School of Business New Building
The new School of Business building complex will be a flagship facility, serving as the permanent home for the School. The building will complement the School of Business’ existing space program and fully address enrollment-driven needs in pursuit of their aspiration to become the premier center of management research and education in the Inland Empire.
Project Scope:
The proposed building will provide about 38,500 ASF within approximately to 63,400 GSF, along with exterior circulation and gathering areas. The program includes the following spaces:
- Classrooms and Educational Spaces
- Student Support Spaces
- Academic Offices and Support Spaces
- Administrative Offices and Support Spaces
- Shared Building Resources (Lobby, Multipurpose room(s) etc)
School of Business Project Updates
-
950592 UCR SBB - Construction Alert #54
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Punchlist Corrections
NA
NA
SBB (Lot 8) Concrete
Form Steps – Auditorium
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Vert L4N
NA
NA
SBB (Lot 8) Concrete
Close Two Side Forms – Vert L4N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour – Vert L4N
Concrete Pumps
Noise due to Equipment
SBB (Lot 8) Concrete
Rebar – Vert L4S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout & Install MEP’s – Vert L4S
NA
NA
SBB (Lot 8) Concrete
Set Embeds – Vert L4S
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Vert L4S
NA
NA
SBB (Lot 8)
Exterior Framing – L1
NA
NA
SBB (Lot 8)
Frame Interference Walls & Install Door Frames
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Wall
NA
NA
Week of November 27, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Concrete
QC / Inspection – SOG North Auditorium Steps
NA
NA
SBB (Lot 8) Concrete
Strip Walls & Columns – Vert L4N
NA
NA
SBB (Lot 8) Concrete
Close Two Side Forms - Vert L4S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour - Vert L4S
Concrete Pumps
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Walls & Columns – Vert L4S
Crane
Noise due to Equipment
SBB (Lot 8)
Exterior Framing – EXT-L1
NA
NA
SBB (Lot 8)
Frame Interference Walls and Install door Frames - INT-L1
NA
NA
SBB (Lot 8)
Install Early MEP to Support Top Down Drywall
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Wall
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Slab
NA
NA
Week of December 4, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Concrete
Pour Auditorium Steps – SOG1
Concrete Pumps
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Edge Form / Bulkhead – SOG North – Auditorium Steps
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Strip & Re-Shore – Deck L4S
NA
NA
SBB (Lot 8) Concrete
Edge Form – Deck L5 Roof
NA
NA
SBB (Lot 8)
Install Early MEP to support Top Down Drywall
NA
NA
SBB (Lot 8)
Hang 1st Side Top Down Drywall – INT L1
NA
NA
SBB (Lot 8)
Install Insulation and Inspect – INT L1
NA
NA
SBB (Lot 8)
F/R/P Transformer Yard Slab
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #53
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Punchlist Corrections
NA
NA
SBB (Lot 8) Concrete
Edge Form / Bulkhead - SOG North - Auditorium Steps
NA
NA
SBB (Lot 8) Concrete
Rebar - SOG North - Auditorium Steps
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Underslab Electrical Rough-in - SOG North - Auditorium Steps
NA
NA
SBB (Lot 8) Concrete
Underslab Fire Sprinkler Riser - SOG North
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Deck L4S
NA
NA
SBB (Lot 8) Concrete
Pour – Deck L4S
Concrete Pumps
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Edge Form & Transfer Beams – Deck L4S
NA
NA
SBB (Lot 8) Concrete
Stress Transfer Beams – Deck L4S
NA
NA
SBB (Lot 8) Concrete
Layout Walls & Columns -Vert L4N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
One Side Form Walls & Columns -Vert L4N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Rebar -Vert L4N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout & Install MEP's -Vert L4N
NA
NA
SBB (Lot 8) Concrete
Set Embeds -Vert L4N
NA
NA
SBB (Lot 8) Concrete
Layout Walls & Columns – Vert L4S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
F/R/P Transformer Yard Wall
NA
NA
Week of November 20, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Building Complete
