Site
Cast-in-Place wall construction
80 ton crane, forklift
Mid-level construction noise
Building Site
UG utility installation
Mini-Ex
Low-level and mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #33
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 3 Week Look-Ahead (08/04/2025)
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Preparation for temporary power
Backhoe, roller
Low-level construction noise
Building Site
Construction trailer delivery & setup (including construction of deck/ramp/stairs)
Forklift, semi-trucks
Low-level construction noise
Building Site
Footing excavation
Backhoe
Low-level and mid-level construction noise
Week of August 11, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Foundation construction
Backhoe, dump truck
Low-level and mid-level construction noise
Building Site
UG utility installation
Mini-Ex
Low-level and mid-level construction noise
Week of August 18, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Foundation construction
Backhoe, dump truck
Low-level and mid-level construction noise
Building Site
UG utility installation
Mini-Ex
Low-level and mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 SoCal OASIS Park Construction Alert #32
SOCAL OASIS™ Park: 3 Week Look-Ahead (07/21/2025)
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Backfill of the temp & permanent power underground
Backhoe, roller
Low-level and mid-level construction noise
Building Site
Crushed base at trailer complex
Skip loader
Low-level construction noise
Week of August 04, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Construction trailer delivery & setup (including construction of deck/ramp/stairs)
Forklift, semi-trucks
Low-level construction noise
Week of August 11, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Foundation construction
Backhoe, dump truck
Low-level and mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #31
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 3 Week Look-Ahead (07/21/2025)
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Over excavation and re-compaction
Scrapers, bulldozer, skip loader, water truck
Low-level and mid-level construction noise
Building Site
Temp & permanent power underground
Backhoe
Low-level construction noise
Week of July 28, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Temp power setup
Forklift
Low-level construction noise
Week of August 4, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Construction trailer delivery & setup (including construction of deck/ramp/stairs)
Semi-truck
Low-level and mid-level construction noise
Building Site
Foundation construction
Backhoe, dump truck
Low-level and mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #30
UCR – SoCal OASIS™ Park: 3 Week Look-Ahead (07/07/2025)
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building SiteOver excavation and re-compactionBelly dumps, scrapers, bulldozers, water truckLow-level and mid-level construction noiseBuilding SiteUnderground pipe removalMini-excavatorLow-level construction noiseWeek of July 14, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building SiteOver excavation and re-compactionBelly dumps, scrapers, bulldozers, water truckMid-level construction noiseWeek of July 21, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building SiteOver excavation and re-compactionBelly dumps, scrapers, bulldozers, water truckMid-level construction noiseCurrent and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
-
950604 - SoCal OASIS™ Park – Construction Alert #29
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 3 Week Look-Ahead (06/30/2025)
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Over excavation and re-compaction
Belly dumps, scrapers, bulldozers, water truck
Mid-level construction noise
Week of July 7, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Over excavation and re-compaction
Belly dumps, scrapers, bulldozers, water truck
Mid-level construction noise
Week of July 14, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Over excavation and re-compaction
Belly dumps, scrapers, bulldozers, water truck
Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**July 4, 2025, the Project Site will be closed.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Alert #28
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
North Building- Processing & haul-off of demolition debris.
Generator, Excavator, Skid Steer
Low-level and mid-level construction noise
Building Site
Demobilization of demolition equipment
Generator, Excavator, Skid Steer
Low-level construction noise
Building Site
Over excavation and re-compaction
Belly dumps, scrapers, bulldozers, water truck
Low-level and mid-level construction noise
Week of June 30, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Over excavation and re-compaction
Belly dumps, scrapers, bulldozers, water truck
Mid-level construction noise
Week of June 28, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Over excavation and re-compaction
Belly dumps, scrapers, bulldozers, water truck
Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Alert #27
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
North Building- Processing & haul-off of demolition debris.
Generator, Excavator, Skid Steer
Low-level and mid-level construction noise
Building Site
East Building- demolition, processing & haul-off of slab-on-grade and foundations.
