School of Business New Building

The new School of Business building complex will be a flagship facility, serving as the permanent home for the School. The building will complement the School of Business’ existing space program and fully address enrollment-driven needs in pursuit of their aspiration to become the premier center of management research and education in the Inland Empire.


Project Scope:

The proposed building will provide about 38,500 ASF within approximately to 63,400 GSF, along with exterior circulation and gathering areas. The program includes the following spaces:

  • Classrooms and Educational Spaces
  • Student Support Spaces
  • Academic Offices and Support Spaces
  • Administrative Offices and Support Spaces
  • Shared Building Resources (Lobby, Multipurpose room(s) etc)

School of Business Project Updates

  • 950592 UCR SBB - Construction Alert #73

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Roofing System - South of E Line

    NA

    NA

    SBB (Lot 8) 

    Curtain Wall – Frames – EXT-L1

    NA

    NA

    SBB (Lot 8) 

    Set Thin Brick – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Set Thin Brick – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Punched Openings - Frames – EXT-SW

    NA

    NA

    SBB (Lot 8) 

    Curtain Wall - Frames – EXT-SW

    NA

    NA

    SBB (Lot 8)

    F/R/P Stair Treads/Landings – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Cement Board – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Install Feeder Cable / Home Runs – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    Controls Hook-up Equipment (Incl. Refrigerant Alarm) – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Set Distribution Board HDP-1A – MECH-L1

    NA

    NA

    SBB (Lot 8) 

    Install Feeder Cable from MSB – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Electrical Hook-up Equipment – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Branch Electrical – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Low Voltage – INT-L1

    NA

    NA

    SBB (Lot 8)

    Top Down Drywall / Fire Tape / TOW - Cafe

    NA

    NA

    SBB (Lot 8)

    Fire Tape – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Hang 2nd Side Drywall & Inspect – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Pull Low Voltage Cable – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Corner Bead – INT-L2

    NA

    NA

    SBB (Lot 8)

    Pull Electrical – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L4

    NA

    NA

    SBB (Lot 8)

    Pull Electrical – INT-L4 

    NA

    NA

    SBB (Lot 8)

    Fire Tape – RR-L4

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall – RR-L4

    NA

    NA

    SBB (Lot 8)

    Frame Ceiling – RR-L4

    NA

    NA

    SBB (Lot 8)

    Frame Elevator Fronts - ELEV

    NA

    NA

    SBB (Lot 8)

    Install Hoistway Wiring - ELEV

    NA

    NA

    Anderson Park

    F/R/P Site Walls – SITE-AP

    Heavy Equipment 

    Noise

    Anderson Park

    F/R/P Seat Benches – SITE-EAST

    Heavy Equipment

    Noise

     

    Week of April 8, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Roofing System - South of E Line

    NA

    NA

    SBB (Lot 8) 

    Curtain Wall – Frames – EXT-L1

    NA

    NA

    SBB (Lot 8) 

    Set Thin Brick – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Punched Openings - Glass – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Curtain Wall - Glass – EXT-SW

    NA

    NA

    SBB (Lot 8) 

    Grout Thin Brick – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install Hardlid Electrical – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Plumbing – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Cable Tray – INT-L1

    NA

    NA

    SBB (Lot 8)

    O/H MEP Rough-in - Cafe

    NA

    NA

    SBB (Lot 8)

    Tape Walls – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Hang 1st Side Drywall – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Cable Tray – INT-L3

    NA

    NA

    SBB (Lot 8) 

    Install Insulation & Inspect – INT-L3

    NA

    NA

    SBB (Lot 8)

    Fire Tape – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4

    NA

    NA

    SBB (Lot 8)

    Frame Ceiling – RR-L4

    NA

    NA

    SBB (Lot 8)

    Hang, Tape and Finish Elevator Fronts - ELEV

    NA

    NA

    Anderson Park

    F/R/P Site Walls – SITE-AP

    Heavy Equipment

    Noise

     