NA
NA
SBB (Lot 8) Concrete
Form Steps – Auditorium
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Vert L4N
NA
NA
SBB (Lot 8) Concrete
Close Two Side Forms – Vert L4N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour – Vert L4N
Concrete Pumps
Noise due to Equipment
SBB (Lot 8) Concrete
Rebar – Vert L4S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout & Install MEP’s – Vert L4S
NA
NA
SBB (Lot 8) Concrete
Set Embeds – Vert L4S
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Vert L4S
NA
NA
SBB (Lot 8)
Exterior Framing – L1
NA
NA
SBB (Lot 8)
Frame Interference Walls & Install Door Frames
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Wall
NA
NA
Week of November 27, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Concrete
QC / Inspection – SOG North Auditorium Steps
NA
NA
SBB (Lot 8) Concrete
Strip Walls & Columns – Vert L4N
NA
NA
SBB (Lot 8) Concrete
Close Two Side Forms - Vert L4S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour - Vert L4S
Concrete Pumps
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Walls & Columns – Vert L4S
Crane
Noise due to Equipment
SBB (Lot 8)
Exterior Framing – EXT-L1
NA
NA
SBB (Lot 8)
Frame Interference Walls and Install door Frames - INT-L1
NA
NA
SBB (Lot 8)
Install Early MEP to Support Top Down Drywall
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Wall
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Slab
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #52
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Develop punch list
NA
NA
BIO
Startup and Test Fire Alarm System
NA
NA
BIO
Startup and Test Lighting
NA
NA
BIO
Startup and Test mechanical / Control Systems
NA
NA
BIO
Startup and Test Walk-in Cooler
NA
NA
BIO
Punchlist Corrections
NA
NA
SBB (Lot 8) Concrete
Rebar / PT Cables
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Electrical Rough-in
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Footings
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Walls
NA
NA
SBB (Lot 8) Concrete
Install Water Line – Campus Dr POC to SBB POC
NA
NA
SBB (Lot 8) Concrete
Rebar / PT Cables
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Electrical Rough-in
NA
NA
SBB (Lot 8) Concrete
Deck Depressions
NA
NA
SBB (Lot 8) Util
Shutdown and Tie-in Water Line to Pump House
NA
NA
Week of November 13, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Punchlist Corrections
NA
NA
SBB (Lot 8) Concrete
Edge Form / Bulkhead - SOG North - Auditorium Steps
NA
NA
SBB (Lot 8) Concrete
Rebar - SOG North - Auditorium Steps
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Underslab Electrical Rough-in - SOG North - Auditorium Steps
NA
NA
SBB (Lot 8) Concrete
Underslab Fire Sprinkler Riser - SOG North
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Deck L4S
NA
NA
SBB (Lot 8) Concrete
Pour – Deck L4S
Concrete Pumps
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Edge Form & Transfer Beams – Deck L4S
NA
NA
SBB (Lot 8) Concrete
Stress Transfer Beams – Deck L4S
NA
NA
SBB (Lot 8) Concrete
Layout Walls & Columns -Vert L4N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
One Side Form Walls & Columns -Vert L4N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Rebar -Vert L4N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout & Install MEP's -Vert L4N
NA
NA
SBB (Lot 8) Concrete
Set Embeds -Vert L4N
NA
NA
SBB (Lot 8) Concrete
Layout Walls & Columns – Vert L4S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
F/R/P Transformer Yard Wall
NA
NA
Week of November 20, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Building Complete
NA
NA
SBB (Lot 8) Concrete
Form Steps – Auditorium
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Vert L4N
NA
NA
SBB (Lot 8) Concrete
Close Two Side Forms – Vert L4N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour – Vert L4N
Concrete Pumps
Noise due to Equipment
SBB (Lot 8) Concrete
Rebar – Vert L4S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout & Install MEP’s – Vert L4S
NA
NA
SBB (Lot 8) Concrete
Set Embeds – Vert L4S
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Vert L4S
NA
NA
SBB (Lot 8)
Exterior Framing – L1
NA
NA
SBB (Lot 8)
Frame Interference Walls & Install Door Frames