Generator, Excavator, Skid Steer
Low-level and mid-level construction noise
Building Site
Existing Site UG utility removal
Generator, Excavator, Skid Steer
Low-level and mid-level construction noise
Week of June 23, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
North Building- Processing & haul-off of demolition debris.
Generator, Excavator, Skid Steer
Low-level and mid-level construction noise
Building Site
Demobilization of demolition equipment
Generator, Excavator, Skid Steer
Low-level and mid-level construction noise
Building Site
Over excavation and re-compaction
Belly Dump, scrapers, bulldozers.
Mid-level construction noise
Week of June 28, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Over excavation and re-compaction
Belly Dump, scrapers, bulldozers.
Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Alert #26
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
North Building- Processing & haul-off of demolition debris.
Generator, Excavator, Skid Steer
Low-level and mid-level construction noise
Building Site
East Building- demolition, processing & haul-off of slab-on-grade and foundations.
Generator, Excavator, Skid Steer
Low-level and mid-level construction noise
Building Site
Site asphalt removal
Asphalt milling machine
Mid-level and high-level construction noise
Week of June 16, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
North Building- Slab-on-grade and foundation demolition
Generator, Excavator, Skid Steer
Mid-level and high-level construction noise
Building Site
North Building- Processing & haul-off of demolition debris.
Generator, Excavator, Skid Steer
Low-level and mid-level construction noise
Week of June 23, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
North Building- Slab-on-grade and foundation demolition
Generator, Excavator, Skid Steer
Mid-level and high-level construction noise
Building Site
Demobilization of demolition equipment
Generator, Excavators, Skid Steer
Low-level and mid-level construction noise
Building Site
Mobilization of earthwork equipment
Belly Dump, scrapers, bulldozers.
Low-level and mid-level construction noise
Building Site
Over excavation and re-compaction
Belly Dump, scrapers, bulldozers.
Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Alert #25
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
North Building- Processing & haul-off of demolition debris.
Generator, Excavator, Skid Steer
Low-level and mid-level construction noise
Week of June 9, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
North Building- Slab-on-grade and foundation demolition
Generator, Excavator, Skid Steer
Mid-level and high-level construction noise
Building Site
North Building- Processing & haul-off of demolition debris.
Generator, Excavator, Skid Steer
Low-level and mid-level construction noise
Building Site
Site asphalt removal
Asphalt milling machine
Mid-level and high-level construction noise
Week of June 16, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
North Building- Slab-on-grade and foundation demolition
Generator, Excavator, Skid Steer
Mid-level and high-level construction noise
Building Site
North Building- Processing & haul-off of demolition debris.
Generator, Excavator, Skid Steer
Low-level and mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Alert #24
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
North Building- Interior Soft Demolition and Abatement
Generator, forklift, Skid Steer,
Low-level Construction Noise
Building Site
East Building- Structure demolition, Processing & Haul-offExcavators
Mid-level and High-Level Construction NoiseWeek of May 12, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
North Building- Interior Soft Demolition and AbatementGenerator, forklift, skid steer
Low-level Construction Noise
Building SiteNorth Building- Structure DemolitionGenerator, forklift, skid steerMid-level and High-Level Construction NoiseBuilding Site
East Building- Foundation Demolition, Processing & Haul-off.
