School of Business New Building

The new School of Business building complex will be a flagship facility, serving as the permanent home for the School. The building will complement the School of Business’ existing space program and fully address enrollment-driven needs in pursuit of their aspiration to become the premier center of management research and education in the Inland Empire.


Project Scope:

The proposed building will provide about 38,500 ASF within approximately to 63,400 GSF, along with exterior circulation and gathering areas. The program includes the following spaces:

  • Classrooms and Educational Spaces
  • Student Support Spaces
  • Academic Offices and Support Spaces
  • Administrative Offices and Support Spaces
  • Shared Building Resources (Lobby, Multipurpose room(s) etc)

School of Business Project Updates

  • 950592 UCR SBB - Construction Alert #54

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    Punchlist Corrections

    NA

    NA

    SBB (Lot 8) Concrete

    Form Steps – Auditorium

    NA

    NA

    SBB (Lot 8) Concrete

    QC / Inspection – Vert L4N

    NA

    NA

    SBB (Lot 8) Concrete

    Close Two Side Forms  – Vert L4N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Pour  – Vert L4N

    Concrete Pumps

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Rebar  – Vert L4S

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Layout & Install MEP’s – Vert L4S

    NA

    NA

    SBB (Lot 8) Concrete

    Set Embeds – Vert L4S

    NA

    NA

    SBB (Lot 8) Concrete

    QC / Inspection – Vert L4S

    NA

    NA

    SBB (Lot 8)

    Exterior Framing – L1

    NA

    NA

    SBB (Lot 8)

    Frame Interference Walls & Install Door Frames

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Wall

    NA

    NA

     

    Week of November 27, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) Concrete

    QC / Inspection – SOG North Auditorium Steps

    NA

    NA

    SBB (Lot 8) Concrete

    Strip Walls & Columns – Vert L4N

    NA

    NA

    SBB (Lot 8) Concrete

    Close Two Side Forms - Vert L4S

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Pour - Vert L4S

    Concrete Pumps

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Strip Walls & Columns – Vert L4S

    Crane

    Noise due to Equipment

    SBB (Lot 8)

    Exterior Framing – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Frame Interference Walls and Install door Frames - INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Early MEP to Support Top Down Drywall

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Wall

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Slab

    NA

    NA

     

    Week of December 4, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) Concrete

    Pour Auditorium Steps – SOG1

    Concrete Pumps

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Strip Edge Form / Bulkhead – SOG North – Auditorium Steps

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Strip & Re-Shore – Deck L4S

    NA

    NA

    SBB (Lot 8) Concrete

    Edge Form – Deck L5 Roof

    NA

    NA

    SBB (Lot 8)

    Install Early MEP to support Top Down Drywall

    NA

    NA

    SBB (Lot 8)

    Hang 1st Side Top Down Drywall – INT L1

    NA

    NA

    SBB (Lot 8)

    Install Insulation and Inspect – INT L1

    NA

    NA

    SBB (Lot 8)

    F/R/P Transformer Yard Slab

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently

    Lot 8

    Lot 43

    Lot 43

    Indefinitely

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #53

    Current Week

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    Punchlist Corrections

    NA

    NA

    SBB (Lot 8) Concrete

    Edge Form / Bulkhead - SOG North - Auditorium Steps

    NA

    NA

    SBB (Lot 8) Concrete

    Rebar - SOG North - Auditorium Steps

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Underslab Electrical Rough-in - SOG North - Auditorium Steps

    NA

    NA

    SBB (Lot 8) Concrete

    Underslab Fire Sprinkler Riser - SOG North

    NA

    NA

    SBB (Lot 8) Concrete

    QC / Inspection – Deck L4S

    NA

    NA

    SBB (Lot 8) Concrete

    Pour – Deck L4S

    Concrete Pumps

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Strip Edge Form & Transfer Beams – Deck L4S

    NA

    NA

    SBB (Lot 8) Concrete

    Stress Transfer Beams – Deck L4S

    NA

    NA

    SBB (Lot 8) Concrete

    Layout Walls & Columns -Vert L4N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    One Side Form Walls & Columns -Vert L4N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Rebar -Vert L4N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Layout & Install MEP's -Vert L4N

    NA

    NA

    SBB (Lot 8) Concrete

    Set Embeds -Vert L4N

    NA

    NA

    SBB (Lot 8) Concrete

    Layout Walls & Columns – Vert L4S

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Wall

    NA

    NA

     

    Week of November 20, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    Building Complete

    NA

    NA

    SBB (Lot 8) Concrete

    Form Steps – Auditorium

    NA

    NA

    SBB (Lot 8) Concrete

    QC / Inspection – Vert L4N

    NA

    NA

    SBB (Lot 8) Concrete

    Close Two Side Forms  – Vert L4N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Pour  – Vert L4N

    Concrete Pumps

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Rebar  – Vert L4S

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Layout & Install MEP’s – Vert L4S

    NA

    NA

    SBB (Lot 8) Concrete

    Set Embeds – Vert L4S

    NA

    NA

    SBB (Lot 8) Concrete

    QC / Inspection – Vert L4S

    NA

    NA

    SBB (Lot 8)

    Exterior Framing – L1

    NA

    NA

    SBB (Lot 8)

    Frame Interference Walls & Install Door Frames

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Wall

    NA

    NA

     

    Week of November 27, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) Concrete