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Wall
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #51
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Final Clean
NA
NA
BIO
Start-up & Test Mechanical / Controls System
NA
NA
BIO
Start-up & Test Fire Alarm Systems
NA
NA
BIO
Start-up & Test Lighting
NA
NA
BIO
Start-up & Test Plumbing
NA
NA
BIO
Start-up & Test Card Reader
NA
NA
SBB (Lot 8) Concrete
Strip and Re-Shore – Deck L3N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour – Vert L3S
Concrete Pump
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Walls & Columns – Vert L3S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Install Water Line – Campus Dr POC to SBB POC
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Footings
NA
NA
SBB (Lot 8) Concrete
F/R/P Walls at Transformer Yard
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Slab
NA
NA
SBB (Lot 8) Concrete
Form Deck – Deck L4S
NA
NA
SBB (Lot 8) Concrete
Edge Form – Deck L4S
NA
NA
SBB (Lot 8) Concrete
Install Embeds – Deck L4S
NA
NA
SBB (Lot 8) Concrete
MEP Sleeves and Insert – Deck L4S
NA
NA
Week of November 6, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Develop punch list
NA
NA
BIO
Startup and Test Fire Alarm System
NA
NA
BIO
Startup and Test Lighting
NA
NA
BIO
Startup and Test mechanical / Control Systems
NA
NA
BIO
Startup and Test Walk-in Cooler
NA
NA
BIO
Punchlist Corrections
NA
NA
SBB (Lot 8) Concrete
Rebar / PT Cables
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Electrical Rough-in
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Footings
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Walls
NA
NA
SBB (Lot 8) Concrete
Install Water Line – Campus Dr POC to SBB POC
NA
NA
SBB (Lot 8) Concrete
Rebar / PT Cables
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Electrical Rough-in
NA
NA
SBB (Lot 8) Concrete
Deck Depressions
NA
NA
SBB (Lot 8) Util
Shutdown and Tie-in Water Line to Pump House
NA
NA
Week of November 13, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Punchlist Corrections
NA
NA
SBB (Lot 8) Concrete
Edge Form / Bulkhead - SOG North - Auditorium Steps
NA
NA
SBB (Lot 8) Concrete
Rebar - SOG North - Auditorium Steps
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Underslab Electrical Rough-in - SOG North - Auditorium Steps
NA
NA
SBB (Lot 8) Concrete
Underslab Fire Sprinkler Riser - SOG North
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Deck L4S
NA
NA
SBB (Lot 8) Concrete
Pour – Deck L4S
NA
NA
SBB (Lot 8) Concrete
Strip Edge Form & Transfer Beams – Deck L4S
NA
NA
SBB (Lot 8) Concrete
Stress Transfer Beams – Deck L4S
NA
NA
SBB (Lot 8) Concrete
Layout Walls & Columns -Vert L4N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
One Side Form Walls & Columns -Vert L4N
NA
NA
SBB (Lot 8) Concrete
Rebar -Vert L4N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout & Install MEP's -Vert L4N
NA
NA
SBB (Lot 8) Concrete
Set Embeds -Vert L4N
NA
NA
SBB (Lot 8) Concrete
Layout Walls & Columns – Vert L4S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
F/R/P Transformer Yard Wall
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #50
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Landscape and Irrigation
Mini-excavator
Noise due to Equipment
BIO
Install Bio-Filtration Planter
Mini-excavator
Noise due to Equipment
BIO
Start-up & Test Walk-in Cooler
NA
NA
BIO
New Water Line to Pump House / POC’s
NA
NA
BIO
Shutdown and Tie-in Water Line to Pump House
NA
NA
SBB (Lot 8) Concrete
Pour – Vert L3N
Concrete Pump
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Walls & Columns – Vert L3N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Stress Transfer Beams – Deck L3S
NA
NA
SBB (Lot 8) Concrete
Layout & Install MEPs – Vert L3S
NA
NA
SBB (Lot 8) Concrete
Set Embeds – Vert L3S
NA
NA
SBB (Lot 8) Concrete
QC/Inspection – Vert L3S
NA
NA
SBB (Lot 8) Concrete
Close Two Side Forms – Vert L3S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Form Deck – L4S
NA
NA
Week of October 30, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Start-up & Test Mechanical / Controls System
NA
NA
BIO
Start-up & Test Fire Alarm Systems
NA
NA
BIO
Start-up & Test Lighting
NA
NA
SBB (Lot 8) Concrete
Strip and Re-Shore – Deck L3N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour – Vert L3S