Excavators, Skid Steers
Mid-level and High-Level Construction Noise
Week of May 19, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
North Building- Interior Soft Demolition and Abatement
Generator, forklift, skid steer
Low-level Construction Noise
Building SiteNorth Building- Structure DemolitionGenerator, forklift, skid steerMid-level and High-Level Construction NoiseCurrent and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Alert #22
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
North / East Building- Interior Soft Demolition and Abatement
Generator, forklift, Skid Steer,
Low-level Construction Noise
Building Site
South Building- Foundation demolition, Processing, Haul-off & Backfill
Excavators
Mid-level and High-Level Construction Noise
Week of April 28, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
North Building- Interior Soft Demolition and Abatement
Generator, forklift, skid steer
Low-level Construction Noise
Building Site East Building- Structure Demolition
Excavators, Skid Steers
Mid-level and High-Level Construction Noise Week of May 5, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
North Building- Interior Soft Demolition and Abatement
Generator, forklift, skid steer
Low-level Construction Noise
Building Site East Building- Structure Demolition, Processing and Haul-off
Excavators, Skid Steers
Mid-level and High-Level Construction Noise Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Alert #21
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
North / East Building- Interior Soft Demolition and Abatement
Generator, forklift, Skid Steer,
Low-level Construction Noise
Building Site
South Building- Foundation demolition, Processing & Haul-off
Excavators
Mid-level and High-Level Construction Noise
Week of April 21, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
North / East Building- Interior Soft Demolition and Abatement
Generator, forklift, skid steer
Low-level Construction Noise
Building Site South Building- Foundation demolition, Processing & Haul-off
Excavators, Skid Steers
Mid-level and High-Level Construction Noise Week of April 28, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
North / East Building- Interior Soft Demolition and Abatement
Generator, forklift, skid steer
Low-level Construction Noise
Building Site East Building- Exterior Facade Demolition and Structure Demolition
Excavators, Skid Steers
Mid-level and High-Level Construction Noise Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park - Construction Alert #20
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
North / East Building- Interior Soft Demolition and Abatement
Generator, forklift, Skid Steer,
Low-level Construction Noise
Building Site
South Building- Foundation demolition, Processing & Haul-off
Excavators
Mid-level and High-Level Construction Noise
Week of April 14, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
North / East Building- Interior Soft Demolition and Abatement
Generator, forklift, skid steer
Low-level Construction Noise
Building Site South Building- Processing & Haul-off
Excavators, Skid Steers
Mid-level and High-Level Construction Noise Week of April 21, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
North / East Building- Interior Soft Demolition and Abatement
Generator, forklift, skid steer
Low-level Construction Noise
Building Site East Building- Preparation for structure demolition
Excavators, Skid Steers
Mid-level and High-Level Construction Noise Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Alert #19
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
North / East Building Interior Soft Demolition and Abatement
Generator, forklift, Skid Steer,
Low-level Construction Noise
Building Site
South Building Exterior Facade & Structure Demolition
High-reach Excavator
Mid-level and High-Level Construction Noise
Week of March 31, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
North / East Building Interior Soft Demolition and Abatement
Generator, forklift, skid steer
Low-level Construction Noise
Building Site South Building Structure Demolition and processing of demolished debris
High-reach Excavator, Skid Steers
Mid-level and High-Level Construction Noise Week of April 7, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
North / East Building Interior Soft Demolition and Abatement
Generator, forklift, skid steer
Low-level Construction Noise
Building Site South Building Structure Demolition and processing of demolished debris
High-reach Excavator, Skid Steers
Mid-level and High-Level Construction Noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 - SoCal OASIS Park Construction Progress Update #18
Please be advised that the following activities will be occurring during the weeks/dates noted below at the SoCal OASIS™ Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below:
UCR – SoCal OASIS™ Park: 3 Week Look-Ahead (03/17/2025)
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Fireproofing & Drywall Abatement
Soft Demolition Activities
Generator, forklift, Skid Steer,
Low-level Construction Noise
Building Site
South Building Exterior Facade Demolition
High-reach Excavator
Mid-level Construction Noise
Week of March 24, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Fireproofing & Drywall Abatement
Soft Demolition Activities
Generator, forklift, skid steer
Low-level Construction Noise
Building Site
South Building Exterior Facade Demolition & Structure Demolition
High-reach Excavator, Skid Steers
Mid-level and High-Level Construction Noise
Week of March 31, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Fireproofing & Drywall Abatement
Soft Demolition Activities
Generator, forklift, skid steer
Low-level Construction Noise
Building Site
South Building Structure Demolition
High-reach Excavator, Skid Steers
Mid-level and High-Level Construction Noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 - SoCal OASIS Park Construction Progress Update #17