    QC / Inspection – SOG North Auditorium Steps

    NA

    NA

    SBB (Lot 8) Concrete

    Strip Walls & Columns – Vert L4N

    NA

    NA

    SBB (Lot 8) Concrete

    Close Two Side Forms - Vert L4S

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Pour - Vert L4S

    Concrete Pumps

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Strip Walls & Columns – Vert L4S

    Crane

    Noise due to Equipment

    SBB (Lot 8)

    Exterior Framing – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Frame Interference Walls and Install door Frames - INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Early MEP to Support Top Down Drywall

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Wall

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Slab

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently

    Lot 8

    Lot 43

    Lot 43

    Indefinitely

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

     

  • 950592 UCR SBB - Construction Alert #52

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    Develop punch list

    NA

    NA

    BIO

    Startup and Test Fire Alarm System

    NA

    NA

    BIO

    Startup and Test Lighting

    NA

    NA

    BIO

    Startup and Test mechanical / Control Systems

    NA

    NA

    BIO

    Startup and Test Walk-in Cooler

    NA

    NA

    BIO

    Punchlist Corrections

    NA

    NA

    SBB (Lot 8) Concrete

    Rebar / PT Cables

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Electrical Rough-in

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Footings

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Walls

    NA

    NA

    SBB (Lot 8) Concrete

    Install Water Line – Campus Dr POC to SBB POC

    NA

    NA

    SBB (Lot 8) Concrete

    Rebar / PT Cables

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Electrical Rough-in

    NA

    NA

    SBB (Lot 8) Concrete

    Deck Depressions

    NA

    NA

    SBB (Lot 8) Util

    Shutdown and Tie-in Water Line to Pump House

    NA

    NA

     

    Week of November 13, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    Punchlist Corrections

    NA

    NA

    SBB (Lot 8) Concrete

    Edge Form / Bulkhead - SOG North - Auditorium Steps

    NA

    NA

    SBB (Lot 8) Concrete

    Rebar - SOG North - Auditorium Steps

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Underslab Electrical Rough-in - SOG North - Auditorium Steps

    NA

    NA

    SBB (Lot 8) Concrete

    Underslab Fire Sprinkler Riser - SOG North

    NA

    NA

    SBB (Lot 8) Concrete

    QC / Inspection – Deck L4S

    NA

    NA

    SBB (Lot 8) Concrete

    Pour – Deck L4S

    Concrete Pumps

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Strip Edge Form & Transfer Beams – Deck L4S

    NA

    NA

    SBB (Lot 8) Concrete

    Stress Transfer Beams – Deck L4S

    NA

    NA

    SBB (Lot 8) Concrete

    Layout Walls & Columns -Vert L4N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    One Side Form Walls & Columns -Vert L4N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Rebar -Vert L4N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Layout & Install MEP's -Vert L4N

    NA

    NA

    SBB (Lot 8) Concrete

    Set Embeds -Vert L4N

    NA

    NA

    SBB (Lot 8) Concrete

    Layout Walls & Columns – Vert L4S

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Wall

    NA

    NA

     

    Week of November 20, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    Building Complete

    NA

    NA

    SBB (Lot 8) Concrete

    Form Steps – Auditorium

    NA

    NA

    SBB (Lot 8) Concrete

    QC / Inspection – Vert L4N

    NA

    NA

    SBB (Lot 8) Concrete

    Close Two Side Forms  – Vert L4N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Pour  – Vert L4N

    Concrete Pumps

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Rebar  – Vert L4S

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Layout & Install MEP’s – Vert L4S

    NA

    NA

    SBB (Lot 8) Concrete

    Set Embeds – Vert L4S

    NA

    NA

    SBB (Lot 8) Concrete

    QC / Inspection – Vert L4S

    NA

    NA

    SBB (Lot 8)

    Exterior Framing – L1

    NA

    NA

    SBB (Lot 8)

    Frame Interference Walls & Install Door Frames

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Wall

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently

    Lot 8

    Lot 43

    Lot 43

    Indefinitely

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #51

    Current Weeks

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    Final Clean

    NA

    NA

    BIO

    Start-up & Test Mechanical / Controls System

    NA

    NA

    BIO

    Start-up & Test Fire Alarm Systems

    NA

    NA

    BIO

    Start-up & Test Lighting

    NA

    NA

    BIO

    Start-up & Test Plumbing

    NA

    NA

    BIO

    Start-up & Test Card Reader

    NA

    NA

    SBB (Lot 8) Concrete

    Strip and Re-Shore – Deck L3N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Pour – Vert L3S

    Concrete Pump

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Strip Walls & Columns – Vert L3S

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Install Water Line – Campus Dr POC to SBB POC

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Footings

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Walls at Transformer Yard

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Slab

    NA

    NA

    SBB (Lot 8) Concrete

    Form Deck – Deck L4S

    NA

    NA

    SBB (Lot 8) Concrete

    Edge Form – Deck L4S

    NA

    NA

    SBB (Lot 8) Concrete

    Install Embeds – Deck L4S

    NA

    NA

    SBB (Lot 8) Concrete

    MEP Sleeves and Insert – Deck L4S

    NA

    NA

     

    Week of November 6, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    Develop punch list