Concrete Pump
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Walls & Columns – Vert L3S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Install Water Line – Campus Dr POC to SBB POC
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Footings
NA
NA
SBB (Lot 8) Concrete
F/R/P Walls at Transformer Yard
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Slab
NA
NA
Week of November 6, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Develop punch list
NA
NA
BIO
Startup and Test Fire Alarm System
NA
NA
BIO
Startup and Test Lighting
NA
NA
SBB (Lot 8) Concrete
Rebar / PT Cables
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Electrical Rough-in
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Footings
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Walls
NA
NA
SBB (Lot 8) Concrete
Install Water Line – Campus Dr POC to SBB POC
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #49
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Install HVAC Trim
NA
NA
BIO
Install Fire Alarm Devices and Trim
NA
NA
BIO
Install Light Fixtures
NA
NA
BIO
Install Site Furnishings
NA
NA
BIO
Landscape and Irrigation
Mini-excavator
Noise due to Equipment
BIO
Install Bio-Filtration Planter
Mini-excavator
Noise due to Equipment
BIO
MEPT Startup and Testing
NA
NA
BIO
Install Walk-in Cooler
NA
NA
SBB (Lot 8) Concrete
Stress Transfer Beams – Deck L3N
NA
NA
SBB (Lot 8) Concrete
Rebar – Vert L3N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout & Install MEP’s – Vert L3N
NA
NA
SBB (Lot 8) Concrete
Set Embeds – Vert L3N
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Vert L3N
NA
NA
SBB (Lot 8) Concrete
Close two side Forms – Vert L3N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Deck Depressions – Deck L3S
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Deck L3S
NA
NA
SBB (Lot 8) Concrete
Pour – Deck L3S
Concrete Pumps
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Edge Form – Deck L3S
NA
NA
Week of October 23, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Landscape and Irrigation
Mini-excavator
Noise due to Equipment
BIO
Install Bio-Filtration Planter
Mini-excavator
Noise due to Equipment
BIO
Start-up & Test Walk-in Cooler
NA
NA
BIO
New Water Line to Pump House / POC’s
NA
NA
BIO
Shutdown and Tie-in Water Line to Pump House
NA
NA
SBB (Lot 8) Concrete
Pour – Vert L3N
Concrete Pump
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Walls & Columns – Vert L3N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Stress Transfer Beams – Deck L3S
NA
NA
SBB (Lot 8) Concrete
Layout & Install MEPs – Vert L3S
NA
NA
SBB (Lot 8) Concrete
Set Embeds – Vert L3S
NA
NA
SBB (Lot 8) Concrete
QC/Inspection – Vert L3S
NA
NA
SBB (Lot 8) Concrete
Close Two Side Forms – Vert L3S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Form Deck – L4S
NA
NA
Week of October 30, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Start-up & Test Mechanical / Controls System
NA
NA
BIO
Start-up & Test Fire Alarm Systems
NA
NA
BIO
Start-up & Test Lighting
NA
NA
SBB (Lot 8) Concrete
Strip and Re-Shore – Deck L3N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour – Vert L3S
Concrete Pump
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Walls & Columns – Vert L3S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Install Water Line – Campus Dr POC to SBB POC
NA
NA
SBB (Lot 8) Concrete
F/R/P Walls at Transformer Yard
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Slab
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #48
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Parapet Coping / Flashing / Louvers
NA
NA
BIO
Pull Wire from transformer to Panels
NA
NA
BIO
Hook-up and Terminate Transformer
NA
NA
BIO
Hook-up and Terminate Condensing Units
NA
NA
BIO
Install Walk-in Cooler
NA
NA
BIO
Install Casework
NA
NA
BIO
Install Plumbing Fixtures
NA
NA
SBB (Lot 8) Concrete
Deck Depressions – Deck L3N
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Deck L3N
NA
NA
SBB (Lot 8) Concrete
Pour – Deck L3N
Concrete Pumps
Noise Due to Equipment
SBB (Lot 8) Concrete
Strip Edge Form and Transfer Beams – Deck L3N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Cure for Stress – Deck L3N
NA
NA
SBB (Lot 8) Concrete