    Week of April 15, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Roofing System - North of E Line

    NA

    NA

    SBB (Lot 8) 

    Caulking – EXT-SW

    NA

    NA

    SBB (Lot 8) 

    Set & Grout Thin Brick – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Punched Openings - Frames & Glass – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Curtain Wall - Frames & Glass – EXT-SW

    NA

    NA

    SBB (Lot 8) 

    Punched Openings - Frames & Glass – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Curtain Wall - Frames & Glass – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Set & Grout Thin Brick – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Set Distribution Board HDP-1A – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Pull Low Voltage Cable – INT-L1

    NA

    NA

    SBB (Lot 8)

    Pull Electrical – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Hard lid Electrical – RR-L1

    NA

    NA

    SBB (Lot 8) 

    Tape Walls – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Conduit to Switchgear – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    Install Feeder Cable / Home Runs – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Fab/Deliver Ceiling Light Fixtures – RR-L2

    NA

    NA

    SBB (Lot 8)

    Prime & 1st Coat of Paint, Walls, Hard lids & Exposed Ceilings – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Operable Partition Track – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Grid – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Hard lid Electrical – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4

    NA

    NA

    SBB (Lot 8)

    Set Remaining Equipment / Install Feeder Cable / Home Runs – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    Hang 2nd Side Drywall & Inspect – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Hard lid Electrical – RR-L4

    NA

    NA

    SBB (Lot 8)

    Set, Hook-up & Terminate MTS - ELEC

    NA

    NA

    Anderson Park

    Backfill Planters – SITE AP

    Heavy Equipment

    Noise

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently 

    Lot 8

    Lot 43

    Lot 43

    Indefinitely 

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #72

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Controls Hook-up Equipment - RF

    NA

    NA

    SBB (Lot 8) 

    Secondary Air Barrier – EXT-L1

    NA

    NA

    SBB (Lot 8) 

    Secondary Air Barrier – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Set Thin Brick – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Punched Openings - Frames – EXT-SW

    NA

    NA

    SBB (Lot 8) 

    Curtain Wall - Frames – EXT-SW

    NA

    NA

    SBB (Lot 8)

    F/R/P Stair Treads/Landings – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Drainage Layer – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Install Electrical Gear ELEC-L1

    NA

    NA

    SBB (Lot 8)

    Controls Hook-up Equipment (Incl. Refrigerant Alarm) – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Frame Remaining Walls, Soffits & Hard lids – INT-L1

    NA

    NA

    SBB (Lot 8)

    In-Wall MEP Rough-in - Cafe

    NA

    NA

    SBB (Lot 8) 

    Hang Drywall – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Pull Low Voltage Cable – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Pressure Test Ductwork – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Feeder Cable / Home Runs – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Install Switchgear MSB – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    Hang 2nd Side Drywall & Inspect – INT-L2

    NA

    NA

    SBB (Lot 8)

    Pull Low Voltage Cable – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation – INT-L3

    NA

    NA

    SBB (Lot 8)

    Pressure Test Ductwork – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Feeder Cable / Home Runs – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Branch Electrical – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Low Voltage – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Hardlid Electrical – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Plumbing – INT-L3

    NA

    NA

    SBB (Lot 8)

    Fire Tape – INT-L4

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Feeder Cable / Home Run  – INT-L4

    NA

    NA

    SBB (Lot 8)

    Hang Top Down Drywall – RR-L4

    NA

    NA

    SBB (Lot 8)

    Complete Install Guide Rails - ELEV

    NA

    NA

    SBB (Lot 8)

    Install Entrances and Doors - ELEV

    NA

    NA

    SBB (Lot 8)

    Install Site Lighting Underground – SITE-AP

    NA

    NA

    SBB (Lot 8)

    F/R/P Site Walls – SITE-AP

    NA

    NA

     

    Week of April 1, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Roofing System - South of E Line

    NA

    NA

    SBB (Lot 8) 

    Curtain Wall – Frames – EXT-L1

    NA

    NA

    SBB (Lot 8) 