    NA

    NA

    BIO

    Startup and Test Fire Alarm System

    NA

    NA

    BIO

    Startup and Test Lighting

    NA

    NA

    BIO

    Startup and Test mechanical / Control Systems

    NA

    NA

    BIO

    Startup and Test Walk-in Cooler

    NA

    NA

    BIO

    Punchlist Corrections

    NA

    NA

    SBB (Lot 8) Concrete

    Rebar / PT Cables

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Electrical Rough-in

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Footings

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Walls

    NA

    NA

    SBB (Lot 8) Concrete

    Install Water Line – Campus Dr POC to SBB POC

    NA

    NA

    SBB (Lot 8) Concrete

    Rebar / PT Cables

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Electrical Rough-in

    NA

    NA

    SBB (Lot 8) Concrete

    Deck Depressions

    NA

    NA

    SBB (Lot 8) Util

    Shutdown and Tie-in Water Line to Pump House

    NA

    NA

     

    Week of November 13, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    Punchlist Corrections

    NA

    NA

    SBB (Lot 8) Concrete

    Edge Form / Bulkhead - SOG North - Auditorium Steps

    NA

    NA

    SBB (Lot 8) Concrete

    Rebar - SOG North - Auditorium Steps

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Underslab Electrical Rough-in - SOG North - Auditorium Steps

    NA

    NA

    SBB (Lot 8) Concrete

    Underslab Fire Sprinkler Riser - SOG North

    NA

    NA

    SBB (Lot 8) Concrete

    QC / Inspection – Deck L4S

    NA

    NA

    SBB (Lot 8) Concrete

    Pour – Deck L4S

    NA

    NA

    SBB (Lot 8) Concrete

    Strip Edge Form & Transfer Beams – Deck L4S

    NA

    NA

    SBB (Lot 8) Concrete

    Stress Transfer Beams – Deck L4S

    NA

    NA

    SBB (Lot 8) Concrete

    Layout Walls & Columns -Vert L4N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    One Side Form Walls & Columns -Vert L4N

    NA

    NA

    SBB (Lot 8) Concrete

    Rebar -Vert L4N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Layout & Install MEP's -Vert L4N

    NA

    NA

    SBB (Lot 8) Concrete

    Set Embeds -Vert L4N

    NA

    NA

    SBB (Lot 8) Concrete

    Layout Walls & Columns – Vert L4S

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Wall

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently

    Lot 8

    Lot 43

    Lot 43

    Indefinitely

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

     

  • 950592 UCR SBB - Construction Alert #50

    Current Weeks

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    Landscape and Irrigation

    Mini-excavator

    Noise due to Equipment

    BIO

    Install Bio-Filtration Planter

    Mini-excavator

    Noise due to Equipment

    BIO

    Start-up & Test Walk-in Cooler

    NA

    NA

    BIO

    New Water Line to Pump House / POC’s

    NA

    NA

    BIO

    Shutdown and Tie-in Water Line to Pump House

    NA

    NA

    SBB (Lot 8) Concrete

    Pour – Vert L3N

    Concrete Pump

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Strip Walls & Columns – Vert L3N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Stress Transfer Beams – Deck L3S

    NA

    NA

    SBB (Lot 8) Concrete

    Layout & Install MEPs – Vert L3S

    NA

    NA

    SBB (Lot 8) Concrete

    Set Embeds – Vert L3S

    NA

    NA

    SBB (Lot 8) Concrete

    QC/Inspection – Vert L3S

    NA

    NA

    SBB (Lot 8) Concrete

    Close Two Side Forms – Vert L3S

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Form Deck – L4S

    NA

    NA

     

    Week of October 30, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    Start-up & Test Mechanical / Controls System

    NA

    NA

    BIO

    Start-up & Test Fire Alarm Systems

    NA

    NA

    BIO

    Start-up & Test Lighting

    NA

    NA

    SBB (Lot 8) Concrete

    Strip and Re-Shore – Deck L3N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Pour – Vert L3S

    Concrete Pump

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Strip Walls & Columns – Vert L3S

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Install Water Line – Campus Dr POC to SBB POC

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Footings

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Walls at Transformer Yard

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Slab

    NA

    NA

     

    Week of November 6, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    Develop punch list

    NA

    NA

    BIO

    Startup and Test Fire Alarm System

    NA

    NA

    BIO

    Startup and Test Lighting

    NA

    NA

    SBB (Lot 8) Concrete

    Rebar / PT Cables

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Electrical Rough-in

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Footings

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Walls

    NA

    NA

    SBB (Lot 8) Concrete

    Install Water Line – Campus Dr POC to SBB POC

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently

    Lot 8

    Lot 43

    Lot 43

    Indefinitely

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #49

    Current Weeks

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    Install HVAC Trim

    NA

    NA

    BIO

    Install Fire Alarm Devices and Trim

    NA

    NA

    BIO

    Install Light Fixtures

    NA

    NA

    BIO

    Install Site Furnishings

    NA

    NA

    BIO

    Landscape and Irrigation

    Mini-excavator

    Noise due to Equipment

    BIO

    Install Bio-Filtration Planter

    Mini-excavator

    Noise due to Equipment

    BIO

    MEPT Startup and Testing

    NA

    NA

    BIO

    Install Walk-in Cooler

    NA

    NA

    SBB (Lot 8) Concrete

    Stress Transfer Beams – Deck L3N

    NA

    NA

    SBB (Lot 8) Concrete

    Rebar – Vert L3N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Layout & Install MEP’s – Vert L3N

    NA

    NA

    SBB (Lot 8) Concrete

    Set Embeds – Vert L3N

    NA

    NA

    SBB (Lot 8) Concrete

    QC / Inspection – Vert L3N

    NA

    NA

    SBB (Lot 8) Concrete

    Close two side Forms – Vert L3N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Deck Depressions – Deck L3S