Install Embeds – Deck L3S
NA
NA
SBB (Lot 8) Concrete
MEP Sleeves and Inserts – Deck L3S
NA
NA
SBB (Lot 8) Concrete
Layout Walls and Columns – Vert L3N
NA
NA
SBB (Lot 8) Concrete
One Side Form Walls and Columns – Vert L3N
NA
NA
SBB (Lot 8) Concrete
Rebar / PT Cables – Deck L3S
Crane
Noise due to Equipment
Week of October 16, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Install HVAC Trim
NA
NA
BIO
Install Fire Alarm Devices and Trim
NA
NA
BIO
Install Light Fixtures
NA
NA
BIO
Install Site Furnishings
NA
NA
BIO
Landscape and Irrigation
Mini-excavator
Noise due to Equipment
BIO
Install Bio-Filtration Planter
Mini-excavator
Noise due to Equipment
BIO
MEPT Startup and Testing
NA
NA
BIO
Install Walk-in Cooler
NA
NA
SBB (Lot 8) Concrete
Stress Transfer Beams – Deck L3N
NA
NA
SBB (Lot 8) Concrete
Rebar – Vert L3N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout & Install MEP’s – Vert L3N
NA
NA
SBB (Lot 8) Concrete
Set Embeds – Vert L3N
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Vert L3N
NA
NA
SBB (Lot 8) Concrete
Close two side Forms – Vert L3N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Deck Depressions – Deck L3S
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Deck L3S
NA
NA
SBB (Lot 8) Concrete
Pour – Deck L3S
Concrete Pumps
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Edge Form – Deck L3S
NA
NA
Week of October 23, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Landscape and Irrigation
Mini-excavator
Noise due to Equipment
BIO
Install Bio-Filtration Planter
Mini-excavator
Noise due to Equipment
BIO
Start-up & Test Walk-in Cooler
NA
NA
BIO
New Water Line to Pump House / POC’s
NA
NA
BIO
Shutdown and Tie-in Water Line to Pump House
NA
NA
SBB (Lot 8) Concrete
Pour – Vert L3N
Concrete Pump
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Walls & Columns – Vert L3N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Stress Transfer Beams – Deck L3S
NA
NA
SBB (Lot 8) Concrete
Layout & Install MEPs – Vert L3S
NA
NA
SBB (Lot 8) Concrete
Set Embeds – Vert L3S
NA
NA
SBB (Lot 8) Concrete
QC/Inspection – Vert L3S
NA
NA
SBB (Lot 8) Concrete
Close Two Side Forms – Vert L3S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Form Deck – L4S
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #47
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
H/T/F Drywall
NA
NA
BIO
Set Transformer
NA
NA
BIO
Set Condensing Units
NA
NA
BIO
Hook-up and Terminate Transformer
NA
NA
BIO
Hook-up and Terminate Condensing Units
NA
NA
SBB (Lot 8) Concrete
Install Embed – Deck L3N
NA
NA
SBB (Lot 8) Concrete
MEP Sleeves and Inserts - Deck L3N
NA
NA
SBB (Lot 8) Concrete
Rebar / PT Cables - Deck L3N
NA
NA
SBB (Lot 8) Concrete
Electrical Rough-in - Deck L3N
NA
NA
SBB (Lot 8) Concrete
Form Deck - Deck L3S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Edge Form - Deck L3S
NA
NA
SBB (Lot 8)
F/R/P Manlift Pad
NA
NA
SBB (Lot 8)
Storm drain
Backhoe
Noise due to equipment
Week of October 9, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Parapet Coping / Flashing / Louvers
NA
NA
BIO
Pull Wire from transformer to Panels
NA
NA
BIO
Hook-up and Terminate Transformer
NA
NA
BIO
Hook-up and Terminate Condensing Units
NA
NA
SBB (Lot 8) Concrete
Deck Depressions – Deck L3N
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Deck L3N
NA
NA
SBB (Lot 8) Concrete
Pour – Deck L3N
Concrete Pumps
Noise Due to Equipment
SBB (Lot 8) Concrete
Strip Edge Form and Transfer Beams – Deck L3N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Cure for Stress – Deck L3N
NA
NA
SBB (Lot 8) Concrete
Install Embeds – Deck L3S
NA
NA
SBB (Lot 8) Concrete
MEP Sleeves and Inserts – Deck L3S
NA
NA
SBB (Lot 8) Concrete
Layout Walls and Columns – Vert L3N
NA
NA
SBB (Lot 8) Concrete
One Side Form Walls and Columns – Vert L3N
NA
NA
SBB (Lot 8) Concrete
Rebar / PT Cables – Deck L3S
Crane
Noise due to Equipment
Week of October 16, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Install HVAC Trim
NA
NA
BIO
Install Fire Alarm Devices and Trim
NA
NA
BIO
Install Light Fixtures
NA
NA
BIO
Install Site Furnishings
NA
NA
BIO
Landscape and Irrigation
NA
NA
BIO
Install Bio-Filtration Planter
NA
NA
BIO
MEPT Startup and Testing
NA
NA
SBB (Lot 8) Concrete
Stress Transfer Beams – Deck L3N
NA
NA
SBB (Lot 8) Concrete