    Set Thin Brick – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Set Thin Brick – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Punched Openings - Frames – EXT-SW

    NA

    NA

    SBB (Lot 8) 

    Curtain Wall - Frames – EXT-SW

    NA

    NA

    SBB (Lot 8)

    F/R/P Stair Treads/Landings – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Cement Board – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Install Feeder Cable / Home Runs – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    Controls Hook-up Equipment (Incl. Refrigerant Alarm) – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Set Distribution Board HDP-1A – MECH-L1

    NA

    NA

    SBB (Lot 8) 

    Install Feeder Cable from MSB – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Electrical Hook-up Equipment – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Branch Electrical – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Low Voltage – INT-L1

    NA

    NA

    SBB (Lot 8)

    Top Down Drywall / Fire Tape / TOW - Cafe

    NA

    NA

    SBB (Lot 8)

    Fire Tape – INT-AUD

    NA

    NA

    SBB (Lot 8) 

    Hang 2nd Side Drywall & Inspect – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Pull Low Voltage Cable – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Corner Bead – INT-L2

    NA

    NA

    SBB (Lot 8)

    Pull Electrical – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L4

    NA

    NA

    SBB (Lot 8) 

    Pull Electrical – INT-L4    

    NA

    NA

    SBB (Lot 8)

    Fire Tape – RR-L4

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall – RR-L4

    NA

    NA

    SBB (Lot 8)

    Frame Ceiling – RR-L4

    NA

    NA

    SBB (Lot 8)

    Frame Elevator Fronts - ELEV

    NA

    NA

    SBB (Lot 8)

    Install Hoistway Wiring - ELEV

    NA

    NA

    SBB (Lot 8)

    F/R/P Site Walls – SITE-AP

    NA

    NA

    SBB (Lot 8)

    F/R/P Seat Benches – SITE-EAST

    NA

    NA

     

    Week of April 8, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Roofing System - South of E Line

    NA

    NA

    SBB (Lot 8) 

    Curtain Wall – Frames – EXT-L1

    NA

    NA

    SBB (Lot 8) 

    Set Thin Brick – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Punched Openings - Glass – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Curtain Wall - Glass – EXT-SW

    NA

    NA

    SBB (Lot 8) 

    Grout Thin Brick – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install Hardlid Electrical – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Plumbing – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Cable Tray – INT-L1

    NA

    NA

    SBB (Lot 8)

    O/H MEP Rough-in - Cafe

    NA

    NA

    SBB (Lot 8)

    Tape Walls – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Hang 1st Side Drywall – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Cable Tray – INT-L3

    NA

    NA

    SBB (Lot 8) 

    Install Insulation & Inspect – INT-L3

    NA

    NA

    SBB (Lot 8)

    Fire Tape – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4

    NA

    NA

    SBB (Lot 8)

    Frame Ceiling – RR-L4

    NA

    NA

    SBB (Lot 8)

    Hang, Tape and Finish Elevator Fronts - ELEV

    NA

    NA

    SBB (Lot 8)

    F/R/P Site Walls – SITE-AP

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently 

    Lot 8

    Lot 43

    Lot 43

    Indefinitely 

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #71

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install PV Panel System - North of E Line

    NA

    NA

    SBB (Lot 8) 

    Cement Board – EXT-L1

    NA

    NA

    SBB (Lot 8) 

    Secondary Air Barrier– EXT-L1

    NA

    NA

    SBB (Lot 8)

    Drainage Layer– EXT-NE

    NA

    NA

    SBB (Lot 8)

    Cement Board– EXT-NE

    NA

    NA

    SBB (Lot 8) 

    Secondary Air Barrier– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Erect Stairs– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install Communications Racks/Equipment -ELEC-L1

    NA

    NA

    SBB (Lot 8)

    Controls Hook-up Equipment (Incl. Refrigerant Alarm) – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation– MECH-L1

    NA

    NA

    SBB (Lot 8)