    NA

    NA

    SBB (Lot 8) Concrete

    QC / Inspection – Deck L3S

    NA

    NA

    SBB (Lot 8) Concrete

    Pour – Deck L3S

    Concrete Pumps

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Strip Edge Form – Deck L3S

    NA

    NA

     

    Week of October 23, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    Landscape and Irrigation

    Mini-excavator

    Noise due to Equipment

    BIO

    Install Bio-Filtration Planter

    Mini-excavator

    Noise due to Equipment

    BIO

    Start-up & Test Walk-in Cooler

    NA

    NA

    BIO

    New Water Line to Pump House / POC’s

    NA

    NA

    BIO

    Shutdown and Tie-in Water Line to Pump House

    NA

    NA

    SBB (Lot 8) Concrete

    Pour – Vert L3N

    Concrete Pump

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Strip Walls & Columns – Vert L3N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Stress Transfer Beams – Deck L3S

    NA

    NA

    SBB (Lot 8) Concrete

    Layout & Install MEPs – Vert L3S

    NA

    NA

    SBB (Lot 8) Concrete

    Set Embeds – Vert L3S

    NA

    NA

    SBB (Lot 8) Concrete

    QC/Inspection – Vert L3S

    NA

    NA

    SBB (Lot 8) Concrete

    Close Two Side Forms – Vert L3S

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Form Deck – L4S

    NA

    NA

     

    Week of October 30, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    Start-up & Test Mechanical / Controls System

    NA

    NA

    BIO

    Start-up & Test Fire Alarm Systems

    NA

    NA

    BIO

    Start-up & Test Lighting

    NA

    NA

    SBB (Lot 8) Concrete

    Strip and Re-Shore – Deck L3N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Pour – Vert L3S

    Concrete Pump

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Strip Walls & Columns – Vert L3S

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Install Water Line – Campus Dr POC to SBB POC

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Walls at Transformer Yard

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Slab

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently

    Lot 8

    Lot 43

    Lot 43

    Indefinitely

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #48

    Current Weeks

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    Parapet Coping / Flashing / Louvers

    NA

    NA

    BIO

    Pull Wire from transformer to Panels

    NA

    NA

    BIO

    Hook-up and Terminate Transformer

    NA

    NA

    BIO

    Hook-up and Terminate Condensing Units

    NA

    NA

    BIO

    Install Walk-in Cooler

    NA

    NA

    BIO

    Install Casework

    NA

    NA

    BIO

    Install Plumbing Fixtures

    NA

    NA

    SBB (Lot 8) Concrete

    Deck Depressions – Deck L3N

    NA

    NA

    SBB (Lot 8) Concrete

    QC / Inspection – Deck L3N

    NA

    NA

    SBB (Lot 8) Concrete

    Pour – Deck L3N

    Concrete Pumps

    Noise Due to Equipment

    SBB (Lot 8) Concrete

    Strip Edge Form and Transfer Beams – Deck L3N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Cure for Stress – Deck L3N

    NA

    NA

    SBB (Lot 8) Concrete

    Install Embeds – Deck L3S

    NA

    NA

    SBB (Lot 8) Concrete

    MEP Sleeves and Inserts – Deck L3S

    NA

    NA

    SBB (Lot 8) Concrete

    Layout Walls and Columns – Vert L3N

    NA

    NA

    SBB (Lot 8) Concrete

    One Side Form Walls and Columns – Vert L3N

    NA

    NA

    SBB (Lot 8) Concrete

    Rebar / PT Cables – Deck L3S

    Crane

    Noise due to Equipment

     

    Week of October 16, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    Install HVAC Trim

    NA

    NA

    BIO

    Install Fire Alarm Devices and Trim

    NA

    NA

    BIO

    Install Light Fixtures

    NA

    NA

    BIO

    Install Site Furnishings

    NA

    NA

    BIO

    Landscape and Irrigation

    Mini-excavator

    Noise due to Equipment

    BIO

    Install Bio-Filtration Planter

    Mini-excavator

    Noise due to Equipment

    BIO

    MEPT Startup and Testing

    NA

    NA

    BIO

    Install Walk-in Cooler

    NA

    NA

    SBB (Lot 8) Concrete

    Stress Transfer Beams – Deck L3N

    NA

    NA

    SBB (Lot 8) Concrete

    Rebar – Vert L3N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Layout & Install MEP’s – Vert L3N

    NA

    NA

    SBB (Lot 8) Concrete

    Set Embeds – Vert L3N

    NA

    NA

    SBB (Lot 8) Concrete

    QC / Inspection – Vert L3N

    NA

    NA

    SBB (Lot 8) Concrete

    Close two side Forms – Vert L3N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Deck Depressions – Deck L3S

    NA

    NA

    SBB (Lot 8) Concrete

    QC / Inspection – Deck L3S

    NA

    NA

    SBB (Lot 8) Concrete

    Pour – Deck L3S

    Concrete Pumps

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Strip Edge Form – Deck L3S

    NA

    NA

     

     

     

     

     

    Week of October 23, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    Landscape and Irrigation

    Mini-excavator

    Noise due to Equipment

    BIO

    Install Bio-Filtration Planter

    Mini-excavator

    Noise due to Equipment

    BIO

    Start-up & Test Walk-in Cooler

    NA

    NA

    BIO

    New Water Line to Pump House / POC’s

    NA

    NA

    BIO

    Shutdown and Tie-in Water Line to Pump House

    NA

    NA

    SBB (Lot 8) Concrete

    Pour – Vert L3N

    Concrete Pump

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Strip Walls & Columns – Vert L3N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Stress Transfer Beams – Deck L3S