Rebar – Vert L3N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout & Install MEP’s – Vert L3N
NA
NA
SBB (Lot 8) Concrete
Set Embeds – Vert L3N
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Vert L3N
NA
NA
SBB (Lot 8) Concrete
Close two side Forms – Vert L3N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Deck Depressions – Deck L3S
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Deck L3S
NA
NA
SBB (Lot 8) Concrete
Pour – Deck L3S
Concrete Pumps
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Edge Form – Deck L3S
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #46
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
In-Wall & Overhead Electrical Rough-in
NA
NA
BIO
Pull Electrical and Low Voltage Wire
NA
NA
BIO
Fine Grade for Finish Site Work
Heavy Equipment
Noise due to Equipment
BIO
F/R/P Equipment Pads
NA
NA
BIO
F/R/P New Flatwork to Tie Into Existing
NA
NA
SBB (Lot 8) Concrete
Strip Walls and Columns – Vertical L2N
NA
NA
SBB (Lot 8) Concrete
Set Embeds - Vertical L2S
NA
NA
SBB (Lot 8) Concrete
QC Inspection - Vertical L2S
NA
NA
SBB (Lot 8) Concrete
Close two side forms - Vertical L2S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour - Vertical L2S
Concrete Pump
Noise due to Equipment
SBB (Lot 8) Concrete
Strip walls & Columns - Vertical L2S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Form Deck – Deck L3N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Edge Form – Deck L3N
NA
NA
Week of October 2, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
H/T/F Drywall
NA
NA
BIO
Set Transformer
NA
NA
BIO
Set Condensing Units
NA
NA
BIO
Hook-up and Terminate Transformer
NA
NA
BIO
Hook-up and Terminate Condensing Units
NA
NA
SBB (Lot 8) Concrete
Install Embed – Deck L3N
NA
NA
SBB (Lot 8) Concrete
MEP Sleeves and Inserts - Deck L3N
NA
NA
SBB (Lot 8) Concrete
Rebar / PT Cables - Deck L3N
NA
NA
SBB (Lot 8) Concrete
Electrical Rough-in - Deck L3N
NA
NA
SBB (Lot 8) Concrete
Form Deck - Deck L3S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Edge Form - Deck L3S
NA
NA
SBB (Lot 8)
F/R/P Manlift Pad
NA
NA
Week of October 9, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Parapet Coping / Flashing / Louvers
NA
NA
BIO
Pull Wire from transformer to Panels
NA
NA
BIO
Hook-up and Terminate Transformer
NA
NA
BIO
Hook-up and Terminate Condensing Units
NA
NA
SBB (Lot 8) Concrete
Deck Depressions – Deck L3N
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Deck L3N
NA
NA
SBB (Lot 8) Concrete
Pour – Deck L3N
Concrete Pumps
Noise Due to Equipment
SBB (Lot 8) Concrete
Strip Edge Form and Transfer Beams – Deck L3N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Cure for Stress – Deck L3N
NA
NA
SBB (Lot 8) Concrete
Instll Embeds – Deck L3S
NA
NA
SBB (Lot 8) Concrete
MEP Sleeves and Inserts – Deck L3S
NA
NA
SBB (Lot 8) Concrete
Rebar / PT Cables – Deck L3S
Crane
Noise due to Equipment
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #45
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Parapet Coping/Flashing/Louvers
NA
NA
BIO
Downspouts
NA
NA
BIO
In-Wall and overhead plumbing work
NA
NA
BIO
Set fan coil units
NA
NA
SBB (Lot 8) Concrete
Strip & Re-Shore – Deck L2N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout and Install MEP’s – Vertical L2N
NA
NA
SBB (Lot 8) Concrete
Set Embeds – Vertical L2N
NA
NA
SBB (Lot 8) Concrete
QC / Inspection– Vertical L2N
NA
NA
SBB (Lot 8) Concrete
Close Two Side Forms– Vertical L2N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour– Vertical L2N
Concrete Pumps
Noise due to equipment
SBB (Lot 8) Concrete
Pour – Deck L2S
Concrete Pumps
Noise due to equipment
SBB (Lot 8) Concrete
Strip Edge Form – Deck L2S
NA
NA
SBB (Lot 8) Concrete
Stress Transfer Beams– Deck L2S
NA
NA
SBB (Lot 8) Concrete
Layout Walls and Columns – Vert L2S
NA
NA
SBB (Lot 8) Concrete
One side form walls and columns – Vert L2S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Rebar – Vert L2S
NA
NA
SBB (Lot 8) Concrete
Layout and Install MEP’s – Vert L2S
NA
NA
Week of September 25, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
In-Wall & Overhead Electrical Rough-in
NA
NA
BIO
Pull Electrical and Low Voltage Wire
NA
NA
BIO
Fine Grade for Finish Site Work
Heavy Equipment
Noise due to Equipment
BIO