    Frame Remaining Walls, Soffits & Hard lids – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Pull Electrical – INT-AUD

    NA

    NA

    SBB (Lot 8) 

    Pull Low Voltage Cable – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    Hang 2nd Side Drywall & Inspect - INT-L2

    NA

    NA

    SBB (Lot 8)

    Pull Low Voltage Cable- INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Backing – RR-L2

    NA

    NA

    SBB (Lot 8)

    Install Insulation and Inspect – RR-L2

    NA

    NA

    SBB (Lot 8)

    Hang Drywall & Inspect– RR-L2

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Install Hardlid Electrical – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Plumbing – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Hard lid Electrical– RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Backing– RR-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Branch Electrical – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Low Voltage – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Hardlid Electrical – INT-L4

    NA

    NA

    SBB (Lot 8)

    Machine Room Wiring, Start-up, Running Platform - ELEV

    NA

    NA

    SBB (Lot 8)

    F/R/P Site Walls – SITE-AP

    NA

    NA

    SBB (Lot 8)

    Install Site Lighting Underground – SITE-AP

    NA

    NA

     

    Week of March 25, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Curtain Wall – Frames – EXT-L1

    NA

    NA

    SBB (Lot 8) 

    Set Thin Brick – EXT-L1

    NA

    NA

    SBB (Lot 8) 

    Cement Board – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Set Thin Brick – EXT-SW

    NA

    NA

    SBB (Lot 8) 

    Punched Openings – Frames – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Curtain Wall – Frames – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Branch Electrical - INT-L1

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Low Voltage - INT-L1

    NA

    NA

    SBB (Lot 8)

    Hang Drywall – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Pressure Test Ductwork – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Feeder Cable / Home Runs – ELEC-AUD

    NA

    NA

    SBB (Lot 8) 

    Install Switchgear MSB – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    Install Feeder Cable / Home Runs – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    Tape Walls Soffits & Hard lids – RR-L2

    NA

    NA

    SBB (Lot 8)

    Install Feeder Cable / Home Runs – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Hang 1st Side Drywall – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Cable Tray– INT-L3

    NA

    NA

    SBB (Lot 8) 

    Pull Electrical– INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Insulation & Inspect– INT-L3

    NA

    NA

    SBB (Lot 8)

    Fire Tape– INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Insulation & Inspect – RR-L3

    NA

    NA

    SBB (Lot 8)

    Hang Drywall & Inspect – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L4

    NA

    NA

    SBB (Lot 8) 

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4

    NA

    NA

    SBB (Lot 8)

    Pull Electrical – INT-L4

    NA

    NA

    SBB (Lot 8)

    Hang Top Down Drywall – RR-L4

    NA

    NA

    SBB (Lot 8)

    Fire Tape – RR-L4

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall – RR-L4

    NA

    NA

    SBB (Lot 8)

    Complete Install Guide Rails - ELEV

    NA

    NA

     

    Week of April 1, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Roofing System - South of E Line

    NA

    NA

    SBB (Lot 8) 

    Curtain Wall – Frames – EXT-L1

    NA

    NA

    SBB (Lot 8) 

    Set Thin Brick – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Punched Openings – Frames – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Curtain Wall – Frames – EXT-NE

    NA

    NA

    SBB (Lot 8) 

    Set Thin Brick – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Set Thin Brick – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Punched Openings – Frames – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Curtain Wall – Frames – EXT-SW

    NA

    NA

    SBB (Lot 8)

    F/R/P Stair Treads/Landings – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install Feeder Cable / Home Runs – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    Set Distribution Board HDP-1A - MECH-L1

    NA

    NA

    SBB (Lot 8)

    Install Feeder Cable from MSB - MECH-L1

    NA

    NA

    SBB (Lot 8) 

    Install In-Wall & Branch Electrical – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Low Voltage – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Hardlid Electrical – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Plumbing – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Cable Tray – INT-L1

    NA

    NA

    SBB (Lot 8)