    NA

    NA

    SBB (Lot 8) Concrete

    Layout & Install MEPs – Vert L3S

    NA

    NA

    SBB (Lot 8) Concrete

    Set Embeds – Vert L3S

    NA

    NA

    SBB (Lot 8) Concrete

    QC/Inspection – Vert L3S

    NA

    NA

    SBB (Lot 8) Concrete

    Close Two Side Forms – Vert L3S

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Form Deck – L4S

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently

    Lot 8

    Lot 43

    Lot 43

    Indefinitely

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #47

    Current Weeks

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    H/T/F Drywall

    NA

    NA

    BIO

    Set Transformer

    NA

    NA

    BIO

    Set Condensing Units

    NA

    NA

    BIO

    Hook-up and Terminate Transformer

    NA

    NA

    BIO

    Hook-up and Terminate Condensing Units

    NA

    NA

    SBB (Lot 8) Concrete

    Install Embed – Deck L3N

    NA

    NA

    SBB (Lot 8) Concrete

    MEP Sleeves and Inserts - Deck L3N

    NA

    NA

    SBB (Lot 8) Concrete

    Rebar / PT Cables - Deck L3N

    NA

    NA

    SBB (Lot 8) Concrete

    Electrical Rough-in - Deck L3N

    NA

    NA

    SBB (Lot 8) Concrete

    Form Deck - Deck L3S

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Edge Form - Deck L3S

    NA

    NA

    SBB (Lot 8)

    F/R/P Manlift Pad

    NA

    NA

    SBB (Lot 8)

    Storm drain

    Backhoe

    Noise due to equipment

     

    Week of October 9, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    Parapet Coping / Flashing / Louvers

    NA

    NA

    BIO

    Pull Wire from transformer to Panels

    NA

    NA

    BIO

    Hook-up and Terminate Transformer

    NA

    NA

    BIO

    Hook-up and Terminate Condensing Units

    NA

    NA

    SBB (Lot 8) Concrete

    Deck Depressions – Deck L3N

    NA

    NA

    SBB (Lot 8) Concrete

    QC / Inspection – Deck L3N

    NA

    NA

    SBB (Lot 8) Concrete

    Pour – Deck L3N

    Concrete Pumps

    Noise Due to Equipment

    SBB (Lot 8) Concrete

    Strip Edge Form and Transfer Beams – Deck L3N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Cure for Stress – Deck L3N

    NA

    NA

    SBB (Lot 8) Concrete

    Install Embeds – Deck L3S

    NA

    NA

    SBB (Lot 8) Concrete

    MEP Sleeves and Inserts – Deck L3S

    NA

    NA

    SBB (Lot 8) Concrete

    Layout Walls and Columns – Vert L3N

    NA

    NA

    SBB (Lot 8) Concrete

    One Side Form Walls and Columns – Vert L3N

    NA

    NA

    SBB (Lot 8) Concrete

    Rebar / PT Cables – Deck L3S

    Crane

    Noise due to Equipment

     

    Week of October 16, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    Install HVAC Trim

    NA

    NA

    BIO

    Install Fire Alarm Devices and Trim

    NA

    NA

    BIO

    Install Light Fixtures

    NA

    NA

    BIO

    Install Site Furnishings

    NA

    NA

    BIO

    Landscape and Irrigation

    NA

    NA

    BIO

    Install Bio-Filtration Planter

    NA

    NA

    BIO

    MEPT Startup and Testing

    NA

    NA

    SBB (Lot 8) Concrete

    Stress Transfer Beams – Deck L3N

    NA

    NA

    SBB (Lot 8) Concrete

    Rebar – Vert L3N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Layout & Install MEP’s – Vert L3N

    NA

    NA

    SBB (Lot 8) Concrete

    Set Embeds – Vert L3N

    NA

    NA

    SBB (Lot 8) Concrete

    QC / Inspection – Vert L3N

    NA

    NA

    SBB (Lot 8) Concrete

    Close two side Forms – Vert L3N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Deck Depressions – Deck L3S

    NA

    NA

    SBB (Lot 8) Concrete

    QC / Inspection – Deck L3S

    NA

    NA

    SBB (Lot 8) Concrete

    Pour – Deck L3S

    Concrete Pumps

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Strip Edge Form – Deck L3S

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently

    Lot 8

    Lot 43

    Lot 43

    Indefinitely

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #46

    Current Weeks

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    In-Wall & Overhead Electrical Rough-in

    NA

    NA

    BIO

    Pull Electrical and Low Voltage Wire

    NA

    NA

    BIO

    Fine Grade for Finish Site Work

    Heavy Equipment

    Noise due to Equipment

    BIO

    F/R/P Equipment Pads

    NA

    NA

    BIO

    F/R/P New Flatwork to Tie Into Existing

    NA

    NA

    SBB (Lot 8) Concrete

    Strip Walls and Columns – Vertical L2N

    NA

    NA

    SBB (Lot 8) Concrete

    Set Embeds - Vertical L2S

    NA

    NA

    SBB (Lot 8) Concrete

    QC Inspection - Vertical L2S

    NA

    NA

    SBB (Lot 8) Concrete

    Close two side forms - Vertical L2S

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Pour  - Vertical L2S

    Concrete Pump

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Strip walls & Columns  - Vertical L2S