F/R/P Equipment Pads
NA
NA
BIO
F/R/P New Flatwork to Tie Into Existing
NA
NA
SBB (Lot 8) Concrete
Strip Walls and Columns – Vertical L2N
NA
NA
SBB (Lot 8) Concrete
Set Embeds - Vertical L2S
NA
NA
SBB (Lot 8) Concrete
QC Inspection - Vertical L2S
NA
NA
SBB (Lot 8) Concrete
Close two side forms - Vertical L2S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour - Vertical L2S
Concrete Pump
Noise due to Equipment
SBB (Lot 8) Concrete
Strip walls & Columns - Vertical L2S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Form Deck – Deck L3N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Edge Form – Deck L3N
NA
NA
Week of October 2, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
H/T/F Drywall
NA
NA
BIO
Set Transformer
NA
NA
BIO
Set Condensing Units
NA
NA
BIO
Hook-up and Terminate Transformer
NA
NA
BIO
Hook-up and Terminate Condensing Units
NA
NA
SBB (Lot 8) Concrete
Install Embed – Deck L3N
NA
NA
SBB (Lot 8) Concrete
MEP Sleeves and Inserts - Deck L3N
NA
NA
SBB (Lot 8) Concrete
Rebar / PT Cables - Deck L3N
NA
NA
SBB (Lot 8) Concrete
Electrical Rough-in - Deck L3N
NA
NA
SBB (Lot 8) Concrete
Form Deck - Deck L3S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Edge Form - Deck L3S
NA
NA
SBB (Lot 8)
F/R/P Manlift Pad
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #44
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Install Metal Decking
Gradall
Noise due to equipment
BIO
Framing and Insulation
Gradall
Noise due to equipment
SBB (Lot 8) Concrete
Deck Pour – L2N
Concrete Pumps
Noise due to equipment
SBB (Lot 8) Concrete
Strip Edge Form – L2N
NA
NA
SBB (Lot 8) Concrete
Layout Walls and Columns – L2N
NA
NA
SBB (Lot 8) Concrete
Rebar – L2N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout and Install MEPs – L2N
NA
NA
SBB (Lot 8) Concrete
Set Embeds – L2N
NA
NA
SBB (Lot 8) Concrete
Electrical Rough-in – L2S
NA
NA
SBB (Lot 8) Concrete
Deck Pour – L2S
Concrete Pumps
Noise due to equipment
SBB (Lot 8) Concrete
Deck Depressions – L2S
NA
NA
SBB (Lot 8) Concrete
Install Embeds – L2S
N/A
N/A
SBB (Lot 8) Concrete
Install Embeds – L2S
N/A
N/A
SBB (Lot 8) Concrete
Rebar / PT Cables – L2S
Crane
Noise due to Equipment
Week of September 18, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Parapet Coping/Flashing/Louvers
NA
NA
BIO
Downspouts
NA
NA
BIO
In-Wall and overhead plumbing work
NA
NA
BIO
Set fan coil units
NA
NA
SBB (Lot 8) Concrete
Strip & Re-Shore – Deck L2N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout and Install MEP’s – Vertical L2N
NA
NA
SBB (Lot 8) Concrete
Set Embeds – Vertical L2N
NA
NA
SBB (Lot 8) Concrete
QC / Inspection– Vertical L2N
NA
NA
SBB (Lot 8) Concrete
Close Two Side Forms– Vertical L2N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour– Vertical L2N
Concrete Pumps
Noise due to equipment
SBB (Lot 8) Concrete
Pour – Deck L2S
Concrete Pumps
Noise due to equipment
SBB (Lot 8) Concrete
Strip Edge Form – Deck L2S
NA
NA
SBB (Lot 8) Concrete
Stress Transfer Beams– Deck L2S
NA
NA
SBB (Lot 8) Concrete
Layout Walls and Columns – Vert L2S
NA
NA
SBB (Lot 8) Concrete
One side form walls and columns – Vert L2S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Rebar – Vert L2S
NA
NA
SBB (Lot 8) Concrete
Layout and Install MEP’s – Vert L2S
NA
NA
Week of September 25, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
In-Wall & Overhead Electrical Rough-in
NA
NA
BIO
Pull Electrical and Low Voltage Wire
NA
NA
BIO
Fine Grade for Finish Site Work
Heavy Equipment
Noise due to Equipment
BIO
F/R/P Equipment Pads
NA
NA
BIO
F/R/P New Flatwork to Tie Into Existing
NA
NA
SBB (Lot 8) Concrete
Strip Walls and Columns – Vertical L2N
NA
NA
SBB (Lot 8) Concrete
Set Embeds - Vertical L2S
NA
NA
SBB (Lot 8) Concrete
QC Inspection - Vertical L2S
NA
NA
SBB (Lot 8) Concrete
Close two side forms - Vertical L2S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour - Vertical L2S
Concrete Pump
Noise due to Equipment
SBB (Lot 8) Concrete
Strip walls & Columns - Vertical L2S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Form Deck – Deck L3N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Edge Form – Deck L3N
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #43
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Concrete
Pour SOG
Concrete Pump