    Frame Ceiling – RR-L1

    NA

    NA

    SBB (Lot 8)

    Fire Tape - INT-AUD

    NA

    NA

    SBB (Lot 8)

    Hang 2nd Side Drywall & Inspect - INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Conduit to Switchgear – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    Tape Walls Soffits & Hard lids – INT-L2

    NA

    NA

    SBB (Lot 8)

    Hang 1st Side Drywall – INT-L3

    NA

    NA

    SBB (Lot 8)

    Pull Low Voltage Cable – INT-L3

    NA

    NA

    SBB (Lot 8)

    Pull Electrical – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Insulation & Inspect – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4

    NA

    NA

    SBB (Lot 8)

    Pull Electrical – INT-L4

    NA

    NA

    SBB (Lot 8)

    Fire Tape – RR-L4

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall – RR-L4

    NA

    NA

    SBB (Lot 8)

    Frame Ceiling – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install Entrances and Doors - ELEV

    NA

    NA

    SBB (Lot 8)

    Frame Elevator Fronts - ELEV

    NA

    NA

    SBB (Lot 8)

    Install Hoistway Wiring - ELEV

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently 

    Lot 8

    Lot 43

    Lot 43

    Indefinitely 

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #70

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Controls Hook-up Equipment

    NA

    NA

    SBB (Lot 8)

    Coordinate Drainage Layer Install – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Drainage Layer – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Erect Steel Structure for Stairs - EXT-SW

    NA

    NA

    SBB (Lot 8)

    Drainage Layer - EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Ductwork, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Set Plumbing Equipment – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Install Operable Partition Track -INT-L1

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Branch Electrical – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Low Voltage – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Frame Soffit – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Hang 1st Side Drywall – INT-L2

    NA

    NA

    SBB (Lot 8)

    Pull Electrical– INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Insulation & Inspect– INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Cable Tray– INT-L2

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Hard lid Electrical – RR-L2

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation – INT-L3

    NA

    NA

    SBB (Lot 8)

    Pressure Test Ductwork – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Branch Electrical – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Low Voltage – INT-L3

    NA

    NA

    SBB (Lot 8)

    Frame Ceiling – RR-L3

    NA

    NA

    SBB (Lot 8)

    Hang 1st Side Top Down Drywall – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Insulation & Inspect – INT-L4

    NA

    NA

    SBB (Lot 8)

    Hang 2nd Side Top Down Drywall & Inspect – INT-L4

    NA

    NA

    SBB (Lot 8)

    Insulate Test Hot/Cold Supply & Return Mech Lines – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Mechanical / FSD's – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    Frame Remaining Walls, Soffits & Hard lids – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Plumbing

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Branch Electrical

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Low Voltage

    NA

    NA

    SBB (Lot 8)

    Install Hardlid Electrical

    NA

    NA

    SBB (Lot 8)

    Install Irrigation Sleeves – SITE-AP

    NA

    NA

    SBB (Lot 8)

    Install Site Lighting Underground – SITE-AP

    NA

    NA

     

    Week of March 18, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Install PV Panel System - North of E Line

    NA

    NA

    SBB (Lot 8)

    Cement Board – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier– EXT-L1

    NA

    NA

    SBB (Lot 8)

    Drainage Layer– EXT-NE

    NA

    NA

    SBB (Lot 8)

    Cement Board– EXT-NE

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Erect Stairs– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install Communications Racks/Equipment -ELEC-L1

    NA

    NA

    SBB (Lot 8)

    Controls Hook-up Equipment (Incl. Refrigerant Alarm) – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation– MECH-L1

    NA

    NA

    SBB (Lot 8)

    Frame Remaining Walls, Soffits & Hard lids – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Pull Electrical – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Pull Low Voltage Cable – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    Hang 2nd Side Drywall & Inspect - INT-L2

    NA

    NA

    SBB (Lot 8)

    Pull Low Voltage Cable- INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Backing – RR-L2