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Fireproofing & Drywall Abatement
Soft Demolition Activities
Generator, forklift, Skid Steer
Low-level construction noise
Week of March 17, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Fireproofing & Drywall Abatement
Soft Demolition Activities
Generator, forklift, skid steer
Low-level construction noise
Week of March 24, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Fireproofing & Drywall Abatement
Soft Demolition Activities
Generator, forklift, skid steer
Low-level construction noise
Building Site Structure Demolition
Excavator, skid steers Medium/High-level construction noise Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 - SoCal OASIS Park Construction Progress Update #16
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Fireproofing & Drywall Abatement
Soft Demolition Activities
Generator, forklift, Skid Steer
Low-level construction noise
Week of March 10, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Fireproofing & Drywall Abatement
Soft Demolition Activities
Generator, forklift, skid steer
Low-level construction noise
Week of March 17, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Fireproofing & Drywall Abatement
Soft Demolition Activities
Generator, forklift, skid steer
Low-level construction noise
Building Site
Structure Demolition
Excavator, skid steers
Medium/High-level construction noise Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 - SoCal OASIS Park Construction Progress Update #15
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Fireproofing & Drywall Abatement
Soft Demolition Activities
Generator, forklift, Skid Steer
Low-level construction noise
Building Site
Re-mobilization of demolition equipment
Excavators, 53' transport trucks
Low/medium-level construction noise
Week of March 3, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Fireproofing & Drywall Abatement
Soft Demolition Activities
Generator, forklift, skid steer
Low-level construction noise
Week of March 10, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Fireproofing & Drywall Abatement
Soft Demolition Activities
Generator, forklift, skid steer
Low-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 - SoCal OASIS Park Construction Progress Update #14
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Mastic, fireproofing & PCB abatement
Generator, forklift
Low-level construction noise
Week of February 24, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Mastic, fireproofing & PCB abatement
Generator, forklift
Low-level construction noise
Building Site Re-mobilization of demolition crew
Generator, forklift Low-level construction noise
Week of March 3, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Mastic, fireproofing & PCB abatement
Generator, forklift
Low-level construction noise
Building Site Interior demolition activities
Generator, Skid steer, forklift
Mid-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 - SoCal OASIS Park Construction Progress Update #13
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
P5 Pre-Abatement clean-up (north building interiors)
Generator, forklift
Low-level construction noise
Building Site
Mastic & penetration abatement
Generator, forklift, floor buffer
Low-level construction noise
Week of February 17, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Interior soft demolition & remaining trash out of existing furniture
Generator, forklift
Low-level construction noise
Building Site PCB abatement & window removal
Generator, forklift Low-level construction noise Week of February 24, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
PCB abatement & window removal
Generator, forklift
Generator, forklift
Building Site Abatement containment setup
Generator, forklift Generator, forklift Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #12
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
P5 Pre-Abatement clean-up (north building interiors)
Generator, forklift
Low-level construction noise
Week of February 10, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
P5 Pre-Abatement clean-up (north building interiors)
Generator, forklift
Low-level construction noise
Building Site Start Contract Scope Abatement in South & East Buildings Generator, forklift & skid steer Low-level construction noise Week of February 17, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Contract Scope Abatement in South & East Buildings
Generator, forklift
Low-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 - SoCal OASIS Park Construction Progress Update #10
UCR – SoCal OASIS™ Park: 3 Week Look-Ahead (01/20/2025)
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
P5 Pre-Abatement clean-up (building interiors)
Generator, forklift
Low-level construction noise
Week of January 27, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
P5 Pre-Abatement clean-up (building interiors)
Generator, forklift
Low-level construction noise
Week of February 3, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
P5 Pre-Abatement clean-up (building interiors)
Generator, skid steer
Low-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 UCR SoCal OASIS™ Park – Construction Progress Update #8
UCR – SoCal OASIS™ Park: 3 Week Look-Ahead (01/06/2025)
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
P5 Pre-Abatement clean-up (building interiors)
Generator, forklift
Low-level construction noise
Week of January 13, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
P5 Pre-Abatement clean-up (building interiors)
Generator, forklift
Low-level construction noise
Week of January 20, 2025
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
P5 Pre-Abatement clean-up (building interiors)
Generator, skid steer
Low-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
The SoCal OASIS™ Park Construction Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood and parking at Lots 50 & 51. We thank you in advance for your patience during construction of this project.