Noise due to Equipment
BIO
Backfill
Mini-Excavator
Noise due to Equipment
BIO
Erect Steel Roof Structure
N/A
N/A
SBB (Lot 8) Concrete
MEP Sleeves and Inserts – L2N
N/A
N/A
SBB (Lot 8) Concrete
Rebar / PT Cables – L2N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Electrical Rough-in – L2N
N/A
N/A
SBB (Lot 8) Concrete
Deck Depressions – L2N
N/A
N/A
SBB (Lot 8) Concrete
Edge Form – L2S
N/A
N/A
SBB (Lot 8) Concrete
QC / Inspection – L2N
N/A
N/A
SBB (Lot 8) Concrete
Edge Form L2S
N/A
N/A
SBB (Lot 8) Concrete
Install Embeds – L2S
N/A
N/A
SBB (Lot 8) Concrete
MEP Sleeves and Inserts – L2S
N/A
N/A
SBB (Lot 8) Concrete
Rebar / PT Cables – L2S
Crane
Noise due to Equipment
Week of September 11, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Install Metal Decking
Gradall
Noise due to equipment
SBB (Lot 8) Concrete
Deck Pour – L2N
Concrete Pumps
Noise due to equipment
SBB (Lot 8) Concrete
Strip Edge Form – L2N
NA
NA
SBB (Lot 8) Concrete
Layout Walls and Columns – L2N
NA
NA
SBB (Lot 8) Concrete
Rebar – L2N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout and Install MEPs – L2N
NA
NA
SBB (Lot 8) Concrete
Set Embeds – L2N
NA
NA
SBB (Lot 8) Concrete
Electrical Rough-in – L2S
NA
NA
SBB (Lot 8) Concrete
Deck Pour – L2S
Concrete Pumps
Noise due to equipment
SBB (Lot 8) Concrete
Deck Depressions – L2S
NA
NA
Week of September 18, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Install Door Frames
NA
NA
BIO
Install Doors and Hardware
NA
NA
BIO
Install Roofing System
Gradall
Noise due to equipment
BIO
Install Electrical Panels
NA
NA
SBB (Lot 8) Concrete
Strip & Re-Shore – L2N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Vertical Pour – L2N
Concrete Pumps
Noise due to equipment
SBB (Lot 8) Concrete
Strip Walls and Columns – L2N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Rebar – L2S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout and Install MEPs – L2S
NA
NA
SBB (Lot 8) Concrete
Set Embeds – L2S
NA
NA
SBB (Lot 8) Concrete
Form Deck – L3N
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #42
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Concrete
Fine Grade – SOG
N/A
N/A
BIO
Concrete
Vapor Barrier – SOG
N/A
N/A
BIO
Concrete
Rebar – SOG
Gradall
Noise due to Equipment
BIO
Concrete
QC/ Inspection – SOG
N/A
N/A
SBB (Lot 8) Concrete
Pour SOG 2 – L1S
Concrete Pump
Noise due to Equipment
SBB (Lot 8) Sitework
Chilled Water
Mini-excavator
Noise due to Equipment
SBB (Lot 8) Concrete
Edge Form
N/A
N/A
SBB (Lot 8) Concrete
Install Embeds
N/A
N/A
SBB (Lot 8) Concrete
MEP Sleeves & Inserts
N/A
N/A
SBB (Lot 8) Concrete
Rebar / PT Cables
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Electrical Rough-in
N/A
N/A
SBB (Lot 8) Concrete
Deck Depressions
N/A
N/A
Week of September 4, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Concrete
Pour SOG
Concrete Pump
Noise due to Equipment
BIO
Backfill
Mini-Excavator
Noise due to Equipment
BIO
Erect Steel Roof Structure
N/A
N/A
SBB (Lot 8) Concrete
MEP Sleeves and Inserts – L2N
N/A
N/A
SBB (Lot 8) Concrete
Rebar / PT Cables – L2N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Electrical Rough-in – L2N
N/A
N/A
SBB (Lot 8) Concrete
Deck Depressions – L2N
N/A
N/A
SBB (Lot 8) Concrete
Edge Form – L2S
N/A
N/A
SBB (Lot 8) Concrete
QC / Inspection – L2N
N/A
N/A
SBB (Lot 8) Concrete
Edge Form L2S
N/A
N/A
SBB (Lot 8) Concrete
Install Embeds – L2S
N/A
N/A
SBB (Lot 8) Concrete
MEP Sleeves and Inserts – L2S
N/A
N/A
SBB (Lot 8) Concrete
Rebar / PT Cables – L2S
Crane
Noise due to Equipment
Week of September 11, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bio
Install Metal Decking
NA
NA
SBB (Lot 8) Concrete
Pour – L2N
Concrete Pumps
Noise due to equipment
SBB (Lot 8) Concrete
Strip Edge Form – L2N
NA
NA
SBB (Lot 8) Concrete
Layout Walls and Columns – L2N
NA
NA
SBB (Lot 8) Concrete
Rebar – L2N
NA
NA
SBB (Lot 8) Concrete
Layout and Install MEPs – L2N
NA
NA
SBB (Lot 8) Concrete
Set Embeds – L2N
NA
NA
SBB (Lot 8) Concrete
Electrical Rough-in – L2S
NA
NA
SBB (Lot 8) Concrete
Deck Depressions – L2S
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #41
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Underslab Utilities
Install Underslab Plumbing Rough-in
N/A
N/A
BIO
Underslab Utilities
Install Unde