    NA

    NA

    SBB (Lot 8)

    Install Insulation and Inspect – RR-L2

    NA

    NA

    SBB (Lot 8)

    Hang Drywall & Inspect– RR-L2

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Install Hardlid Electrical – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Plumbing – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Hard lid Electrical– RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Backing– RR-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Branch Electrical – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Low Voltage – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Hardlid Electrical – INT-L4

    NA

    NA

    SBB (Lot 8)

    Machine Room Wiring, Start-up, Running Platform - ELEV

    NA

    NA

    SBB (Lot 8)

    F/R/P Site Walls – SITE-AP

    NA

    NA

    SBB (Lot 8)

    Install Site Lighting Underground – SITE-AP

    NA

    NA

     

    Week of March 25, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Curtain Wall – Frames – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Set Thin Brick – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Cement Board – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Set Thin Brick – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Punched Openings – Frames – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Curtain Wall – Frames – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Branch Electrical - INT-L1

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Low Voltage - INT-L1

    NA

    NA

    SBB (Lot 8)

    Hang Drywall – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Pressure Test Ductwork – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Feeder Cable / Home Runs – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Install Switchgear MSB – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    Install Feeder Cable / Home Runs – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    Tape Walls Soffits & Hard lids – RR-L2

    NA

    NA

    SBB (Lot 8)

    Install Feeder Cable / Home Runs – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Hang 1st Side Drywall – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Cable Tray– INT-L3

    NA

    NA

    SBB (Lot 8)

    Pull Electrical– INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Insulation & Inspect– INT-L3

    NA

    NA

    SBB (Lot 8)

    Fire Tape– INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Insulation & Inspect – RR-L3

    NA

    NA

    SBB (Lot 8)

    Hang Drywall & Inspect – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4

    NA

    NA

    SBB (Lot 8)

    Pull Electrical – INT-L4

    NA

    NA

    SBB (Lot 8)

    Hang Top Down Drywall – RR-L4

    NA

    NA

    SBB (Lot 8)

    Fire Tape – RR-L4

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall – RR-L4

    NA

    NA

    SBB (Lot 8)

    Complete Install Guide Rails - ELEV

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently

    Lot 8

    Lot 43

    Lot 43

    Indefinitely

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #69

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    HVAC Ductwork, Hook-up & Insulation

    NA

    NA

    SBB (Lot 8)

    Stuff & Spray Deck Edge

    NA

    NA

    SBB (Lot 8)

    Install PV Panel System - South of E Line

    NA

    NA

    SBB (Lot 8)

    Curtain Wall – Frames – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Set Thin Brick – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Curtain Wall – Frames – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Punched Openings – Glass – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier – EXT-SW

    NA

    NA

    SBB (Lot 8)

    F/R/P Stair Treads/Landings – EXT-SW

    NA

    NA

    SBB (Lot 8)

    HVAC Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Pull Low Voltage Cable – INT-L1

    NA

    NA

    SBB (Lot 8)

    Pull Electrical – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Install O/H Electrical Home Runs – INT-L2

    NA

    NA

    SBB (Lot 8)

    Insulate Test Hot/Cold Supply & Return Mech Lines – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    Install O/H Hot/Cold Supply & Return Branch Mech Lines & Seismic – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Electrical Home Runs – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Lights and Receptacles - ELEV

    NA

    NA

    SBB (Lot 8)

    F/R/P Site Walls – Anderson Park

    NA

    NA

     

    Week of March 11, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Install PV Panel System - South of E Line

    NA

    NA

    SBB (Lot 8)

    Curtain Wall – Frames – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Set Thin Brick – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Punched Openings – Glass – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Set Thin Brick – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Punched Openings – Frames - EXT-SW

    NA

    NA

    SBB (Lot 8)

    F/R/P Stair Treads/Landings - EXT-SW

    NA

    NA

    SBB (Lot 8)

    Set Thin Brick - EXT-SW

    NA

    NA

    SBB (Lot 8)