-
950604 - SoCal OASIS™ Park Construction Alert #6
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
P5 Pre-Abatement clean-up (building interiors) – if approved by AQMD
Generator, skid steer
Low-level construction noise
Week of December 16, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
P5 Pre-Abatement clean-up (building interiors) - if approved by AQMD
Generator, skid steer
Low-level construction noise
Week of December 23, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
P5 Pre-Abatement clean-up (building interiors)
Generator, skid steer
Low-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact Daneca Stevens with any specific questions or concerns at daneca.stevens@ucr.edu
-
950604 - SoCal OASIS™ Park Construction Alert #5
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Demolition of parking structure on south side of site (adjacent to Everton Place)
High-level excavator, bobcats, dust boss
Medium/high-level Construction
noise
Building Site
Hauling of demolished material from parking structure
High-level excavator, bobcats, dust boss
Medium/high-level Construction
noise
Building Site
P5 Pre-Abatement clean-up (building interiors) – if approved by AQMD
Generator, skid steer
Low-level construction noise
Week of December 9, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
P5 Pre-Abatement clean-up (building interiors)
Generator, skid steer
Low-level construction noise
Week of December 16, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
P5 Pre-Abatement clean-up (building interiors)
Generator, skid steer
Low-level construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact Daneca Stevens with any specific questions or concerns at daneca.stevens@ucr.edu
-
950604 - SoCal OASIS™ Park Construction Alert #4
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Demolition of parking structure on south side of site (adjacent to Everton Place)
High-level excavator, bobcats, dust boss
Medium/high-level Construction
noise
Building Site
Hauling of demolished material from parking structure
High-level excavator, bobcats, dust boss
Medium/high-level Construction
noise
Building Site
11/28/24 – Thanksgiving – Jobsite Closed
N/A
N/A
Building Site
11/29/2024 – Jobsite Closed
N/A
N/A
Week of December 2, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Demolition of parking structure on south side of site (adjacent to Everton Place)
High-level excavator, bobcats, dust boss
Medium/high-level Construction
noise
Building Site
Hauling of demolished material from parking structure
High-level excavator, bobcats, dust boss
Medium/high-level Construction
noise
Week of December 9, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Building Site
Processing & haul off parking structure demolished materials
High-level excavator, bobcats, dust boss
Medium/high-level Construction noise
Building Site
P5 Pre-Abatement Prep & Cleanup
N/A
None
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact Daneca Stevens with any specific questions or concerns at daneca.stevens@ucr.edu
-
950604 - SoCal OASIS™ Park Construction Alert #3
Current week
Construction Activities
Location
Activity
Equipment
Used
Anticipated
Disturbance
Building Site
Demolition of parking structure on south side of site (adjacent to Everton Place)
High-level excavator, bobcats, dust boss
Medium/high-level Construction
noise
Building Site
Hauling of demolished material from parking structure
High-level excavator, bobcats, dust boss
Medium/high-level Construction
noise
Week of November 25, 2024
Construction Activities
Location
Activity
Equipment
Used
Anticipated
Disturbance
Building Site
Demolition of parking structure on south side of site (adjacent to Everton Place)
High-level excavator, bobcats, dust boss
Medium/high-level Construction
noise
Building Site
Hauling of demolished material from parking structure
High-level excavator, bobcats, dust boss