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Form Deck – Deck L3N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Edge Form – Deck L3N

    NA

    NA

     

    Week of October 2, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    H/T/F Drywall

    NA

    NA

    BIO

    Set Transformer

    NA

    NA

    BIO

    Set Condensing Units

    NA

    NA

    BIO

    Hook-up and Terminate Transformer

    NA

    NA

    BIO

    Hook-up and Terminate Condensing Units

    NA

    NA

    SBB (Lot 8) Concrete

    Install Embed – Deck L3N

    NA

    NA

    SBB (Lot 8) Concrete

    MEP Sleeves and Inserts - Deck L3N

    NA

    NA

    SBB (Lot 8) Concrete

    Rebar / PT Cables - Deck L3N

    NA

    NA

    SBB (Lot 8) Concrete

    Electrical Rough-in - Deck L3N

    NA

    NA

    SBB (Lot 8) Concrete

    Form Deck - Deck L3S

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Edge Form - Deck L3S

    NA

    NA

    SBB (Lot 8)

    F/R/P Manlift Pad

    NA

    NA

     

    Week of October 9, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    Parapet Coping / Flashing / Louvers

    NA

    NA

    BIO

    Pull Wire from transformer to Panels

    NA

    NA

    BIO

    Hook-up and Terminate Transformer

    NA

    NA

    BIO

    Hook-up and Terminate Condensing Units

    NA

    NA

    SBB (Lot 8) Concrete

    Deck Depressions – Deck L3N

    NA

    NA

    SBB (Lot 8) Concrete

    QC / Inspection – Deck L3N

    NA

    NA

    SBB (Lot 8) Concrete

    Pour – Deck L3N

    Concrete Pumps

    Noise Due to Equipment

    SBB (Lot 8) Concrete

    Strip Edge Form and Transfer Beams – Deck L3N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Cure for Stress – Deck L3N

    NA

    NA

    SBB (Lot 8) Concrete

    Instll Embeds – Deck L3S

    NA

    NA

    SBB (Lot 8) Concrete

    MEP Sleeves and Inserts – Deck L3S

    NA

    NA

    SBB (Lot 8) Concrete

    Rebar / PT Cables – Deck L3S

    Crane

    Noise due to Equipment

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently

    Lot 8

    Lot 43

    Lot 43

    Indefinitely

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #45

    Current Weeks

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    Parapet Coping/Flashing/Louvers

    NA

    NA

    BIO

    Downspouts

    NA

    NA

    BIO

    In-Wall and overhead plumbing work

    NA

    NA

    BIO

    Set fan coil units

    NA

    NA

    SBB (Lot 8) Concrete

    Strip & Re-Shore – Deck L2N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Layout and Install MEP’s – Vertical L2N

    NA

    NA

    SBB (Lot 8) Concrete

    Set Embeds – Vertical L2N

    NA

    NA

    SBB (Lot 8) Concrete

    QC / Inspection– Vertical L2N

    NA

    NA

    SBB (Lot 8) Concrete

    Close Two Side Forms– Vertical L2N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Pour– Vertical L2N

    Concrete Pumps

    Noise due to equipment

    SBB (Lot 8) Concrete

    Pour – Deck L2S

    Concrete Pumps

    Noise due to equipment

    SBB (Lot 8) Concrete

    Strip Edge Form – Deck L2S

    NA

    NA

    SBB (Lot 8) Concrete

    Stress Transfer Beams– Deck L2S

    NA

    NA

    SBB (Lot 8) Concrete

    Layout Walls and Columns – Vert L2S

    NA

    NA

    SBB (Lot 8) Concrete

    One side form walls and columns – Vert L2S

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Rebar – Vert L2S

    NA

    NA

    SBB (Lot 8) Concrete

    Layout and Install MEP’s – Vert L2S

    NA

    NA

     

    Week of September 25, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    In-Wall & Overhead Electrical Rough-in

    NA

    NA

    BIO

    Pull Electrical and Low Voltage Wire

    NA

    NA

    BIO

    Fine Grade for Finish Site Work

    Heavy Equipment

    Noise due to Equipment

    BIO

    F/R/P Equipment Pads

    NA

    NA

    BIO

    F/R/P New Flatwork to Tie Into Existing

    NA

    NA

    SBB (Lot 8) Concrete

    Strip Walls and Columns – Vertical L2N

    NA

    NA

    SBB (Lot 8) Concrete

    Set Embeds - Vertical L2S

    NA

    NA

    SBB (Lot 8) Concrete

    QC Inspection - Vertical L2S

    NA

    NA

    SBB (Lot 8) Concrete

    Close two side forms - Vertical L2S

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Pour  - Vertical L2S

    Concrete Pump

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Strip walls & Columns  - Vertical L2S

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Form Deck – Deck L3N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Edge Form – Deck L3N

    NA

    NA

     

    Week of October 2, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    H/T/F Drywall

    NA

    NA

    BIO

    Set Transformer

    NA

    NA

    BIO

    Set Condensing Units

    NA

    NA

    BIO

    Hook-up and Terminate Transformer

    NA

    NA

    BIO

    Hook-up and Terminate Condensing Units

    NA

    NA

    SBB (Lot 8) Concrete

    Install Embed – Deck L3N

    NA

    NA

    SBB (Lot 8) Concrete

    MEP Sleeves and Inserts - Deck L3N

    NA

    NA

    SBB (Lot 8) Concrete

    Rebar / PT Cables - Deck L3N

    NA

    NA

    SBB (Lot 8) Concrete

    Electrical Rough-in - Deck L3N

    NA

    NA

    SBB (Lot 8) Concrete

    Form Deck - Deck L3S

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Edge Form - Deck L3S

    NA

    NA

    SBB (Lot 8)