    Hang 1st Side Drywall – INT-L1

    NA

    NA

    SBB (Lot 8)

    Pull Low Voltage Cable – INT-L1

    NA

    NA

    SBB (Lot 8)

    Pull Electrical – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Fire Sprinkler Mains, Branches & Seismic – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install O/H Waste & Vent – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Frame Remaining Walls, Soffits & Hard lids – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install O/H Hot/Cold Supply & Return Branch Mech Lines & Seismic – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Electrical Home Runs – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4              

    NA

    NA

    SBB (Lot 8)

    Set, Hook-up & Terminate MTS – Electrical

    NA

    NA

     

    Week of March 18, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Install PV Panel System - North of E Line

    NA

    NA

    SBB (Lot 8)

    Cement Board – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier– EXT-L1

    NA

    NA

    SBB (Lot 8)

    Drainage Layer– EXT-NE

    NA

    NA

    SBB (Lot 8)

    Cement Board– EXT-NE

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Erect Stairs– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install Communications Racks/Equipment -ELEC-L1

    NA

    NA

    SBB (Lot 8)

    Controls Hook-up Equipment (Incl. Refrigerant Alarm) – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation– MECH-L1

    NA

    NA

    SBB (Lot 8)

    Frame Remaining Walls, Soffits & Hard lids – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Pull Electrical – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Pull Low Voltage Cable – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    Hang 2nd Side Drywall & Inspect - INT-L2

    NA

    NA

    SBB (Lot 8)

    Pull Low Voltage Cable- INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Backing – RR-L2

    NA

    NA

    SBB (Lot 8)

    Install Insulation and Inspect – RR-L2

    NA

    NA

    SBB (Lot 8)

    Hang Drywall & Inspect– RR-L2

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Install Hardlid Electrical – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Plumbing – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Hard lid Electrical– RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Backing– RR-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Branch Electrical – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Low Voltage – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Hardlid Electrical – INT-L4

    NA

    NA

    SBB (Lot 8)

    Machine Room Wiring, Start-up, Running Platform - ELEV

    NA

    NA

    SBB (Lot 8)

    F/R/P Site Walls – SITE-AP

    NA

    NA

    SBB (Lot 8)

    Install Site Lighting Underground – SITE-AP

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently

    Lot 8

    Lot 43

    Lot 43

    Indefinitely

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #68

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Electrical Hook-up Equipment

    NA

    NA

    SBB (Lot 8)

    Install PV Panel Secondary Framing - North of E Line

    Crane

    Noise Due to Equipment

    SBB (Lot 8)

    HVAC Piping, Hook-up & Insulation

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Drainage Layer – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Cement Board – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation & Air Water Barrier – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Field Measure for Curtain Wall – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Drainage Layer – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install O/H Electrical Home Runs – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation – INT-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Ductwork, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Controls Hook-up Equipment – MECH-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Install Hot/Cold Domestic Water Lines & Seismic – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Tape Walls – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Hot/Cold Domestic Water Lines & Seismic – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Waste & Vent – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L3

    NA

    NA

    SBB (Lot 8)

    Tape Walls – ELEC-L3

    NA

    NA

     

    Week of March 4, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    HVAC Ductwork, Hook-up & Insulation

    NA

    NA

    SBB (Lot 8)

    Stuff & Spray Deck Edge

    NA

    NA

    SBB (Lot 8)

    Install PV Panel System - South of E Line

    Crane

    Noise Due to Equipment

    SBB (Lot 8)

    Curtain Wall – Frames – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Set Thin Brick – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Curtain Wall – Frames – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Punched Openings – Glass – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier – EXT-SW

    NA

    NA

    SBB (Lot 8)

    F/R/P Stair Treads/Landings – EXT-SW

    NA

    NA

    SBB (Lot 8)

    HVAC Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Pull Low Voltage Cable – INT-L1

    NA

    NA

    SBB (Lot 8)

    Pull Electrical – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Install O/H Electrical Home Runs – INT-L2