Medium/high-level Construction
noise
Week of December 2, 2024
Construction Activities
Location
Activity
Equipment
Used
Anticipated
Disturbance
Building Site
Processing & haul off parking structure demolished materials
High-level excavator, bobcats, dust boss
Medium/high-level Construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact Daneca Stevens with any specific questions or concerns at daneca.stevens@ucr.edu
-
950604 - SoCal OASIS™ Park Construction Alert #2
Construction Activities
Location
Activity
Equipment
Used
Anticipated
Disturbance
Building Site
Project Sign Installation
N/A
N/A
Building Site
Demolition of existing landscaping & trees (clear & grub)
High-level excavator, bobcat, hand tools
Medium-level Construction
noise
Building Site
Demolition of parking structure on south side of site (adjacent to Everton Place)
High-level excavator, bobcats, dust boss
Medium/high-level Construction
noise
Week of November 18, 2024
Construction Activities
Location
Activity
Equipment
Used
Anticipated
Disturbance
Building Site
Processing & haul off of parking structure demolished materials
High-level excavator, bobcat, hand tools
Medium-level Construction noise
Week of November 25, 2024
Construction Activities
Location
Activity
Equipment
Used
Anticipated
Disturbance
Building Site
Processing & haul off of parking structure demolished materials
High-level excavator, bobcats, dust boss
Medium/high-level Construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact Daneca Stevens with any specific questions or concerns at daneca.stevens@ucr.edu
-
950604 SoCal OASIS™ Park – Construction Alert #1
Please be advised that the following activities will be occurring during the weeks/dates noted below at the OASIS Park project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the Project Site as shown in the map below:
UCR – OASIS: 3 Week Look-ahead (11/04/2024)
Current week
Construction Activities
Location
Activity
Equipment
Used
Anticipated
Disturbance
Building Site
AQMD P-5 assessment
N/A
N/A
Building Site
Mobilization activities
Forklift
Low-level construction noise
Building Site
Demolition of existing landscaping & trees (clear & grub)
High-level excavator, bobcat, hand tools
Medium-level Construction
noise
Building Site
Demolition of parking structure on south side of site (adjacent to Everton Place)
High-level excavator, bobcats, dust boss
Medium/high-level Construction
noise
Week of November 11, 2024
Construction Activities
Location
Activity
Equipment
Used
Anticipated
Disturbance
Building Site
Demolition of existing landscaping & trees (clear & grub)
High-level excavator, bobcat, hand tools
Medium-level Construction noise
Building Site
Demolition of parking structure on south side of site (adjacent to Everton Place)
High-level excavator, bobcats, dust boss
Medium/high-level Construction noise
Week of November 18, 2024
Construction Activities
Location
Activity
Equipment
Used
Anticipated
Disturbance
Building Site
Demolition of parking structure on south side of site (adjacent to Everton Place)
High-level excavator, bobcats, dust boss
Medium/high-level Construction noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
**No upcoming or anticipated closures.
Please contact Daneca Stevens, Project Manager, with any specific questions or concerns at daneca.stevens@ucr.edu
Project Timeline:
Anticipated Start:
Notice to Proceed, Phase 1: Feb 2024
Construction Start:
October 2024
Anticipated Completion:
Spring 2027
PD&C Contact:
Project Manager: Jonathan Chung, PE
tel: (562) 298-6254
Project Planner: Stephanie Tang
tel: (951) 827-1484
Project Working Group:
Rosibel Ochoa, VCRED, Chair
David Dayton, UNEX
Don Collins, BCOE
Linda Walling, AS PRC
Matt Barth, BCOE
Nathaniel Gabor, CNAS
Nicole Cleary, VCRED
Project Basis of Design:
Miller Hull
Architect:
ZGF Architects
GC:
Hensel Phelps Construction, Co.