    F/R/P Manlift Pad

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently

    Lot 8

    Lot 43

    Lot 43

    Indefinitely

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #44

    Current Weeks

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    Install Metal Decking

    Gradall

    Noise due to equipment

    BIO

    Framing and Insulation

    Gradall

    Noise due to equipment

    SBB (Lot 8) Concrete

    Deck Pour – L2N

    Concrete Pumps

    Noise due to equipment

    SBB (Lot 8) Concrete

    Strip Edge Form – L2N

    NA

    NA

    SBB (Lot 8) Concrete

    Layout Walls and Columns – L2N

    NA

    NA

    SBB (Lot 8) Concrete

    Rebar – L2N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Layout and Install MEPs – L2N

    NA

    NA

    SBB (Lot 8) Concrete

    Set Embeds – L2N

    NA

    NA

    SBB (Lot 8) Concrete

    Electrical Rough-in – L2S

    NA

    NA

    SBB (Lot 8) Concrete

    Deck Pour – L2S

    Concrete Pumps

    Noise due to equipment

    SBB (Lot 8) Concrete

    Deck Depressions – L2S

    NA

    NA

    SBB (Lot 8) Concrete

    Install Embeds – L2S

    N/A

    N/A

    SBB (Lot 8) Concrete

    Install Embeds – L2S

    N/A

    N/A

    SBB (Lot 8) Concrete

    Rebar / PT Cables – L2S

    Crane

    Noise due to Equipment

     

    Week of September 18, 2023

    Construction Activities 

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    Parapet Coping/Flashing/Louvers

    NA

    NA

    BIO

    Downspouts

    NA

    NA

    BIO

    In-Wall and overhead plumbing work

    NA

    NA

    BIO

    Set fan coil units

    NA

    NA

    SBB (Lot 8) Concrete

    Strip & Re-Shore – Deck L2N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Layout and Install MEP’s – Vertical L2N

    NA

    NA

    SBB (Lot 8) Concrete

    Set Embeds – Vertical L2N

    NA

    NA

    SBB (Lot 8) Concrete

    QC / Inspection– Vertical L2N

    NA

    NA

    SBB (Lot 8) Concrete

    Close Two Side Forms– Vertical L2N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Pour– Vertical L2N

    Concrete Pumps

    Noise due to equipment

    SBB (Lot 8) Concrete

    Pour – Deck L2S

    Concrete Pumps

    Noise due to equipment

    SBB (Lot 8) Concrete

    Strip Edge Form – Deck L2S

    NA

    NA

    SBB (Lot 8) Concrete

    Stress Transfer Beams– Deck L2S

    NA

    NA

    SBB (Lot 8) Concrete

    Layout Walls and Columns – Vert L2S

    NA

    NA

    SBB (Lot 8) Concrete

    One side form walls and columns – Vert L2S

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Rebar – Vert L2S

    NA

    NA

    SBB (Lot 8) Concrete

    Layout and Install MEP’s – Vert L2S

    NA

    NA

     

    Week of September 25, 2023

    Construction Activities 

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    In-Wall & Overhead Electrical Rough-in

    NA

    NA

    BIO

    Pull Electrical and Low Voltage Wire

    NA

    NA

    BIO

    Fine Grade for Finish Site Work

    Heavy Equipment

    Noise due to Equipment

    BIO

    F/R/P Equipment Pads

    NA

    NA

    BIO

    F/R/P New Flatwork to Tie Into Existing

    NA

    NA

    SBB (Lot 8) Concrete

    Strip Walls and Columns – Vertical L2N

    NA

    NA

    SBB (Lot 8) Concrete

    Set Embeds - Vertical L2S

    NA

    NA

    SBB (Lot 8) Concrete

    QC Inspection - Vertical L2S

    NA

    NA

    SBB (Lot 8) Concrete

    Close two side forms - Vertical L2S

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Pour  - Vertical L2S

    Concrete Pump

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Strip walls & Columns  - Vertical L2S

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Form Deck – Deck L3N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Edge Form – Deck L3N

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently

    Lot 8

    Lot 43

    Lot 43

    Indefinitely

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #43

    Current Weeks

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    Concrete

    Pour SOG

    Concrete Pump

    Noise due to Equipment

    BIO

    Backfill

    Mini-Excavator

    Noise due to Equipment

    BIO

    Erect Steel Roof Structure

    N/A

    N/A

    SBB (Lot 8) Concrete

    MEP Sleeves and Inserts – L2N

    N/A

    N/A

    SBB (Lot 8) Concrete

    Rebar / PT Cables – L2N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Electrical Rough-in – L2N

    N/A

    N/A

    SBB (Lot 8) Concrete

    Deck Depressions – L2N

    N/A

    N/A

    SBB (Lot 8) Concrete

    Edge Form – L2S

    N/A

    N/A

    SBB (Lot 8) Concrete

    QC / Inspection – L2N

    N/A

    N/A

    SBB (Lot 8) Concrete

    Edge Form L2S

    N/A

    N/A

    SBB (Lot 8) Concrete

    Install Embeds – L2S

    N/A

    N/A

    SBB (Lot 8) Concrete

    MEP Sleeves and Inserts – L2S

    N/A

    N/A

    SBB (Lot 8) Concrete

    Rebar / PT Cables – L2S

    Crane

    Noise due to Equipment

     