    NA

    NA

    SBB (Lot 8)

    Insulate Test Hot/Cold Supply & Return Mech Lines – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    Install O/H Hot/Cold Supply & Return Branch Mech Lines & Seismic – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Electrical Home Runs – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Lights and Receptacles - ELEV

    NA

    NA

    SBB (Lot 8)

    F/R/P Site Walls – Anderson Park

    NA

    NA

     

    Week of March 11, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Install PV Panel System - South of E Line

    Crane

    Noise Due to Equipment

    SBB (Lot 8)

    Curtain Wall – Frames – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Set Thin Brick – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Punched Openings – Glass – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Set Thin Brick – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Punched Openings – Frames - EXT-SW

    NA

    NA

    SBB (Lot 8)

    F/R/P Stair Treads/Landings - EXT-SW

    NA

    NA

    SBB (Lot 8)

    Set Thin Brick - EXT-SW

    NA

    NA

    SBB (Lot 8)

    Hang 1st Side Drywall – INT-L1

    NA

    NA

    SBB (Lot 8)

    Pull Low Voltage Cable – INT-L1

    NA

    NA

    SBB (Lot 8)

    Pull Electrical – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Fire Sprinkler Mains, Branches & Seismic – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install O/H Waste & Vent – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Frame Remaining Walls, Soffits & Hard lids – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install O/H Hot/Cold Supply & Return Branch Mech Lines & Seismic – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Electrical Home Runs – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4          

    NA

    NA

    SBB (Lot 8)

    Set, Hook-up & Terminate MTS – Electrical

    NA

    NA

     

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently

    Lot 8

    Lot 43

    Lot 43

    Indefinitely

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #67

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Exterior Framing – East Elevation

    NA

    NA

    SBB (Lot 8)

    F/R/P Stair Treads/Landings – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Exterior Framing - North Elevation – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation & Air Water Barrier – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Field Measure for Curtain Wall – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Erect Steel Structure for Stairs – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation & Air Water Barrier– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Exterior Framing - South Elevation– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Field Measure for Curtain Wall– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Drainage Layer– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Cement Board– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Erect Stairs– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation– INT-L1

    NA

    NA

    SBB (Lot 8)

    Pressure Test Hot/Cold Supply & Return Mech Lines– INT-L1

    NA

    NA

    SBB (Lot 8)

    Insulate Test Hot/Cold Supply & Return Mech Lines– INT-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Ductwork, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Controls Hook-up Equipment (Incl. Refrigerant Alarm) – MECH-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Set Distribution Board HDP-1A – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Hang Drywall – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Tape Walls – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Prime & 1st Coat of Paint, Walls & Exposed Ceilings – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Install Hot/Cold Supply & Return Mech Lines & Seismic – INT-L2

    NA

    NA

    SBB (Lot 8)

    Pressure Test Ductwork– INT-L2

    NA

    NA

    SBB (Lot 8)

    Install O/H Electrical Home Runs – INT-L2

    NA

    NA

    SBB (Lot 8)

    Tape Walls – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall– ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Fire Tape – INT-L4

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install O/H Waste and Vent – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Insulation and Inspect – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    Hang Drywall and Inspect – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    Tape Walls – ELEC-L4

    NA

    NA

     

    Week of February 26, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Electrical Hook-up Equipment

    NA

    NA

    SBB (Lot 8)

    Install PV Panel Secondary Framing - North of E Line

    Crane

    Noise Due to Equipment

    SBB (Lot 8)

    HVAC Piping, Hook-up & Insulation

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Drainage Layer – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Cement Board – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation & Air Water Barrier – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Field Measure for Curtain Wall – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Drainage Layer – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install O/H Electrical Home Runs – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation – INT-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Ductwork, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Controls Hook-up Equipment – MECH-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Install Hot/Cold Domestic Water Lines & Seismic – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Tape Walls – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Hot/Cold Domestic Water Lines & Seismic – INT-L3

    NA