    Week of September 11, 2023

    Construction Activities 

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    Install Metal Decking

    Gradall

    Noise due to equipment

    SBB (Lot 8) Concrete

    Deck Pour – L2N

    Concrete Pumps

    Noise due to equipment

    SBB (Lot 8) Concrete

    Strip Edge Form – L2N

    NA

    NA

    SBB (Lot 8) Concrete

    Layout Walls and Columns – L2N

    NA

    NA

    SBB (Lot 8) Concrete

    Rebar – L2N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Layout and Install MEPs – L2N

    NA

    NA

    SBB (Lot 8) Concrete

    Set Embeds – L2N

    NA

    NA

    SBB (Lot 8) Concrete

    Electrical Rough-in – L2S

    NA

    NA

    SBB (Lot 8) Concrete

    Deck Pour – L2S

    Concrete Pumps

    Noise due to equipment

    SBB (Lot 8) Concrete

    Deck Depressions – L2S

    NA

    NA

     

    Week of September 18, 2023

    Construction Activities 

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    Install Door Frames

    NA

    NA

    BIO

    Install Doors and Hardware

    NA

    NA

    BIO

    Install Roofing System

    Gradall

    Noise due to equipment

    BIO

    Install Electrical Panels

    NA

    NA

    SBB (Lot 8) Concrete

    Strip & Re-Shore – L2N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Vertical Pour – L2N

    Concrete Pumps

    Noise due to equipment

    SBB (Lot 8) Concrete

    Strip Walls and Columns – L2N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Rebar – L2S

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Layout and Install MEPs – L2S

    NA

    NA

    SBB (Lot 8) Concrete

    Set Embeds – L2S

    NA

    NA

    SBB (Lot 8) Concrete

    Form Deck – L3N

    NA

    NA

     

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently

    Lot 8

    Lot 43

    Lot 43

    Indefinitely

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #42

    Current Weeks

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    Concrete

    Fine Grade – SOG

    N/A

    N/A

    BIO

    Concrete

    Vapor Barrier – SOG

    N/A

    N/A

    BIO

    Concrete

    Rebar – SOG

    Gradall

    Noise due to Equipment

    BIO

    Concrete

    QC/ Inspection – SOG

    N/A

    N/A

    SBB (Lot 8) Concrete

    Pour SOG 2 – L1S

    Concrete Pump

    Noise due to Equipment

    SBB (Lot 8) Sitework

    Chilled Water

    Mini-excavator

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Edge Form

    N/A

    N/A

     

    SBB (Lot 8) Concrete

    Install Embeds

    N/A

    N/A

    SBB (Lot 8) Concrete

    MEP Sleeves & Inserts

    N/A

    N/A

    SBB (Lot 8) Concrete

    Rebar / PT Cables

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Electrical Rough-in

    N/A

    N/A

    SBB (Lot 8) Concrete

    Deck Depressions

    N/A

    N/A

     

    Week of September 4, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    Concrete

    Pour SOG

    Concrete Pump

    Noise due to Equipment

    BIO

    Backfill

    Mini-Excavator

    Noise due to Equipment

    BIO

    Erect Steel Roof Structure

    N/A

    N/A

    SBB (Lot 8) Concrete

    MEP Sleeves and Inserts – L2N

    N/A

    N/A

    SBB (Lot 8) Concrete

    Rebar / PT Cables – L2N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Electrical Rough-in – L2N

    N/A

    N/A

    SBB (Lot 8) Concrete

    Deck Depressions – L2N

    N/A

    N/A

    SBB (Lot 8) Concrete

    Edge Form – L2S

    N/A

    N/A

    SBB (Lot 8) Concrete

    QC / Inspection – L2N

    N/A

    N/A

    SBB (Lot 8) Concrete

    Edge Form L2S

    N/A

    N/A

    SBB (Lot 8) Concrete

    Install Embeds – L2S

    N/A

    N/A

    SBB (Lot 8) Concrete

    MEP Sleeves and Inserts – L2S

    N/A

    N/A

    SBB (Lot 8) Concrete

    Rebar / PT Cables – L2S

    Crane

    Noise due to Equipment

     

    Week of September 11, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Bio

    Install Metal Decking

    NA

    NA

    SBB (Lot 8) Concrete

    Pour – L2N

    Concrete Pumps

    Noise due to equipment

    SBB (Lot 8) Concrete

    Strip Edge Form – L2N

    NA

    NA

    SBB (Lot 8) Concrete

    Layout Walls and Columns – L2N

    NA

    NA

    SBB (Lot 8) Concrete

    Rebar – L2N

    NA

    NA

    SBB (Lot 8) Concrete

    Layout and Install MEPs – L2N

    NA

    NA

    SBB (Lot 8) Concrete

    Set Embeds – L2N

    NA

    NA

    SBB (Lot 8) Concrete

    Electrical Rough-in – L2S

    NA

    NA

    SBB (Lot 8) Concrete

    Deck Depressions – L2S

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently

    Lot 8

    Lot 43

    Lot 43

    Indefinitely

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #41

    Current Weeks

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    Underslab Utilities

    Install Underslab Plumbing Rough-in

    N/A

    N/A

    BIO

    Underslab Utilities

    Install Unde